HomeMy WebLinkAboutP-100A - UNDER FLOOR PLUMBING PLAN - AREA AxK
xK
H.9
H.9
xJ
xJ
x17x17
xJ.5
xJ.5
x16.9x16.9
x18x18
x18.1x18.1
x19x19
x20x20
x21x21
x21.1x21.1
xJ.1
xJ.1
xJ.2
xJ.2
xJ.3
xJ.3
x21.4x21.4
x21.5x21.5
x21.9x21.9
x22x22
xH.5
xH.5
xH
xH
xG.5
xG.5
xG
xG
xF.9
xF.9
20.7 20.7
19.7 19.7
19.4 19.4
F.4
F.4 F.8
F.8 G.1
G.1
G.8
G.8
G.9
G.9
H.3
H.3
H.4
H.4 H.6
H.6 XJ.4
XJ.4
20.5 20.5
19.5 19.5
F.10
F.10
H.2
H.2
21.2 21.2
SG
4" SG
4" SANITARY GREASE
INV. EL.= -1'-0" B.F.F.
PIPE SLEEVE (TYP)
SEE SITE/CIVIL DRAWINGS
FOR CONTINUATION
7
4
3
2
1
UTILITY TUNNEL
UTILITY TUNNEL
FINISH FLOOR
ELEVATION = 830.67'
8
4" W
W
4" W
9
5
6
3" V
3" V
3" VENT
INV. EL.= -1'-0" B.F.F.
SEE SITE/CIVIL DRAWINGS
FOR CONTINUATION
FINISH FLOOR
ELEVATION = 830.67'
FINISH FLOOR
ELEVATION = 834.00'
6" F
4" CW
10W
7
7 WW4" W
4" W
4" W
11
FINISH FLOOR
ELEVATION = 834.00'
12
12
4" W
4" W
4" W
4" W
4" W
W W
7
13
4" W
4" W
13
GENERAL PLUMBING NOTES:
A. REFERENCE SHEET M-000 FOR GENERAL PLUMBING SYMBOLS, LEGENDS,
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
11700201
No.
STATE OFJOSEPHR.BO
L
Y
ARDPROFES
S ION A L E N G INEERLICENSE EXPIRES 07/31/22
DATE SIGNED 11/24/21
R E G I S TER
E
D
I
ND I A N A
19030
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS750 Veterans Way11/24/21 BUILDING SHELL BID
PHASE III
P-100A
UNDER FLOOR
PLUMBING PLAN -
AREA A
09/11/1909/11/19
GRJK
1/8" = 1'-0"
UNDER FLOOR PLUMBING PLAN - AREA A1
N
0 16'8'4'
SHEET PLAN NOTES
1 4" DOMESTIC INCOMING COLD WATER UP.
2 6" FIRE PROTECTION WATER UP.
3 CONNECT NEW 4"CW TO EXISTING 12"CW MAIN IN UTILITY TUNNEL WITH
AWWA M.J. BUTTERFLY VALVE AND LG M.J. DIP SPOOL.
4 CONNECT NEW 6"F TO EXISTING 10"F MAIN IN UTILITY TUNNEL.
5 4'-0" DIA x 9'-0" TALL FIBERGLASS SANITARY BASIN WITH GAS TIGHT COVER
ON 6" TALL CONCRETE PAD.
6 3"V UP IN CORNER.
7 4"W UP TO FCO FOR FUTURE USE.
8 4"SG UP IN CORNER.
9 4"W UP TO FLOOR CLEANOUT (FCO).
10 3"W WITH P-TRAP UP TO HUB DRAIN.
11 INVERT ELEVATION OF 6"W INTO PIT BASIN IS -6'-3" B.F.F.
12 4"W WITH P-TRAP UP TO FLOOR DRAIN.
13 2"V UP.
11/24/21 BUILDING SHELL
BID PHASE III