Loading...
HomeMy WebLinkAboutP-104B - 4TH FLOOR PLUMBING PLAN - AREA Bx16x16 H.9 H.9 xJ xJ x17x17 xJ.5 xJ.5 x16.9x16.9 xJ.1 xJ.1 xJ.2 xJ.2 xJ.3 xJ.3 xH.5 xH.5 xH xH xG.5 xG.5 xG xG xF.9 xF.9 x15x15 x14x14 1.71.7 x13x13 x12x12 13.913.9 F.8 F.8 G.1 G.1 G.8 G.8 G.9 G.9 H.3 H.3 H.4 H.4 H.6 H.6 XJ.4 XJ.4 14.9 14.9 13.1 13.1 12.212.2 11.511.5 4 3 4 3 4 4 7 4 4 4 4 1 4 8 8 4 4 1 CO 22 3" ST SEE 1/ P-301 FOR ENLARGED PLAN SEE 1/ P-303 FOR ENLARGED PLAN SEE 1/ P-305 FOR ENLARGED PLAN SEE 2/ P-305 FOR ENLARGED PLAN SEE 2/ P-301 FOR ENLARGED PLAN SEE 1/ P-302 FOR ENLARGED PLAN SEE 2/ P-302 FOR ENLARGED PLAN SEE 3/ P-302 FOR ENLARGED PLAN SEE 3/ P-304 FOR ENLARGED PLAN SEE 5/ P-305 FOR ENLARGED PLAN SEE 4/ P-302 FOR ENLARGED PLAN 3" ST ST ST8 4 4 4 8 4 5 5 4 3 5 6 5 3 4 1 5 6 4 12 4 9 9 9 10 HB-1 2"FD-1 2" W 5 11 ST 3" ST 3" ST CO 9 GENERAL PLUMBING NOTES: A. REFERENCE SHEET M-000 FOR GENERAL PLUMBING SYMBOLS, LEGENDS, ABBREVIATIONS AND ADDITIONAL GENERAL NOTES. 11700201 No. STATE OFJOSEPHR.BO L Y ARDPROFES S ION A L E N G INEERLICENSE EXPIRES 07/31/22 DATE SIGNED 11/24/21 R E G I S TER E D I ND I A N A 19030 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS750 Veterans Way11/24/21 BUILDING SHELL BID PHASE III P-104B 4TH FLOOR PLUMBING PLAN - AREA B 09/17/1909/17/19 GRJK 1/8" = 1'-0" 4TH FLOOR PLUMBING PLAN - AREA B1016'8'4' N SHEET PLAN NOTES 1 6"ST UP AND DOWN. 2 3"ST FROM ABOVE. 3 1 1/4"CW RISER UP AND 1 1/2"CW RISER DOWN. 4 4" WASTE AND 4" VENT STACK. 5 3" WASTE/VENT STACK. 6 4"ST UP AND DOWN. 7 2"CW RISER UP AND 2"CW RISER DOWN. 8 1 1/2"CW RISER UP AND 2"CW RISER DOWN. 9 3"ST UP AND DOWN. 10 3/4"CW UP AND DOWN. 11 2"W WITH P-TRAP UP TO FLOOR DRAIN. 12 1 1/2"CW RISER UP AND 1 1/2"CW RISER DOWN. 11/24/21 BUILDING SHELL BID PHASE III