Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
A501-DOOR-AND-FRAME-SCHEDULE-Rev.0
SEE SCHEDULE SCHEDULE SEE SCHEDULE SEE SEE SCHEDULED1 D2 D3 D4 MAX PER ADA3' - 7"8" 8"8" SCHEDULE SEE SEE SCHEDULE10" 2' - 3" 9 1/2" 5 1/2" 5 1/2" 5 1/2"10" 2' - 2 1/8" 8 1/4" 6"SCHEDULE SEE 6" 6"SEE SCHEDULE3' - 5 1/4" 3/4" 3' - 6"SEE SCHEDULESCHEDULE SEE D5 D6 SEE SCHEDULEMAX PER ADA3' - 7" 8"DUTCH DOOR WITH SHELF 6"3" SCHEDULE SEE D7 ALUMINUM STOREFRONT WOOD DOOR NOT USED 2" SCHEDULE SEE 2"2" U.N.O.SEE SCHEDULE 2" SEE SCHEDULE 2" 2" U.N.O.SEE SCHEDULE REMOVABLE MULLION WHERE INDICATED SEE SCHED. F1 F2 SEE SCHEDULE 2"2" 1' - 0" 2" SCHEDULE SEE 2" F3 F4 SEE SCHEDULE 2" 2" 1' - 10" 2" SCHEDULE SEE 2" F5 F6 F7 F8 F12 F13 F14 F9 F11 F10 F16 F15 4" 2' - 6" 2" 4' - 0" 2" 2' - 0" 2" 2" 8" 2" 6' - 0" 2" 8" 2"9' - 4"8' - 0"11' - 4"7' - 0" 2" 4' - 0" 2"2" 6' - 0" 2"11 1/2"2" 6' - 0" 2" 13' - 7 1/2"4" 2' - 6" 2" 4' - 0" 2"11' - 4"4" 2' - 6" 2" 4' - 0" 2" 4' - 0" 2"2" 10" 2" 6' - 0" 2" 10" 2" 8' - 4"7' - 0" 2" 4' - 0" 2"11' - 4"2"6' - 0" 2" 7 3/4"2"6' - 0"2" 13' - 3 3/4"4" 2' - 6" 2" 4' - 0" 2" 6"6' - 0" 2" 2' - 1" 2" 6' - 0"6" 1' - 7" 6" 7' - 0" 2" 4' - 0" 2" 5' - 8" 2" 2' - 4" 2" 3' - 0" 2"22' - 10"17' - 6" SPANDREL 16' - 8" 6" 10' - 6" 2" 5' - 4" 2"4" 2' - 6" 2" 4' - 0" 2" SPANDREL 4" 2' - 0" 2" 4' - 6" 2"7' - 2"2" 5' - 5" 2" 5' - 5" 2" 5' - 4" 2" 3' - 0" 2" 20' - 0"2"4' - 0" 2" 4' - 0" 2"2' - 6" 4" 11' - 4"2" 1' - 9" 2" 3' - 0" 2" 9" 4 1/2" 6' - 4 1/2" 4 1/2" 2' - 7 1/2" 4 1/2" 3' - 4 1/2" 4 1/2" 4' - 5 1/2" 2" 5' - 0" 4 1/2" 9" 2" 3' - 0" 2" 1' - 9" 2" 6' - 4 1/2" 4 1/2" 2' - 7 1/2" 4 1/2" 3' - 4 1/2" 4" 2' - 6" 2" 4' - 0" 2" 4' - 0" 2"2" 4' - 5 1/2" 4 1/2" 11' - 4"5' - 0" 2"1' - 4"2"7' - 0" 2"1' - 10" 2" 3' - 0" 2" 5' - 4"8' - 8"4" 2' - 6" 2" 4' - 0" 2"4" 2' - 6" 2" 4' - 0" 2" 4' - 0" 2"11' - 4"2" 8' - 9" 2"4' - 6" 2" 13' - 9" 18' - 6" 2" 5' - 11" 2" 6' - 0" 2" 5' - 11" 2" 2" 8' - 9" 2" 4' - 6" 2" 13' - 9" 2" 6' - 8" 2" 6' - 0" 2" 6' - 8" 2"4" 2' - 0" 2" 4' - 6" 2" 4' - 0" 2"11' - 4"6" 10' - 6" 2" 5' - 4" 2" 16' - 8"17' - 0" 2" 2' - 4" 2" 1' - 9 1/2" SPANDREL GLASS SCHEDULE A. 1" THICK INSULATING LOW-E, 1/4" TEMPERED OUTSIDE, 1/2" AIRSPACE, 1/4" TEMPERED INSIDE. B. 1/4" CLEAR TEMPERED GLASS. C. 1/4" LAMINATED CLEAR GLASS. D. REUSED STAINED GLASS WINDOW. E. FIRE-RATED CERAMIC GLASS. F. 1" THICK INSULATING LOW-E SPANDREL GLASS, 1/4" TEMPERED OUTSIDE, 1/2" AIRSPACE, 1/4" TEMPERED INSIDE. LOCATION OF OPACIFIER TO BE AS RECOMMENDED BY GLAZING MANUFACTURER. G. INSULATING ACOUSTICAL GLASS. H. 5/8" LAMINATED GLASS (TO ACHIEVE STC 46 DOOR RATING) ABBREVIATIONS LEGEND AL = ALUMINUM AN = ANODIZED BL = BORROWED LITE ETR = EXISTING TO REMAIN GHM = GALVANNEALED HOLLOW METAL GL = GLASS HM = HOLLOW METAL PT = PAINT ST = STAIN SS = STAINLESS STEEL STL = STEEL WD = WOOD 90M = 90 MINUTE ASSEMBLY RATING * = SEE REMARKS COLUMN FOR NOTES GENERAL DOOR NOTES A. THESE GENERAL NOTES APPLY TO THE DOOR SCHEDULE. B. DOOR AND FRAME NUMBERS CORRESPOND TO RESPECTIVE ROOM NUMBER. IN ROOMS WITH MULTIPLE OPENINGS, A NUMERICAL SUFFIX HAS BEEN ADDED TO DOOR NUMBERS. C. VERTICAL FRAMING MEMBERS AT ALL DOOR FRAMES SHALL EXTEND TO STRUCTURE ABOVE. D. UNDERCUT ALL DOORS AS REQUIRED BY FINAL FINISH. E. PROVIDE CONTINUOUS SEALANT BETWEEN HOLLOW METAL FRAME PERIMETERS AND SURROUNDING WALL CONSTRUCTION. F. PROVIDE CONTINUOUS SEALANT BETWEEN INTERIOR AND EXTERIOR WINDOW, CURTAIN WALL AND STOREFRONT FRAME PERIMETERS AND SURROUNDING CONSTRUCTION UNLESS NOTED OTHERWISE. G. GROUT FULL HOLLOW METAL FRAMES IN MASONRY CONSTRUCTION. H. SPOT GROUT HOLLOW METAL FRAMES IN GYPSUM WALLS. I. WHERE A FIRE RATING IS INDICATED ON THE DOOR SCHEDULE, HARDWARE AND DOOR ASSEMBLY COMPONENTS SHALL MEET THE REQUIREMENTS OF THAT LABEL. J. WHERE AN STC RATING IS INDICATED ON THE DOOR SCHEDULE, HARDWARE AND DOOR ASSEMBLY COMPONENTS SHALL MEET THE REQUIREMENTS OF THAT LABEL. K. INSTALL DOOR GLASS USING WET GLAZING METHOD. L. ALL LINTELS ABOVE EXTERIOR OPENINGS SHALL BE GALVANIZED. M. REFER TO SHEET A502 FOR ADDITIONAL DOOR, FRAME AND BORROWED LITE ELEVATIONS. N. COORDINATE THROAT OPENINGS WITH WALL WIDTH FOR ALL WRAP AROUND FRAMES. O. SCHEDULED HARDWARE FOR ALUMINUM DOORS SHALL BE PROVIDED BY HARDWARE SUPPLIER AND INSTALLED BY ALUMINUM SUPPLIER. ALUMINUM DOORS TO BE PREPARED BY ALUMINUM DOOR SUPPLIER IN ACCORDANCE WITH THE SCHEDULED HARDWARE. P. ALL NEW HOLLOW METAL DOORS, FRAMES AND BORROWED LITE FRAMES TO BE PAINTED AS INDICATED ON THE A800 SERIES FINISH PLANS. SEE FINISH PLANS FOR WOOD DOOR FINISHES. Q. PROVIDE SILENCERS ON ALL DOOR FRAMES. R. SEE STRUCTURAL DRAWINGS FOR REQUIREMENTS FOR MASONRY AND STEEL LINTELS. PROVIDE STRUCTURAL STEEL LINTELS AT OPENINGS WHERE INDICATED ON THE STRUCTURAL STEEL DRAWINGS IN LIEU OF MASONRY LINTEL AS SHOWN IN THESE DETAILS. S. VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS IN THE FIELD PRIOR TO FABRICATION OF DOORS AND FRAMES. BRING DISCREPANCIES TO THE ATTENTION OF THE ARCHITECT. T. SEE SPECIFICATION SECTION 08 71 00 FOR DOOR HARDWARE INDEX, SETS AND SPECIFICATIONS DOOR NOTES 1. PROVIDE PANIC HARDWARE. 2. NEW DOOR LEAF (LEAVES) IN EXISTING FRAME (VERIFY SIZE). 3. NOT USED. 4. CARD READER (AND PANIC BAR WHERE INDICATED) WITH EL-OPTION, EPT, AND POWER SUPPLY - SEE HARDWARE SETS - CONFIRM LOCATIONS WITH PARISH. 5. EXTERIOR DOOR AT CHILLER ENCLOSURE. 6. VERIFY EXISTING WALL CONSTRUCTION PRIOR TO FRAME FABRICATION. 7. PROVIDE 4" HEAD AT FRAME. 8. PROVIDE CLOSE SPACED SPRINKLERS IN LIEU OF FIRE RATED DOOR/FRAME ASSEMBLY - SEE DETAILS AND WALL SECTIONS, LIFE SAFETY AND PLUMBING DRAWINGS. 9. PROVIDE SOUND GASKETING, DROP SEAL AS REQUIRED TO ACHIEVE A 46 STC DOOR ASSEMBLY. FILL FRAME WITH MINERAL FIBER BATT INSULATION.7' - 0" 2"7' - 2"2" 6' - 0" 2" 6' - 4" DRAWING TITLE: CERTIFIED BY: DRAWING NUMBER PROJECT NUMBER REVISIONS: SCOPE DRAWINGS:PROJECT: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for theproper execution and completion of the work. ISSUE DATE DRAWN BY CHECKED BY © 2018 CSO Architects, Inc. All Rights ReservedPARISH LIFE CENTER PROJECTOUR LADY OF MT. CARMEL14598 OAK RIDGE RD, CARMEL, IN 4603209/17/21 NTC CAM 19038 A501 DOOR AND FRAME SCHEDULECATHOLIC CHURCHDOOR AND FRAME SCHEDULE DOOR FRAME UL RATINGSTC RATINGREMARKSMARKSIZE MATERIALFINISHELEVATIONGLASSMATERIALFINISHELEVATIONGLASSDETAIL WIDTHHEIGHTTHICKNESSHEADJAMBSILL001-1 SGL 4' - 0" 7' - 0" 1 3/4" GHM PT D1 - GHM PT F1 - H11 J11 S9 SIM - - 001-2 PAIR 3' - 0" 7' - 0" 1 3/4" HM PT D6 B HM PT F2 - H3 J3 - - - 7 002 PAIR 3' - 0" 7' - 0" 1 3/4" WD ST D6 B HM PT F2 - H1 J1 - - - 003 PAIR 3' - 0" 7' - 0" 1 3/4" WD ST D6 B HM PT F2 - H1 J1 - - - 1 005-1 PAIR 3' - 0" 7' - 0" 1 3/4" WD ST D2 B HM PT F2 - H1 J1 - - - 1 005-2 PAIR 3' - 0" 7' - 0" 1 3/4" WD ST D2 B HM PT F2 - H1 J1 - - - 1 005A SGL 3' - 0" 7' - 0" 1 3/4" WD ST D6 B HM PT F1 - H1 J1 - - - - 005B SGL 3' - 0" 7' - 0" 1 3/4" WD ST D6 B HM PT F1 - H1 J1 - - - - 006 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 009 PAIR 3' - 0" 7' - 8" 1 3/4" WD ST D6 B ETR PT F2 - ETR ETR - - - 2 010 DUTCH 3' - 0" 7' - 0" 1 3/4" WD ST D5 - HM PT F3 B H1, H2 J1, J2 - - - - 012 PAIR 3' - 0" 7' - 0" 1 3/4" WD ST D6 E HM PT F2 - H4 J4 - 90 MIN - 6 013 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 022 PAIR 3' - 0" 7' - 0" 1 3/4" AL AN D4 A AL AN F15 A H9 J9 - - - - 023 PAIR 3' - 0" 7' - 0" 1 3/4" WD ST D3 B HM PT F2 - H12 J12 - - - 1, 8 032 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - 6 034 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 035-1 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D6 B HM PT F1 - H1 J1 - - - - 035-2 PAIR 3' - 0" 7' - 0" 1 3/4" WD ST D6 B HM PT F2 - H1 J1 - - - - 036 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 038 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 039 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 044-1 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D6 H HM PT F1 - H17 J17 - - 46 STC 1, 6, 9 044-2 SGL 3' - 0" 7' - 0" 1 3/4" HM PT D6 B HM PT F1 - H5 J5 - - - 1, 6 045 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D6 B HM PT F1 - H16 J16 - - - 1, 6, 7, 8 100-1 PAIR 3' - 0" 7' - 0" 1 3/4" AL AN D4 A AL AN F12 A, F 3/A402 J10, J13 S9 - - 1, 4 100-2 PAIR 3' - 0" 7' - 0" 1 3/4" AL AN D4 A AL AN F12 A, F 3/A402 J10, J13 S9 - - 1, 4 100-3 PAIR 3' - 0" 7' - 0" 1 3/4" AL AN D4 C AL AN F8 C H6 J8 - - - 1, 4 100-4 PAIR 3' - 0" 7' - 0" 1 3/4" AL AN D4 C AL AN F8 C H6 J8 - - - 1, 4 101-1 SGL 3' - 0" 7' - 0" 1 3/4" AL AN D4 C AL AN F13 C H6 J6, J8 - - - - 101-2 SGL 3' - 0" 7' - 0" 1 3/4" AL AN D4 B AL AN F14 B H6 J6, J8 - - - - 102 SGL 3' - 0" 7' - 0" 1 3/4" AL AN D4 B AL AN F10 B H7 J7, J8 - - - - 103 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 104 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 105 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 106 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 108-1 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D3 B HM PT F4 B H1, H2 J1, J2 - - - - 108-2 SGL 3' - 0" 7' - 0" 1 3/4" AL AN D4 A AL AN F9 A H9 J9 S9 - - 4 108A SGL 4' - 0" 7' - 0" 1 3/4" GHM PT D1 - GHM PT F1 - H15 J15 - - - 1, 5 109 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 110 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 111 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 112 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 114 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 115 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D6 B HM PT F1 - H1 J1 - - - - 117 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 118 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 119 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 120 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 121 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 122 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 123 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 124 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - 125 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F1 - H1 J1 - - - - 126 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F1 - H1 J1 - - - - 127 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D6 B HM PT F1 - H1 J1 - - - - 129-1 PAIR 3' - 0" 7' - 0" 1 3/4" AL AN D4 A AL AN F16 A H9 J18 S9 - - 1, 4 129-2 PAIR 3' - 0" 7' - 0" 1 3/4" AL AN D4 B AL AN F11 B H6 J6 - - - - 130-1 PAIR 3' - 0" 7' - 0" 1 3/4" AL AN D4 B AL AN F7 B H6 J6, J8 - - - - 130-2 PAIR 3' - 0" 7' - 0" 1 3/4" AL AN D4 B AL AN F7 B H6 J6, J8 - - - - 130-3 PAIR 3' - 0" 7' - 0" 1 3/4" AL AN D4 A AL AN F6 A H9 J9 S9 - - 1, 4 130-4 PAIR 3' - 0" 7' - 0" 1 3/4" AL AN D4 A AL AN F6 A H13 J13 S9 - - 1, 4, 8 132 PAIR 3' - 0" 7' - 0" 1 3/4" WD ST D3 B HM PT F2 - H12 J12 - - - 1, 4, 8 133 PAIR 3' - 0" 7' - 0" 1 3/4" AL AN D4 A AL AN F5 A H9 J9 S9 - - 1, 4 149 PAIR 3' - 0" 7' - 0" 1 3/4" WD ST D3 B HM PT F2 - H12 J12 - - - 1, 8 158 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D2 B HM PT F1 - H14 J14 - - - 1, 7, 8 159 SGL 3' - 0" 7' - 0" 1 3/4" WD ST D1 - HM PT F3 B H1, H2 J1, J2 - - - - SCALE: 1/4" = 1'-0" DOOR ELEVATIONS SCALE: 1/4" = 1'-0" FRAME ELEVATIONS 1 OWNER COMMENTS 09-23-21 1 1 1 1 1 1 1 12/13/21