HomeMy WebLinkAboutH-101A - 1ST FLOOR HVAC PLAN - AREA AEWH-1
CC-1
EUH-2
HP-CC-1
CC-2
HP-CC-2
EUH-4
EWH-1
EWH-1
EWH-1
1
HP-CC-4
1
1
EUH-2
3
3
4
8/8 F100 F 8/8
10016/1016/108/10
8/8 8/10
8/8
FDFD
FD
EWH-1
CC-4
HP-CC-4 1
EWH-1
F 10/4
125
F 10/4
125
F 10/4
125
11700201
No.
STATE OFJOSEPHR.BO
L
Y
ARDPROFES
S ION A L E N G INEERLICENSE EXPIRES 07/31/22
DATE SIGNED 11/24/21
R E G I S TER
E
D
I
ND I A N A
19030
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS750 Veterans Way11/24/21 BUILDING SHELL BID
PHASE III
H-101A
1ST FLOOR HVAC
PLAN - AREA A
11/24/2111/24/21
RWEH
N
0 16'8'4'1/8" = 1'-0"
1ST FLOOR HVAC PLAN - AREA A1
SHEET PLAN NOTES
1 MOUNT HEAT PUMP ON PARKING GARAGE WALL. PENETRATE REFRIGERANT
LINES DIRECTLY THROUGH WALLS. INSULATE, SLEEVE, AND CAULK AT
PENETRATION.
3 ROUTE CONDENSATE TO HUB DRAIN IN ELEVATOR MACHINE ROOM 108.
4 ROUTE CONDENSATE TO HUB DRAIN IN STORAGE 111.