Loading...
HomeMy WebLinkAboutAD105 Plaza Level Demolition Plan - Area BProject: Developer: Sheet Number: Carmel, Indiana 46032 317.705.7980 (fax) 355 City Center Drive 317.705.7979 (phone) Architect: By: Sheet Title: COPYRIGHT & OWNERSHIP OF DOCUMENTS Architecture / Project Management: Project Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWREN BUILDINGCarmel, IN 46032750 Veteran's WayPEDCOR DESIGN GROUP LLC Plaza Level Demolition Plan - Area B THIS DOCUMENT IS AN INSTRUMENT OF SERVICES AND IS THE SOLE PROPERTY OF THE ARCHITECT AND PEDCOR DESIGN GROUP, LLC. ALL INFORMATION CONTAINED HEREIN IS CONFIDENTIAL. ITS SUBMISSION AND DISTRIBUTION TO OTHER PARTIES IS NOT TO BE CONSTRUED AS PUBLICATION IN DEROGATION OF COMMON LAW COPYRIGHT, INTELLECTUAL PROPERTY RIGHTS OR OTHER RESERVED RIGHTS. ALL INFORMATION CONTAINED HEREIN CONSTITUTES THE ORIGINAL AND PUBLISHED WORK OF THE ARCHITECT, JAMES R. STUTZMAN, AND PEDCOR DESIGN GROUP, LLC. NO PART OR WHOLE OF THIS DESIGN, THESE DRAWINGS, OR THE RESULTING BUILDING OR BUILDINGS, OR PORTIONS OF THE RESULTING BUILDING OR BUILDINGS MAY BE DUPLICATED, COPIED, EXHIBITED, PHOTOGRAPHED, PUBLISHED, MODIFIED OR OTHERWISE DISTRIBUTED IN ANY WAY WITHOUT THE SPECIFIC AND PRIOR WRITTEN CONSENT OF THE ARCHITECT, JAMES R. STUTZMAN AND PEDCOR DESIGN GROUP, LLC. © COPYRIGHT 2021 JAMES R. STUTZMAN, AIA, Carmel, Indiana. CONSTRUCTION DOCUMENTS 02-20-202011/26/2019 A D 10 5 Revision ID Transmittal Set Date Transmittal Set Name Change Name Change ID 01 5/10/21 Steel Release #2 BID PHASE II ADD OPENING IN STAIR #3, STEEL RELEASE - BID PHASE II 18, 20 Tuesday, October 5, 2021, BIMcloud: pedcordesign - BIMcloud as a Service/Wren - Building J/Building J Wren345678910DOWN6 7 8 9 10 123451234567898910891011123456789101112UP1 2 3 CL CL345DOWN1234567UP123456UP8TREADSCL CL CL CL xJ.3xJ.2 xJ xJ.3 GENERAL DEMOLITION NOTE: Remove selected concrete, shown in black hatch. A B C D E F G H CONCRETE DEMOLITION PLAN NOTES: Existing column pier to be removed down to T/pier cap. Existing concrete column to be removed. Take out material down 12" below the lowest new finished floor of the space. The face of cast-in-place slab at the plaza edge, must be cut to align its edge with the face of the precast beam below. See Overall Demolition Plan AD103. Top of precast wall to be trimmed down. Reference drawings pertaining to precast stair changes. Remove flange of precast concrete 'T' back to 1'-0" off column centerline. See Overall Demolition Plan AD103. Existing Stair to parking garage - remove portions of stair, top portions of PC wall and other related stair items. Ref. shts. A306 & A416 for extent of demolition work. Remove portion of foundation wall where step occurs so it is level with top of wall to the north. Remove portion of plaza deck to allow installation of 2" expansion joint around perimeter of new building. 2'-7 3/4"8'-8"1'2" 5 AD104 H H EDGE OF EXISTING PLAZA EDGE OF EXISTING PLAZA EDGE OF EXISTING PLAZA SIM. 2"10"6'-2 1/2"3 1/2"2"2"1'3 1/4"1'-4 3/4"2'-4 1/4"3'-6"6'-8 1/2"3'-6"6'-8 1/2"3'-6"6'-8 1/2"3'-6"5'-11 1/4"3'-9 1/4"3'-1/2"3'-7 1/4"1'-6"1'-5 3/4"2" 10" 2" 3 1/2" 6 1/2" 5 AD104 5 AD104 H H H H H H SIM. EDGE OF EXISTING PLAZA EDGE OF EXISTING PLAZA EDGE OF EXISTING PLAZA MATCH LINE 2'-4 1/4"1'-3"SCALE: 1/2" = 1'-0" 2 Plaza Level Demolition Plan AD105 0 1'2'4' SCALE: 1/2" = 1'-0" 1 Plaza Level Demolition Plan AD105 0 1'2'4'3'-6"2'-2 1/4"3'-1/2"3'-9 1/4"2'-2 1/4"3'-1/2"2'-4 1/4"1'-4 3/4"2" 3 1/2"6 1/2" 5 AD104 H H H EDGE OF EXISTING PLAZA EDGE OF EXISTING PLAZA MATCH LINE SCALE: 1/2" = 1'-0" 3 Plaza Level Demolition Plan AD105 0 1'2'4' x17 x16.9 x16 xJ x14 13.9 1.7 x13 13.1 xJ.2 x12