HomeMy WebLinkAboutH-302 - ENLARGED HVAC PLANST
T
TT
T
FCU-3
14/125"ø
7"ø
7"ø
7"ø
7"ø
5"ø
SG 12/6
285
SG 6/6
50
6/6 SG50
12/6 SG250
12/6 SG170
SG 12/6
170
1
1
1
1
1
1
2
3
4
5
6
7 8 9
10
4
2
G-
24/10
20/20 G975
4ø
6ø EF-1
2
EF-1
DBF-1
G -
24/10 6
FD
G 24/10
565
SG 6/6
50
EF-1
FCU-1
12/105"ø
7"ø
7"ø
7"ø
12/6 SG200
12/6 SG215
12/6 SG100
1
1
1
1
2
3
4
5
987
6ø
4ø
DBF-1
G -
24/10
6
6
G -
24/10
6
FD
EF-1
1
1
1
1
1
2
3
4
5
7 8 9
6ø
4ø
G 24/10
565
G-
24/106
6
DBF-1
G-
24/106
FD
FCU-1
12/6 SG180
12/6 SG185
SG 12/6
100
SG 6/6
50
SG 6/6
50
12/10FCU-1
EF-1
6/6 SG50
5"ø
5"ø
SG 6/6
50
12/6 SG120
12/6 SG175
12/6 SG170
12/107"ø
7"ø
7"ø
1
11
1
1
2
3
4
5
7 8 9
G 24/10
565
DBF-1
6
G -
24/10 6
G-
24/10
6
FD
FCU-2
12/12
EF-1
EF-1
24/12 G675
5"ø
7"ø
5"ø
7"ø
5"ø
7"ø
12/6 SG150 SG 6/6
50
12/6 SG150
6/6 SG50SG6/6
50
SG 12/6
75
12/6 SG150
1
1
1
1
1
1
1
3
2
4
4
5
987
2
2
7"ø
6
G -
24/10 6
FD
G -
24/10 6
11700201
No.
STATE OFJOSEPHR.BO
L
Y
ARDPROFES
S ION A L E N G INEERLICENSE EXPIRES 07/31/22
DATE SIGNED 11/24/21
R E G I S TER
E
D
I
ND I A N A
19030
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS750 Veterans Way11/24/21 BUILDING SHELL BID
PHASE III
H-302
ENLARGED HVAC
PLANS
11/24/2111/24/21
RWEH
1/4" = 1'-0"
Unit Type B1 Enlarged HVAC Plan4
SHEET PLAN NOTES
1 FURNISH AND INSTALL CEILING RADIATION DAMPER AT ALL LOCATIONS
WHERE GRILLES PENETRATE A FIRE RATED CEILING.
2 TERMINATE EXHAUST DUCT WITH WALL VENT. CUSTOM COLOR TO BE
SELECTED BY ARCHITECT. BASIS OF DESIGN FOR VENT CAP IS DEFLECTO
MODEL HSB4W. SEE ARCHITECTURAL ELEVATIONS FOR EXACT LOCATIONS.
3 FURNISH AND INSTALL DRYER BOX PER MANUFACTURER'S INSTRUCTIONS.
MOUNT BOTTOM OF DRYER BOX AT NOMINAL 6" ABOVE FINISHED FLOOR FOR
STANDARD DRYERS AND COORDINATE INSTALLATION HEIGHT FOR
STACKABLE DRYERS. SEAL AROUND BOX PERIMETER. INSTALL LABEL
SHOWING EQUIVALENT LENGTH OF INSTALLED DRYER VENT (INCLUDING
NUMBER OF ELBOWS) PER MECHANICAL CODE.
4 FURNISH AND INSTALL BATHROOM EXHAUST FAN EF-1 IN WALL. USE ONLY
SMOOTH RADIUS ELBOWS (R/D = 1.5). MAINTAIN 4"ø DUCTWORK IN WALL
THROUGH ELBOW. FLAIR OUT TO 6"ø DUCT ABOVE CEILING.
5 FURNISH AND INSTALL 7 DAY PROGRAMMABLE THERMOSTAT WITH THE TOP
48" ABOVE FINISHED FLOOR.
6 FURNISH AND INSTALL TRANSFER GRILLE 6" ABOVE TOP OF DOOR.
SHEETMETAL TO BE INSTALLED THROUGH THE WALL. PAINT BLACK ANY
STUDS THAT INTERSECT.
7 PROVIDE FLEXIBLE CONNECTION TO FCU DISCHARGE BEFORE CONNECTION
TO SUPPLY DUCTWORK. FURNISH AND INSTALL FIRE DAMPER WHERE DUCT
PENETRATES RATED CEILING PARTITION.
8 PROVIDE TRAPPED 3/4" CPVC CONDENSATE DRAIN LINE AND TERMINATE
ABOVE HUB-DRAIN LOCATED IN MECHANICAL CLOSET. DO NOT BLOCK FILTER
ACCESS.
9 ROUTE REFRIGERANT LINES UP TO ABOVE CEILING AND OVER TO FURRED
OUT WALL. ROUTE UP TO ROOF, THEN TO APPROPRIATE CONDENSING UNIT
SERVING THIS APARTMENT. SEE ROOF LEVEL HVAC PLANS FOR CONDENSING
UNIT LOCATIONS AND DESIGNATIONS. REFRIGERANT LINES SIZED PER
MANUFACTURER'S RECOMMENDATIONS.
10 MOUNT RETURN GRILLE LOW ON WALL. RETURN DUCTWORK ROUTES
THROUGH THE WALL AND TURNS UP INTO THE BOTTOM OF FCU. TRANSITION
AS NECESSARY FOR FINAL CONNECTION.
1/4" = 1'-0"
Unit Type A7 Enlarged HVAC Plan1
1/4" = 1'-0"
Unit Type A8 Enlarged HVAC Plan2
1/4" = 1'-0"
Unit Type A9 Enlarged HVAC Plan3
1/4" = 1'-0"
Unit Type B2 Enlarged HVAC Plan5