Loading...
HomeMy WebLinkAboutP-102A - 2ND FLOOR PLUMBING PLAN - AREA AH.9 H.9 xJ xJ x17x17 xJ.5 xJ.5 x16.9x16.9 x18x18 x18.1x18.1 x19x19 x20x20 x21x21 x21.1x21.1 xJ.1 xJ.1 xJ.2 xJ.2 xJ.3 xJ.3 x21.4x21.4 x21.5x21.5 x21.9x21.9 x22x22 xH.5 xH.5 xH xH xG.5 xG.5 xG xG xF.9 xF.9 20.7 20.7 19.7 19.7 19.4 19.4 F.4 F.4 F.8 F.8 G.1 G.1 G.8 G.8 G.9 G.9 H.3 H.3 H.4 H.4 H.6 H.6 XJ.4 XJ.4 20.5 20.5 19.5 19.5 F.10 F.10 H.2 H.2 21.2 21.2 5 10 201 4" ST ST CO 11 1 11 5 166 7 6 7 WH-1 8 8 8 8 9 2" CW 8 8 8 9 8 8 9 8 8 12 13 12 12 12 14 12 12 12 12 13 12 12 12 13 13 12 12 14 13 13 12 12 15 1 1817 19 4" ST ST ST ST6" ST 6" ST 8" ST 8" ST CO 6" ST 6" ST ST4" ST 3" W 4" W 4" W 4" W 4" W 3" W 4" W 4" W 4" W 4" W 4" W 3" W 3" W 3" W 3" W 4" W CO W W WWW W W WWCO CO 4" W 4" W 4" W 4" W 4" W 3" W 4" W 4" W 4" W 4" W 4" W 4" W 4" W 3" W4" W WWWW WW WCOW CO 1 1/2" CW 1 1/2" CW 4" CW 4" CW 4" CW 4" CW 3" CW 4" CW 1 1/2" CW 1 1/2" CW 3" CW 3" CW 3/4" CW 1 1/2" CW 3" CW 1 1/2" CW 3" CW 1 1/2" CW 2" CW 1 1/2" CW 2" CW1 1/2" CW 1 1/2" CW 1 1/2" CW 1 1/2" CW 3/4" CW WH-1 SEE 3/ P-305 FOR ENLARGED PLAN SEE 3/ P-301 FOR ENLARGED PLAN SEE 4/ P-301 FOR ENLARGED PLAN SEE 1/ P-304 FOR ENLARGED PLAN SEE 4/ P-305 FOR ENLARGED PLAN SEE 4/ P-303 FOR ENLARGED PLAN SEE 3/ P-303 FOR ENLARGED PLAN SEE 2/ P-303 FOR ENLARGED PLAN SEE 6/ P-301 FOR ENLARGED PLAN SEE 5/ P-301 FOR ENLARGED PLAN SEE 5/ P-302 FOR ENLARGED PLAN CO 1321 3" W 2" W 22 3/4" CW 13 22 23 3" W 3/4" CW CO W 21 24 3" W CO 4" ST 9 9 9 9 3" CW 3" CW 3" CW 3" CW GENERAL PLUMBING NOTES: A. REFERENCE SHEET M-000 FOR GENERAL PLUMBING SYMBOLS, LEGENDS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES. NOTE: ALL ABOVE CEILING OR EXPOSED STORM, SANITARY WASTE, VENT AND CW PIPING OFF THE FIRST AND SECOND FLOOR AREA TO BE PROVIDED WITH ZESTON 2000 SERIES INSULATION WITH PVC JACKET AND FITTING COVERS, COLOR GRAY. 11700201 No. STATE OFJOSEPHR.BO L Y ARDPROFES S ION A L E N G INEERLICENSE EXPIRES 07/31/22 DATE SIGNED 11/24/21 R E G I S TER E D I ND I A N A 19030 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS750 Veterans Way11/24/21 BUILDING SHELL BID PHASE III P-102A 2ND FLOOR PLUMBING PLAN - AREA A 09/17/1909/17/19 GRJK 1/8" = 1'-0" 2ND FLOOR PLUMBING PLAN - AREA A1 N 0 16'8'4' SHEET PLAN NOTES 1 6"ST UP. 5 6"W DOWN. 6 4" VENT DOWN. 7 4" VENT CAP FOR FUTURE USE. 8 1 1/2"CW UP. 9 3"CW VALVE AND CAP FOR FUTURE USE. 10 4"CW FROM BELOW. 11 3/4"CW DROP. 12 4" WASTE STACK UP. 13 3" WASTE/VENT STACK UP. 14 4" VENT STACK UP. 15 4"ST UP AND DOWN. 16 8"ST DOWN. 17 4"ST UP TO ROOF DRAIN. 18 4"ST UP TO OVERFLOW DRAIN. 19 4"ST DOWN. 20 6"ST DOWN. 21 2"W WITH P-TRAP UP TO FLOOR DRAIN. 22 3/4"CW UP. 23 3"W WITH P-TRAP UP TO MOP BASIN. 24 ROUTE WASTE PIPE AROUND ELEVATOR SHAFT. 11/24/21 BUILDING SHELL BID PHASE III