Loading...
HomeMy WebLinkAboutEL101A - 1ST FLOOR LIGHTING PLAN - AREA AM H2 - 2 'K8-E' H1 - 55 'K2' EM - 20 'K1' H1 - 55 'K2' H1 - 52 'K1' EM - 20 'K1' H1 - 52 'K1' H1 - 52 'K1' EM - 20 'K1' H1 - 52 'L12' EM - 20 'L14' H1 - 52 'K6' H2 - 22 'K1' EM - 20 'K1' EM - 20 'K1' H2 - 22 'K1' H1 - 55 'K2' EM - 20 'K1' H2 - 19 'K1' EM - 20 'K1' H2 - 17 'K8-E' H2 - 17 'K8-E' H2 - 17 'X1' H2 - 2 'K8-E' EM - 20 'K1' H2 - 19 'K1' EM - 20 'K1' EM - 20 'K1' H2 - 19 'K1' H2 - 21 'K1' EM - 20 'K1' EM - 20 'K1' H2 - 21 'K1' EM - 20 'K1' H2 - 21 'K1' EM - 20 'K1' H2 - 21 'K1' EM - 20 'K1' H2 - 21 'K1' H2 - 21 'K1' H2 - 22 'K1' H2 - 22 'K1' EM - 20 'K1' H2 - 22 'K1' H2 - 19 'X1' ELEV. 5 EXISTING STAIR COMMERCIAL TENANT STAIR 3 VESTIBULE ELEV 6 PUMP ROOM WATER ROOM GENERAL SERVICES CORRIDOR STAIR 2 PUBLIC LOBBY ELEV 4 ELEV 3 RESIDENTIAL LOBBY ELEV MACHINE ROOM ELEV. MACH. ROOM EM - 20 'K1' H2 - 22 'K1' H1 - 52 'X1' 1 3 N/L EM - 30 'K13-E' EM - 8 'K13-E' EM - 29 'K13-E' N/L 'EMR' ELEV 7 ELECTRICAL EQ EQ EQ EQ EQ EQ EQ H2 - 21 'X2' 4 4 H1 - 52 'X1' H1 - 55 'EMR' EM - 8 'K13-E' 4 4 EM - 20 'K1' 5 6 7 ? 'K8-E' 4 H2 - 19 'K4' H2 - 19 'K4' EM - 20 'K4' EM - 20 'K4' H1 - 52 'K4' EM - 20 'K4' EM - 20 'K4' EM - 25 'K13-E' EM - 25 'K13-E'EM - 8 'K13-E' EM - 8 'K13-E' EM - 26 'K13-E' EM - 26 'K13-E' EM - 28 'K13-E' EM - 28 'K13-E' 8 8 8 8 EM - 30 'K13-E' EM - 29 'K13-E' EM - 20 'X2' 9 TENANT VESTIBULE H2 - 19 'K1' EM - 20 'X1' 9 EM - 20 'X1' 3 1 9 1 1 3 9 EM - 20 'X2' 1 GENERAL SHEET NOTES A. SEE SHEET E-001 FOR SYMBOLS AND ABBREVIATIONS. B. REFER TO SHEET E-501 FOR LIGHTING FIXTURE SCHEDULE. C. SEE SHEETS E-501 THROUGH E-503 FOR PANEL SCHEDULES. D. SEE SHEETS E-601 THROUGH E-602 FOR ELECTRICAL DETAILS. E. COORDINATE INSTALLATION OF LIGHTING FIXTURES WITH ARCHITECTURAL REFLECTED CEILING PLANS, ARCHITECTURAL ELEVATIONS, MECHANICAL EQUIPMENT, DIFFUSERS, SUPPORTS, PIPING, DUCTWORK AND STRUCTURAL PLANS PRIOR TO ROUGH-IN AND INSTALLATION OF LIGHTS. F. ALL MOUNTING HEIGHTS NOTED ON THE PLANS ARE TO THE BOTTOM OF THE FIXTURES UNLESS NOTED OTHERWISE. G. LOCATE CEILING MOUNTED OCCUPANCY SENSORS TO PROVIDE COMPLETE AREA COVERAGE OF THE SPACE THEY ARE INSTALLED IN. SELECT PROPER SENSOR COVERAGE PATTERN FROM MANUFACTURER'S PRODUCT DATA TO DETERMINE COVERAGE. ADDITIONAL SENSORS REQUIRED DUE TO LACK OF COVERAGE SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND THE MANUFACTURER. SENSORS SHALL INCLUDE ALL POWER SUPPLIES AND RELAYS NECESSARY FOR PROPER OPERATION. H. WIRING SYSTEM SHALL BE CONDUIT AND CONDUCTOR UNLESS NOTED OTHERWISE. USE SOLID CONDUCTOR FOR SIZE #10 AWG AND SMALLER. USE STRANDED CONDUCTOR FOR LARGER SIZES. I. ALL COVER PLATES FOR ELECTRICAL DEVICES SHALL BE OF A COLOR TO MATCH THE AREA COLOR SCHEME AS DIRECTED BY THE INTERIOR DESIGNER. J. LABEL ALL RELAYS AND POWER SUPPLIES (ON THE DEVICE OR ON THE BOX THEY ARE CONNECTED TO) WITH THE AREA THE DEVICES SERVES, THE BRANCH CIRCUIT IT CONTROLS AND THE DEVICE ADDRESS (IF APPLICABLE). K. EMERGENCY LIGHTING SHOWN ON THIS DRAWING INDICATES CODE REQUIRED EMERGENCY LIGHTING FED FROM THE "EMERGENCY BRANCH" OF THE ESSENTIAL ELECTRICAL SYSTEM. L. REFER TO ARCHITECTURAL DRAWINGS FOR DIMENSIONS, ROOM AND AREA FINISHES, CEILING PLANS, DOOR SWINGS, FIRE-RATED PARTITIONS, CABINET AND CASEWORK AND BUILT-IN DETAILS. M. ALL WORK SHALL COMPLY WITH ALL NATIONAL, STATE AND LOCAL CODES AND ORDINANCES PERTAINING TO THE WORK IN THIS PROJECT. N. EXPOSED CONDUIT SHALL BE RUN PARALLEL TO AND AT RIGHT ANGLES TO BUILDING LINES. O. REFER TO ARCHITECTURAL DRAWINGS FOR DESIGNATION AND LISTING OF FIRE RATED ASSEMBLIES. COORDINATE ALL DESIGN EFFORTS WITH FIRE RESISTANCE OF MATERIALS AND CONSTRUCTION. P. ALL EXTERIOR EQUIPMENT AND DEVICES SHALL BE WEATHER PROOF AND RAIN TIGHT. Q. TYPE K8E FIXTURES AT STAIRS TO BE MOUNTED AT +8'-0" A.F.F. TO BOTTOM OF LIGHT FIXTURE UNLESS NOTED OTHERWISE. R. THE EC IS RESPONSIBLE FOR VERIFYING (FIELD VERIFICATION IF NECESSARY) ALL PENDANT LENGTHS. S. REFER TO ARCHITECTURAL ELEVATIONS FOR MOUNTING HEIGHT OF EXTERIOR BUILDING MOUNTED LIGHT FIXTURE TYPES 'K9', 'K10', 'K2' AND EMR. T. EXIT SIGNS MOUNTED ABOVE DOORS TO BE +0'-6" ABOVE FINISHED DOOR FRAME TO BOTTOM OF EXIT SIGN. EXITS NOT LOCATED ABOVE DOOR TO BE MOUNTED AT 7'-6" AFF TO BOTTOM OF EXIT SIGN UNLESS NOTED OTHERWISE. U. REFER TO ARCHITECTURAL ELEVATIONS FOR MOUNTING HEIGHT OF EXTERIOR LIGHT FIXTURE. TYPES 'K9', 'K10', 'K2' AND 'EMR'. 19030 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS750 Veterans WayKEYPLAN B A NOT FOR CONSTRUCTION EL101A 1ST FLOOR LIGHTING PLAN - AREA A 11/24/2111/24/21 1/8" = 1'-0" 1ST FLOOR LIGHTING PLAN - AREA A1016'8'4' N SHEET PLAN NOTES 1 MOUNT BOTTOM OF FIXTURE AT 10'-0" A.F.F. COORDINATE EXACT MOUNTING HEIGHT IN FIELD. 3 MOUNT BOTTOM OF FIXTURE AT 10'-0" A.F.F. 4 MOUNT BOTTOM OF FIXTURE AT 8'-0" A.F.F. 5 MOUNT LIGHT FIXTURE AT 5'-6" A.F.F. TO CENTER OF LIGHT FIXTURE. 6 MOUNT SUSPENDED LIGHT FIXTURE AT 8'-0" A.F.F. TO BOTTOM OF LIGHT FIXTURE. 7 MOUNT LIGHT FIXTURE AT 6' A.F.F. TO CENTER OF LIGHT FIXTURE. 8 LOCATE LIGHT FIXTURE IN ELEVATOR PIT. PROVIDE 12 HOUR MECHANICAL TIMER SWITCH FOR LIGHT FIXTURE. FIELD COORDINATE LOCATION WITH ELEVATOR INSTALLER. 9 SUSPEND EXIT SIGN ON RIGID STEM WITH ALL THREAD. BOTTOM OF EXIT TO BE 9'-0" AFF.11/24/2111/24/21 BUILDING SHELL BID PHASE III