Loading...
HomeMy WebLinkAboutA301-OVERALL-BUILDING-ELEVATIONS-Rev.0T/O Sanctuary Level EL: 8' -4 1/4" T/O Ground Level EL: 0" Addition T/O Wall EL: 16' -0" 1 2 5 5 1 3 4 3 1 W1 W1 W1 W1 W2 W3 100-2 15 W7 5 5 9 4 A404 2 A404 14 113 TYP TYP EXISTING BUILDING T/O Entry EL: ±26' -0" 13 7 A405 5 A401 3 A402 T/O Sanctuary Level EL: 8' -4 1/4" T/O Ground Level EL: 0" Addition T/O Wall EL: 16' -0" 2 5 5 6 108-2 1 1 9 T/O Entry EL: ±26' -0" 14 7 NEW CONSTRUCTIONEXISTING BUILDING 13 3 A406 108A 1 1 A403 NORTH EXISTING ADDITION MECH YARD 2 A301 1 A301 2 A302 1 A302 3 A301 4 A302 5 A 30 2 3 A302 ELEVATION KEYPLAN 4 A301 5 A3 0 1 PLAN NORTH T/O Ground Level EL: 0" Addition T/O Wall EL: 16' -0" 108-2 W6W6 W6 5 6 1 9 NEW CONSTRUCTION 3 TYP 11 TYP 14 2 A403 T/O Sanctuary Level EL: 8' -4 1/4" T/O Ground Level EL: 0" 13 7 T/O Sanctuary Level EL: 8' -4 1/4" T/O Ground Level EL: 0" 4 A402 13 7 DRAWING TITLE: CERTIFIED BY: DRAWING NUMBER PROJECT NUMBER REVISIONS: SCOPE DRAWINGS:PROJECT: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for theproper execution and completion of the work. ISSUE DATE DRAWN BY CHECKED BY © 2018 CSO Architects, Inc. All Rights ReservedPARISH LIFE CENTER PROJECTOUR LADY OF MT. CARMEL14598 OAK RIDGE RD, CARMEL, IN 4603209/17/21 NTC CAM 19038 A301 OVERALL BUILDING ELEVATIONSCATHOLIC CHURCHSCALE: 1/8" = 1'-0"A301 2 NORTH BUILDING ELEVATION SCALE: 1/8" = 1'-0"A301 1 EAST BUILDING ELEVATION ELEVATION NOTES 1 NEW BRICK VENEER - MATCH EXISTING. 2 NEW ALUMINUM CURTAIN WALL ASSEMBLY. 3 NEW ALUMINUM STOREFRONT WINDOW ASSEMBLY. 4 FORMED METAL WALL PANEL ASSEMBLY. 5 ALUMINUM FASCIA - MATCH EXISTING. 6 ALUMINUM STOREFRONT ENTRANCE FRAME AND DOOR. 7 NEW LOUVER - SEE MECHANICAL. 8 BRICK SOLDIER COURSE. 9 NEW STONE CAP - MATCH EXISTING. 10 NEW FOUNTAIN - BY OTHERS 11 LIMESTONE SILL. 12 NEW ALUMINUM STOREFRONT ENTRANCE SYSTEM. 13 INFILL FORMER LOUVER OPENING WITH BRICK TO MATCH EXISTING. 14 SCREEN WALL AROUND MECHANICAL UNIT - FACE BRICK WITH CUT STONE CAP 15 NEW ALUMINUM STOREFRONT CLERESTORY WINDOWS. SCALE: 1/8" = 1'-0" A301 3 PARTIAL EAST BUILDING ELEVATION SCALE: 1/8" = 1'-0"A301 4 PARTIAL SOUTH BUILDING ELEVATION SCALE: 1/8" = 1'-0" A301 5 PARTIAL SOUTHEAST BUILDING ELEVATION EXISTING BUILDING 1 OWNER COMMENTS 09-23-21 1 12/13/21