Loading...
HomeMy WebLinkAboutH-306 - ENLARGED HVAC PLANSTTT FD EF-1 1 1 1 2 12 11 987 10 1 5 1 6 4 3 4 4 2 1 1 G- 24/10 FCU-3 2 SG 12/6 245 SG 12/6 190 SG 12/6 220 SG 6/6 50 SG 12/6 50 SG 12/6 120 SG 6/6 50 24/16 G975 16/125"ø 7"ø 6ø 6ø 4ø 6ø 6ø 7"ø 5"ø7"ø 7"ø 7"ø DBF-1 G- 24/10 6 EF-1 EF-1 FD FD 2 12 2 1 1 1 1 1 1 1 3 4 4 6 11 5 10 7 8 9 G 24/16 975 16/127"ø 7"ø 5"ø 7"ø 7"ø 5"ø 7"ø 6ø 4ø 6ø SG 12/6 50 SG 6/6 50 SG 12/6 225 SG 12/6 200 SG 12/6 235 SG 6/6 50 EF-1 EF-1 G - 24/10 12/6 SG165 DBF-1 G- 24/10 6 FCU-3FD 2 2 1 1 3 8 97 10 6 5 4 4 1 1 1 1 2 FCU-2 DBF-1 G- 24/10 24/12 G675 12/1214/10EF-1 EF-1 12/6 SG150 6/6 SG50 6/6 SG50 12/6 SG135 12/6 SG145 12/6 SG145 7"ø 7"ø 7"ø 7"ø 5"ø 5"ø 6ø 6ø 4ø FD G- 24/10 6 11700201 No. STATE OFJOSEPHR.BO L Y ARDPROFES S ION A L E N G INEERLICENSE EXPIRES 07/31/22 DATE SIGNED 11/24/21 R E G I S TER E D I ND I A N A 19030 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS750 Veterans Way11/24/21 BUILDING SHELL BID PHASE III H-306 ENLARGED HVAC PLANS 11/24/2111/24/21 RWEH 1/4" = 1'-0" Unit Type C2.1 Enlarged HVAC Plan3 1/4" = 1'-0" Unit Type C1.1 Enlarged HVAC Plan2 1/4" = 1'-0" Unit Type B3.1 Enlarged HVAC Plan1 SHEET PLAN NOTES 1 FURNISH AND INSTALL CEILING RADIATION DAMPER AT ALL LOCATIONS WHERE GRILLES PENETRATE A FIRE RATED CEILING. 2 TERMINATE EXHAUST DUCT WITH WALL VENT. CUSTOM COLOR TO BE SELECTED BY ARCHITECT. BASIS OF DESIGN FOR VENT CAP IS DEFLECTO MODEL HSB4W. SEE ARCHITECTURAL ELEVATIONS FOR EXACT LOCATIONS. 3 FURNISH AND INSTALL DRYER BOX PER MANUFACTURER'S INSTRUCTIONS. MOUNT BOTTOM OF DRYER BOX AT NOMINAL 6" ABOVE FINISHED FLOOR FOR STANDARD DRYERS AND COORDINATE INSTALLATION HEIGHT FOR STACKABLE DRYERS. SEAL AROUND BOX PERIMETER. INSTALL LABEL SHOWING EQUIVALENT LENGTH OF INSTALLED DRYER VENT (INCLUDING NUMBER OF ELBOWS) PER MECHANICAL CODE. 4 FURNISH AND INSTALL BATHROOM EXHAUST FAN EF-1 IN WALL. USE ONLY SMOOTH RADIUS ELBOWS (R/D = 1.5). MAINTAIN 4"ø DUCTWORK IN WALL THROUGH ELBOW. FLAIR OUT TO 6"ø DUCT ABOVE CEILING. 5 FURNISH AND INSTALL 7 DAY PROGRAMMABLE THERMOSTAT WITH THE TOP 48" ABOVE FINISHED FLOOR. 6 FURNISH AND INSTALL TRANSFER GRILLE 6" ABOVE TOP OF DOOR. SHEETMETAL TO BE INSTALLED THROUGH THE WALL. PAINT ANY STUDS THAT INTERSECT BLACK. 7 PROVIDE FLEXIBLE CONNECTION TO FCU DISCHARGE BEFORE CONNECTION TO SUPPLY DUCTWORK. FURNISH AND INSTALL FIRE DAMPER WHERE DUCT PENETRATES RATED CEILING PARTITION. 8 PROVIDE TRAPPED 3/4" CPVC CONDENSATE DRAIN LINE AND TERMINATE ABOVE HUB-DRAIN LOCATED IN MECHANICAL CLOSET. DO NOT BLOCK FILTER ACCESS. 9 ROUTE REFRIGERANT LINES UP TO ABOVE CEILING AND OVER TO FURRED OUT WALL. ROUTE UP TO ROOF, THEN TO APPROPRIATE CONDENSING UNIT SERVING THIS APARTMENT. SEE ROOF LEVEL HVAC PLANS FOR CONDENSING UNIT LOCATIONS AND DESIGNATIONS. REFRIGERANT LINES SIZED PER MANUFACTURER'S RECOMMENDATIONS. 10 MOUNT RETURN GRILLE HIGH ON WALL TIGHT TO CEILING. 11 6" OUTDOOR AIR DUCT PENETRATES THROUGH FIRE RATED CEILING. PROVIDE FIRE DAMPER AT PENETRATION. TAP INTO SIDE OF RETURN DUCTWORK WITH DAMPER. BALANCE AIRFLOW TO 60 CFM. 12 TERMINATE OUTDOOR AIR DUCT WITH WALL VENT. CUSTOM COLOR TO BE SELECTED BY ARCHITECT. BASIS OF DESIGN FOR VENT CAP IS DEFLECTO MODEL HSB4W. SEE ARCHITECTURAL ELEVATIONS FOR EXACT LOCATIONS.