Loading...
HomeMy WebLinkAboutP-102B - 2ND FLOOR PLUMBING PLAN - AREA Bx16x16 H.9 H.9 xJ xJ x17x17 xJ.5 xJ.5 x16.9x16.9 xJ.1 xJ.1 xJ.2 xJ.2 xJ.3 xJ.3 xH.5 xH.5 xH xH xG.5 xG.5 xG xG xF.9 xF.9 x15x15 x14x14 1.71.7 x13x13 x12x12 13.913.9 F.8 F.8 G.1 G.1 G.8 G.8 G.9 G.9 H.3 H.3 H.4 H.4 H.6 H.6 XJ.4 XJ.4 14.9 14.9 13.1 13.1 12.212.2 11.511.5 WW W W 3" ST 3" ST3" ST 3" ST 3" ST ST STST ST CO 3" STCO 2 2 67 4 12 9 2 3" ST 3" ST STST CO 21 9 2 CO 3" ST 3" ST ST ST4 23 14 9 9 9 9 8 14 4" V 6" ST 3 10 23 ST 7ST3" ST 3" ST 2 6 3" ST ST2 6 9 9 1 4" W 9 11 11 23 9 SEE 1/ P-301 FOR ENLARGED PLAN SEE 1/ P-303 FOR ENLARGED PLAN SEE 1/ P-305 FOR ENLARGED PLAN SEE 2/ P-305 FOR ENLARGED PLAN SEE 2/ P-301 FOR ENLARGED PLAN SEE 1/ P-302 FOR ENLARGED PLAN SEE 2/ P-302 FOR ENLARGED PLAN SEE 3/ P-302 FOR ENLARGED PLAN SEE 3/ P-304 FOR ENLARGED PLAN SEE 5/ P-305 FOR ENLARGED PLAN SEE 4/ P-302 FOR ENLARGED PLAN 3" ST 6" ST ST9 13 4" ST 6" ST 4" ST 4" ST ST STCOST5 5 11 9 13 11 11 9 13 9 14 9 9 13 9 13 9 9 14 19 14 W W W W WWCO 2" CW 2 1/2" CW 2 1/2" CW 2" CW 2" CW 2" CW 2 1/2" CW 3" CW 3" CW 15 1 1/2" CW 2" CW 3" CW 1 1/2" CW 1 1/2" CW 3" CW 3" CW 1 1/2" CW 4" CW 1 1/2" CW 4" CW 4" W 4" W 3" W 4" W 4" W 4" W 4" W 4" W 4" W 3" W 4" W 4" W 16 16 16 17 13 18 2" W 16 3" ST 3" ST 3" ST 3" ST 3" ST 3" ST ST 8 2" CW 3" CW 3" CW 8 8 8 8 20 4" V 4" V 4" W 3" W 3" V 4" V 22 22 4" W 4" V 3" V 3" WCO 22 4" W 4" V 8 22 4" W 3" W 4" W 4" V 3" W 3" V 4" W 4" V CO CO CO 22 W4" V 4" W WW W 22 8 4" W 4" V 4" V 4" W W8 22 4" W 4" W 4" W 4" V 4" V8 8 CO CO W W CO WCO 4" W 4" W 4" V 4" W 8 22 24 3" V 12 12 12 12 2 1/2" CW 3" CW GENERAL PLUMBING NOTES: A. REFERENCE SHEET M-000 FOR GENERAL PLUMBING SYMBOLS, LEGENDS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES. NOTE: ALL ABOVE CEILING OR EXPOSED STORM, SANITARY WASTE, VENT AND CW PIPING OFF THE FIRST AND SECOND FLOOR AREA TO BE PROVIDED WITH ZESTON 2000 SERIES INSULATION WITH PVC JACKET AND FITTING COVERS, COLOR GRAY. 11700201 No. STATE OFJOSEPHR.BO L Y ARDPROFES S ION A L E N G INEERLICENSE EXPIRES 07/31/22 DATE SIGNED 11/24/21 R E G I S TER E D I ND I A N A 19030 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS750 Veterans Way11/24/21 BUILDING SHELL BID PHASE III P-102B 2ND FLOOR PLUMBING PLAN - AREA B 09/17/1909/17/19 GRJK 1/8" = 1'-0" 2ND FLOOR PLUMBING PLAN - AREA B1016'8'4' N SHEET PLAN NOTES 1 6"ST UP. 2 3"ST UP TO DECK DRAIN (DD-1). 3 6"ST DOWN. 4 6"ST UP AND DOWN. 5 4"ST UP. 6 4"V FROM BELOW. 4"V RISE. 7 4"V CAPPED FOR FUTURE USE. 8 4" VENT STACK UP. 9 4" WASTE STACK UP. 10 6"W DOWN. 11 1 1/2"CW RISER UP. 12 2 1/2"CW VALVE AND CAP FOR FUTURE USE. 13 3" WASTE/VENT STACK UP. 14 2"CW RISER UP. 15 3"CW DOWN. 16 3"ST UP. 17 3/4"CW UP. 18 2"W WITH P-TRAP UP TO FLOOR DRAIN. 19 2"CW RISER UP. 20 4"W CAPPED FOR FUTURE USE. 21 6"W DOWN, 4"V RISE. 22 4"W DOWN. 23 3"CW VALVE AND CAP FOR FUTURE USE. 24 3" WASTE/VENT STACK DOWN. 11/24/21 BUILDING SHELL BID PHASE III