Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A405-WALL-SECTIONS-Rev.0
T/O Lower Level -4' -1 3/4" A.F.F. T/O Sanctuary Level EL: 8' -4 1/4" 103 BRICK VENEER. NEW METAL SOFFIT TO MATCH EXISTING. R-15 MIN. CONTINUOUS RIGID INSULATION. 6" COLD-FORMED METAL STUDS AT 16" O.C. 5/8" GYPSUM BOARD. EXISTING ROOFING SYSTEM. EXISTING METAL STUD AND GYPSUM BOARD BULKHEAD. EXISTING METAL STUD AND WOOD PLANK CEILING. EXISTING 10" HOLLOW CORE CONCRETE PLANKS WITH 3" CONCRETE TOPPING SLAB. BRICK WALL TIES AT 16" O.C. VERTICAL, MAX. MORTAR NET. THRU-WALL FLASHING WITH STAINLESS STEEL DRIP EDGE SET IN FULL BED OF SEALANT. CAVITY WEEPS AT 16" O.C. MAX. EXISTING CONCRETE FLOOR SLAB. EXISTING CONCRETE FOOTING. HALL OF AMERICAN SAINTS 133 FLUID-APPLIED AIR AND VAPOR BARRIER. HIGH PSI 3" RIGID POLYSTYRENE INSULATION. NEW CAST-IN-PLACE CONCRETE WALL - SEE STRUCTURAL. 5/8" GLASS MAT SURFACE EXTERIOR GRADE GYPSUM SHEATHING T/O Lower Level -4' -1 3/4" A.F.F. T/O Sanctuary Level EL: 8' -4 1/4" 102 103 SUSPENDED ACOUSTICAL CEILING SYSTEM. 5/8" GYPSUM BOARD. NEW 4" CONCRETE SLAB OVER VAPOR BARRIER ON DRAINAGE FILL. NEW MEMBRANE ROOFING SYSTEM OVER R-20 MIN. TAPERED INSULATION. NEW 3-HOUR WALL ASSEMBLY AT ROOF OVERBUILD (UL 415, SYSTEM G). 2" EXPANSION JOINT. NEW MEMBRANE ROOFING SYSTEM OVER R-20 MIN. INSULATION OVER SLOPING STRUCTURE. EXISTING CONCRETE FOUNDATION WALL. EXISTING BRICK WALL. EXISTING CONCRETE FLOOR SLAB. EXISTING ROOFING SYSTEM - REMOVE FASCIA ASSEMBLY AS REQUIRED. NEW WOOD VENEER PLANK CEILING. STEEL BEAM - SEE STRUCTURAL. EXISTING SANCTUARY PLATFORM. EDGE OF NEW ARCHED OPENING BEYOND. TREATED WOOD BLOCKING. TREATED WOOD BLOCKING. EXISTING CONCRETE FOOTING. EXISTING CONCRETE FLOOR SLAB. STEEL CHANNEL STRUCTURE - SEE STRUCTURAL. 3 5/8" METAL STUDS AT 16" O.C. NAVE 158 HOLY FAMILY ROOM 008 ROCKFON 3" X 3" STEEL MESH WITH SUSPENSION SYSTEM - SEE A204 FOR EXTENT. 1' - 8 3/4" 2' - 0"1' - 6"3 5/8" METAL STUDS AT 16" O.C. 2 1/2" METAL STUDS AT 16" O.C. REMOVE PORTION OF EXISTING CONCRETE WALL TO MATCH EXISTING ARCHED OPENINGS AT NORTHWEST WALL. 6" METAL STUDS AT 16" O.C. - SUPPORT FROM EXISTING CONSTRUCTION. 5/8" GYPSUM BOARD. LOWER LEVEL COMMONS 004 4 3/8" 3/4" TREATED PLYWOOD. ALIGN WITH FACE OF BRICK BELOW. B/O DECK EL: 25' -0" 1 1/2" METAL ROOF DECK - SEE STRUCTURAL. LINE OF STAINED GLASS WINDOWS BEYOND. B/O BULKHEAD EL: 17' -8 1/4" ALIGN FINISH FACE OF GYPSUM BOARD WITH FACE OF BRICK. PROVIDE 'J' MOLD TRIM AT TRANSITION BETWEEN BRICK AND GYPSUM BOARD. AT NORTHWEST SIMILAR WALL, REMOVE EXISTING EIFS INCLUDING INSULATION, FRAMING, ETC. AT ENTIRE WALL AND FURR OUT EXISTING ARCHED OPENINGS AND EXPOSED WALL SIMILAR TO THIS DETAIL. NORTHWEST AND NORTHEAST WALLS TO BE SIMILAR IN APPEARANCE/SYMMETRICAL. T/O OPENING HIGH POINT EL: 7' -4 1/2" A.F.F. 1/4" / 12" 2" CEILING EXPANSION JOINT. 3 5/8" COLD-FORMED METAL STUD OVERBUILD FRAMING AT 16" O.C. SEE 7/A405 FOR SHINGLED ROOF TO MEMBRANE ROOF TRANSITION. T/O Sanctuary Level EL: 8' -4 1/4" e.22 PRE-MANUFACTURED, PRE-FINISHED ROOF ACCESS HATCH AND GUARDRAIL SYSTEM - SEE SPECIFICATIONS. TREATED WOOD BLOCKING. EXISTING WOOD DECKING. SUSPENDED ACOUSTICAL CEILING SYSTEM. 3 5/8" METAL STUDS AT 16" O.C. WITH 5/8" GYPSUM BOARD EACH SIDE. EXISTING 10" HOLLOW CORE CONCRETE PLANKS WITH 3" CONCRETE TOPPING SLAB. EXISTING ROOFING SYSTEM. PRE-MANUFACTURED LADDER - FIELD VERIFY HEIGHT REQUIRED - SEE SPECIFICATIONS. EXISTING GYPSUM BOARD AND METAL STUD WALL. CHAIRS 150 SEE STRUCTURAL FOR ADDITIONAL FRAMING REQUIRED FOR HATCH OPENING AT EXISTING ROOF CONSTRUCTION 3' - 4 1/2" FLASH NEW ROOF ACCESS HATCH CURB INTO EXISTING ROOFING SYSTEM PER ROOFING MANUFACTURER'S WRITTEN INSTRUCTIONS TYPICAL. FIELD VERIFY ALL EXISTING CONDITIONS. 102.5 EXISTING GLULAM BEAM. STEEL BEAM - SEE STRUCTURAL. 2" EXPANSION JOINT. NEW MEMBRANE ROOFING SYSTEM OVER R-20 MIN. TAPERED INSULATION. EXISTING ROOFING SYSTEM. TREATED 2X4 WOOD BLOCKING. 1 1/2" METAL ROOF DECK - SEE STRUCTURAL. NEW MEMBRANE ROOFING SYSTEM OVER R-20 MIN. INSULATION. ICE AND WATER SHIELD. METAL STUD ROOF OVERBUILD. EXISTING ROOFING SYSTEM.HEIGHT VARIES3/4" TREATED PLYWOOD SHEATHING AS REQUIRED. REMOVE SHINGLES AS REQUIRED TO INSTALL NEW MEMBRANE ROOFING SYSTEM. EXTEND ROOF MEMBRANE UNDER THE FIRST 3 SHINGLE COURSES. HOT AIR WELD 1 1/2" MIN. EXISTING ROOF STRUCTURE. NEW 1 1/2" METAL ROOF DECK. NEW MEMBRANE ROOFING SYSTEM OVER R-20 MIN INSULATION. FASTENER AND SEAM FASTENING PLATE, MAX. 12" O.C. CUT EDGE SEALANT.MIN.MIN. DIMENSION PER MANUFACTURER'S WRITTEN INSTRUCTIONS. 1/4" / 12" Addition T/O Wall EL: 16' -0" J NEW MEMBRANE ROOFING SYSTEM OVER R-20 MIN. INSULATION OVER SLOPING STRUCTURE. NEW MEMBRANE ROOFING SYSTEM OVER R-20 MIN. INSULATION OVER SLOPING STRUCTURE. STEEL BEAM - SEE STRUCTURAL. 6" METAL STUDS AT 16" O.C. 5/8" GLASS MAT SURFACE EXTERIOR GRADE GYPSUM SHEATHING. METAL PANEL SYSTEM. 1 1/2" METAL ROOF DECK - SEE STRUCTURAL. R-15 MIN. CONTINUOUS RIGID INSULATION. FLUID-APPLIED AIR AND VAPOR BARRIER. THRU-WALL COUNTER FLASHING. METAL PANEL BASE FLASHING - ALIGN WITH SILL AT CLERESTORY WINDOW OPENINGS 3" COMPOSITE "Z" GIRTS. 3/4" EXTERIOR PLYWOOD SHEATHING PANEL SUPPORT CLIP. VENTED SOFFIT TO MATCH EXISTING. 2X6 TREATED WOOD BLOCKING. PREFINISHED METAL FASCIA - WITH RIBS/BATTENS AT 8" O.C. TO MATCH EXISTING - NO EXPOSED FASTENERS. 3 5/8" METAL STUD FRAMING AS REQUIRED.OF FIRST PANEL1' - 2" BOTTOMDRAWING TITLE: CERTIFIED BY: DRAWING NUMBER PROJECT NUMBER REVISIONS: SCOPE DRAWINGS:PROJECT: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for theproper execution and completion of the work. ISSUE DATE DRAWN BY CHECKED BY © 2018 CSO Architects, Inc. All Rights ReservedPARISH LIFE CENTER PROJECTOUR LADY OF MT. CARMEL14598 OAK RIDGE RD, CARMEL, IN 4603209/17/21 NTC CAM 19038 A405 WALL SECTIONSCATHOLIC CHURCHSCALE: 3/4" = 1'-0"A405 2 WALL SECTION SCALE: 3/4" = 1'-0" A405 1 WALL SECTION SCALE: 3/4" = 1'-0"A405 4 WALL SECTION SCALE: 3/4" = 1'-0" A405 5 DETAIL SECTION SCALE: 3/4" = 1'-0"A405 6 DETAIL SECTION SCALE: 3/4" = 1'-0"A405 7 DETAIL SECTION SCALE: 3/4" = 1'-0"A405 3 WALL SECTION 1 OWNER COMMENTS 09-23-21 1 1 1 12/13/21