Loading...
HomeMy WebLinkAboutP-100A - UNDER FLOOR PLUMBING PLAN - AREA AxK xK H.9 H.9 xJ xJ x17x17 xJ.5 xJ.5 x16.9x16.9 x18x18 x18.1x18.1 x19x19 x20x20 x21x21 x21.1x21.1 xJ.1 xJ.1 xJ.2 xJ.2 xJ.3 xJ.3 x21.4x21.4 x21.5x21.5 x21.9x21.9 x22x22 xH.5 xH.5 xH xH xG.5 xG.5 xG xG xF.9 xF.9 20.7 20.7 19.7 19.7 19.4 19.4 F.4 F.4 F.8 F.8 G.1 G.1 G.8 G.8 G.9 G.9 H.3 H.3 H.4 H.4 H.6 H.6 XJ.4 XJ.4 20.5 20.5 19.5 19.5 F.10 F.10 H.2 H.2 21.2 21.2 SG 4" SG 4" SANITARY GREASE INV. EL.= -1'-0" B.F.F. PIPE SLEEVE (TYP) SEE SITE/CIVIL DRAWINGS FOR CONTINUATION 7 4 3 2 1 UTILITY TUNNEL UTILITY TUNNEL FINISH FLOOR ELEVATION = 830.67' 8 4" W W 4" W 9 5 6 3" V 3" V 3" VENT INV. EL.= -1'-0" B.F.F. SEE SITE/CIVIL DRAWINGS FOR CONTINUATION FINISH FLOOR ELEVATION = 830.67' FINISH FLOOR ELEVATION = 834.00' 6" F 4" CW 10W 7 7 WW4" W 4" W 4" W 11 FINISH FLOOR ELEVATION = 834.00' 12 12 4" W 4" W 4" W 4" W 4" W W W 7 13 4" W 4" W 13 GENERAL PLUMBING NOTES: A. REFERENCE SHEET M-000 FOR GENERAL PLUMBING SYMBOLS, LEGENDS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES. 11700201 No. STATE OFJOSEPHR.BO L Y ARDPROFES S ION A L E N G INEERLICENSE EXPIRES 07/31/22 DATE SIGNED 11/24/21 R E G I S TER E D I ND I A N A 19030 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS750 Veterans Way11/24/21 BUILDING SHELL BID PHASE III P-100A UNDER FLOOR PLUMBING PLAN - AREA A 09/11/1909/11/19 GRJK 1/8" = 1'-0" UNDER FLOOR PLUMBING PLAN - AREA A1 N 0 16'8'4' SHEET PLAN NOTES 1 4" DOMESTIC INCOMING COLD WATER UP. 2 6" FIRE PROTECTION WATER UP. 3 CONNECT NEW 4"CW TO EXISTING 12"CW MAIN IN UTILITY TUNNEL WITH AWWA M.J. BUTTERFLY VALVE AND LG M.J. DIP SPOOL. 4 CONNECT NEW 6"F TO EXISTING 10"F MAIN IN UTILITY TUNNEL. 5 4'-0" DIA x 9'-0" TALL FIBERGLASS SANITARY BASIN WITH GAS TIGHT COVER ON 6" TALL CONCRETE PAD. 6 3"V UP IN CORNER. 7 4"W UP TO FCO FOR FUTURE USE. 8 4"SG UP IN CORNER. 9 4"W UP TO FLOOR CLEANOUT (FCO). 10 3"W WITH P-TRAP UP TO HUB DRAIN. 11 INVERT ELEVATION OF 6"W INTO PIT BASIN IS -6'-3" B.F.F. 12 4"W WITH P-TRAP UP TO FLOOR DRAIN. 13 2"V UP. 11/24/21 BUILDING SHELL BID PHASE III