HomeMy WebLinkAboutP-105B - 5TH FLOOR PLUMBING PLAN - AREA Bx16x16
H.9
H.9
xJ
xJ
x17x17
xJ.5
xJ.5
x16.9x16.9
xJ.1
xJ.1
xJ.2
xJ.2
xJ.3
xJ.3
xH.5
xH.5
xH
xH
xG.5
xG.5
xG
xG
xF.9
xF.9
x15x15
x14x14
1.71.7
x13x13
x12x12
13.913.9
F.8
F.8 G.1
G.1
G.8
G.8
G.9
G.9
H.3
H.3
H.4
H.4 H.6
H.6 XJ.4
XJ.4
14.9 14.9
13.1 13.1
12.212.2
11.511.5
5
56
21
5
7 6
8
5
3
2
1
2
1
10
15
10
10
10
10
18
4
10
18
10
4
11
11
SEE 1/ P-301 FOR
ENLARGED PLAN
SEE 1/ P-303 FOR
ENLARGED PLAN
SEE 1/ P-305 FOR
ENLARGED PLAN
SEE 2/ P-305 FOR
ENLARGED PLAN
SEE 2/ P-301 FOR
ENLARGED PLAN
SEE 1/ P-302 FOR
ENLARGED PLAN
SEE 2/ P-302 FOR
ENLARGED PLAN
SEE 3/ P-302 FOR
ENLARGED PLAN
SEE 3/ P-304 FOR
ENLARGED PLAN
SEE 5/ P-305 FOR
ENLARGED PLAN
SEE 4/ P-302 FOR
ENLARGED PLAN
12
13
CO
4" ST
6
5
3/4" CW
6" ST
CO
5
13
6
13
5
12
4" ST
6
10
18
10
14
10
14
10
10
9
9
11
11
11
11
HB-1
16
2"FD-1
14
17
2" W
GENERAL PLUMBING NOTES:
A. REFERENCE SHEET M-000 FOR GENERAL PLUMBING SYMBOLS, LEGENDS,
ABBREVIATIONS AND ADDITIONAL GENERAL NOTES.
11700201
No.
STATE OFJOSEPHR.BO
L
Y
ARDPROFES
S ION A L E N G INEERLICENSE EXPIRES 07/31/22
DATE SIGNED 11/24/21
R E G I S TER
E
D
I
ND I A N A
19030
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWREN BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS750 Veterans Way11/24/21 BUILDING SHELL BID
PHASE III
P-105B
5TH FLOOR PLUMBING
PLAN - AREA B
09/17/1909/17/19
GRJK
1/8" = 1'-0"
5TH FLOOR PLUMBING PLAN - AREA B1016'8'4'
N
SHEET PLAN NOTES
1 4"ST UP TO ROOF DRAIN.
2 4"ST UP TO OVERFLOW DRAIN.
3 6"ST DOWN.
4 6"ST UP AND DOWN.
5 4" WASTE AND 4" VENT STACK. 4"V UP. 4" VTR.
6 1 1/4"CW RISER FROM BELOW.
7 3/4"CW RISE.
8 3/4"CW UP TO ROOF HYDRANT (RH-1).
9 1 1/4"CW RISER UP AND 1 1/2"CW RISER DOWN.
10 4" WASTE AND 4" VENT STACK.
11 3"ST UP AND DOWN.
12 4"ST DOWN.
13 3" WASTE/VENT STACK, 4"VTR.
14 3" WASTE/VENT STACK.
15 2"CW RISER UP AND 2"CW RISER DOWN.
16 3/4"CW UP AND DOWN.
17 2"W WITH P-TRAP UP TO FLOOR DRAIN.
18 1 1/2"CW RISER UP AND 1 1/2"CW RISER DOWN.
11/24/21 BUILDING SHELL
BID PHASE III