Loading...
HomeMy WebLinkAboutA302-OVERALL-BUILDING-ELEVATIONS-Rev.0T/O Sanctuary Level EL: 8' -4 1/4" T/O Ground Level EL: 0" Addition T/O Wall EL: 16' -0" 6 130-4 2 3 3 3 3 W5W5 W5 W5 W7 W8 W7 6 5 5 5 1 1 3 A404 DS DS DS DS DS DS DS DS DS DS DS DS DS 129-1 15 EXISTING BUILDING T/O Entry EL: ±26' -0"4 15 3 A406 2 A406 6 A405 5 A403 6 A403 10 T/O Sanctuary Level EL: 8' -4 1/4" T/O Ground Level EL: 0" Addition T/O Wall EL: 16' -0" W10 W10 W4 W9 W7 3 3 5 W11 W11 W11 W11 W11 DS DS DS DS 11 11 7 2 A404 EXISTING BUILDING 154 T/O Entry EL: ±26' -0" 1 A401 NORTH EXISTING ADDITION MECH YARD 2 A301 1 A301 2 A302 1 A302 3 A301 4 A302 5 A302 3 A302 ELEVATION KEYPLAN 4 A301 5 A30 1 PLAN NORTH T/O Lower Level -4' -1 3/4" A.F.F. T/O Sanctuary Level EL: 8' -4 1/4" T/O Ground Level EL: 0" W9 5 1 11 11 W11 W11 W11 W11 1 A401 022 T/O Sanctuary Level EL: 8' -4 1/4"133 1 2 A405 5 12 T/O Ground Level EL: 0" Addition T/O Wall EL: 16' -0" 130-3 1 5 12 DRAWING TITLE: CERTIFIED BY: DRAWING NUMBER PROJECT NUMBER REVISIONS: SCOPE DRAWINGS:PROJECT: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for theproper execution and completion of the work. ISSUE DATE DRAWN BY CHECKED BY © 2018 CSO Architects, Inc. All Rights ReservedPARISH LIFE CENTER PROJECTOUR LADY OF MT. CARMEL14598 OAK RIDGE RD, CARMEL, IN 4603209/17/21 NTC CAM 19038 A302 OVERALL BUILDING ELEVATIONSCATHOLIC CHURCHSCALE: 1/8" = 1'-0"A302 2 WEST BUILDING ELEVATION SCALE: 1/8" = 1'-0" A302 1 SOUTH BUILDING ELEVATION ELEVATION NOTES 1 NEW BRICK VENEER - MATCH EXISTING. 2 NEW ALUMINUM CURTAIN WALL ASSEMBLY. 3 NEW ALUMINUM STOREFRONT WINDOW ASSEMBLY. 4 FORMED METAL WALL PANEL ASSEMBLY. 5 ALUMINUM FASCIA - MATCH EXISTING. 6 ALUMINUM STOREFRONT ENTRANCE FRAME AND DOOR. 7 NEW LOUVER - SEE MECHANICAL. 8 BRICK SOLDIER COURSE. 9 NEW STONE CAP - MATCH EXISTING. 10 NEW FOUNTAIN - BY OTHERS 11 LIMESTONE SILL. 12 NEW ALUMINUM STOREFRONT ENTRANCE SYSTEM. 13 INFILL FORMER LOUVER OPENING WITH BRICK TO MATCH EXISTING. 14 SCREEN WALL AROUND MECHANICAL UNIT - FACE BRICK WITH CUT STONE CAP 15 NEW ALUMINUM STOREFRONT CLERESTORY WINDOWS. SCALE: 1/8" = 1'-0"A302 4 PARTIAL SOUTH BUILDING ELEVATION SCALE: 1/8" = 1'-0"A302 5 PARTIAL SOUTHWEST BUILDING ELEVATION SCALE: 1/8" = 1'-0" A302 3 PARTIAL EAST BUILDING ELEVATION 1 OWNER COMMENTS 09-23-21 1 1 12/13/21