Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
AD201-LOWER-LEVEL-DEMOLITION-PLAN-Rev.0
A. HEAVY DASHED LINES INDICATE STRUCTURE, WALLS AND ITEMS TO BE DEMOLISHED UNLESS NOTED OTHERWISE. B. SOLID LINES INDICATE STRUCTURE, WALLS, & ITEMS TO REMAIN, UNLESS NOTED OTHERWISE. C. PROTECT ALL FINISHES, EQUIPMENT & OTHER ITEMS TO REMAIN. WHERE DAMAGE OCCURS, PATCH AND REPAIR OR OTHERWISE RESTORE TO ITS ORIGINAL CONDITION OR REPLACE. D. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONSTRUCTION AND RELATED CONDITIONS PRIOR TO STARTUP OF DEMOLITION OR NEW CONSTRUCTION. E. COORDINATE EXTENTS AND EXACT DIMENSIONS WITH EXTENTS AND EXACT DIMENSIONS OF NEW WORK. F. ANY AND ALL DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT AND OWNER. G. REMOVE ALL MISCELLANEOUS EQUIPMENT ATTACHED TO WALLS, FLOORS AND CEILINGS TO BE DEMOLISHED. COORDINATE WITH THE OWNER FOR ITEMS TO BE SALVAGED OR RE-INSTALLED. H. REMOVE ANY ITEMS NOT SPECIFICALLY IDENTIFIED TO BE REMOVED WHICH MUST OBVIOUSLY BE DEMOLISHED TO ACCOMMODATE NEW WORK. VERIFY WITH ARCHITECT. I. ALL OPENINGS, VOIDS, OR DAMAGED SURFACES LEFT BY THE REMOVAL OF EXISTING CONSTRUCTION, EQUIPMENT, PIPING, DUCTS, WINDOWS, ETC., SHALL BE PATCHED & REPAIRED TO MATCH SURROUNDING WORK. PREPARE TO RECEIVE NEW FINISHES AS REQUIRED. J. REMOVE ALL MASTIC, ADHESIVES, FASTENERS AND OTHER MATERIALS WHERE FINISHES (SUCH AS FLOORING, BASE) AND EQUIPMENT (SUCH AS CASEWORK, TACKBOARDS, MARKERBOARDS, MECHANICAL ITEMS, ETC.) HAVE BEEN REMOVED AT EXISTING SURFACES TO REMAIN. K. CONSTRUCT DUST AND SOUND CONTROL BARRIERS PRIOR TO THE START OF WORK. L. SEE SPECIFICATIONS FOR ASSIGNMENT OF RESPONSIBILITIES PERTAINING TO PATCHING AND REPAIR WORK REQUIRED OF EACH TRADE. M. DEMOLITION WORK TO BE COMPLETED BY MECHANICAL/PLUMBING, ELECTRICAL TRADES IS SHOWN ON OTHER SHEETS IN THIS SET OF CONTRACT DOCUMENTS. THIS CONTRACTOR SHALL REVIEW THE DEMOLITION WORK OF OTHER TRADES TO DETERMINE WHERE SUCH WORK COULD AFFECT HIS WORK AND SHALL COORDINATE HIS WORK WITH THE WORK OF ALL OTHER TRADES. N. AT NEW OPENINGS IN EXISTING BRICK MASONRY WALLS TO REMAIN EXPOSED IN THE FINISH WORK, TOOTH IN BRICK TO MATCH EXISTING. O. AT NEW OPENINGS IN EXISTING CONCRETE MASONRY WALLS TO REMAIN EXPOSED, TOOTH IN NEW CMU TO MATCH EXISTING. P. WHERE EXISTING SURFACE MOUNTED VISUAL DISPLAY BOARDS (MARKER, CHALK, TACK BOARDS) ARE BEING REMOVED FROM WALLS, WALL SURFACE BEHIND BOARD IS TO BE PREPARED TO MATCH TEXTURE OF SURROUNDING SURFACES. PROVIDE BLOCK FILLER AS REQUIRED AND PATCH MOUNTING HOLES COMPLETE. REMOVE PAINT BUILD UP AT BOARD EDGES. Q. CONTRACTOR IS RESPONSIBLE FOR PREP WORK REQUIRED FOR FLOOR SLAB TO RECEIVE NEW FINISHES. PREP WORK TO INCLUDE: PATCH FLOOR SLAB AT AREAS THAT WILL BE CUT TO ACCOMMODATE NEW PLUMBING LINES OR WHERE CAPPING OF EXISTING LINES BELOW THE SLAB IS REQUIRED AND FILLING IN HOLES IN SLAB WHERE EXISTING MEP HAS BEEN ABANDONED. GENERAL DEMOLITION NOTES CHOIR MECHANICAL MACHINE RM MEETING RM CORRIDOR WOMEN JANITOR RESTROOM MECHANICAL MEN GROOM PASSAGE MECHANICAL MUSIC STORAGE HALL CORRIDOR CORRIDOR STORAGE NURSERY STAIR STORAGE JOHN BOSCO MEETING RM MECHANICAL VESTIBULE 5 LOWER LEVEL ENTRY 4 6 1 2 2 LIBRARY CLOSET 1 ST. THOMAS AQUINAS ROOM ELEV. MACHINE RM STORAGE PASSAGE P.R.E. DIRECTOR ADULT DRE. 4 1 1 1 PASSAGE RESTROOM ASSOC. PRIEST ASSOC. PRIEST WORKROOM 1 BOOKKEEPER 1 2 COMMUNICATIONS 2 1 SPANISH APOSTOLATE DIRECTOR 1 STEWARDSHIP DIRECTOR VESTIBULE 4 STORAGE H.S. YOUTH MINISTER 2 1 1 3 7 SEC/RECEPTION 1 2 1 I.T. OFFICE 1 2 1PASSAGE 2 1 MUSIC STORAGE MULTI-PURPOSE OFFICE ASSOC. PRIESTPRIEST 1 2 2 2 1 5 1 2 2 1 2 2 2 2 2 2 21 1 25 2 2 2 88 8 9 10 4 11 15 1 1 2 30 30 30 12 30 1314 4 4 4 4 16 16 10 1314 10 1314 10 13 14 10 13 14 10 1314 10 1314 10 13 14 10 1314 10 1314 10 1314 10 1314 10 1314 DRE/SECRETARY 10 13 10 13 1 1 1 1 1 10 13 10 13 10 17 10 11 11 181818 18 18 18 18 1 2 3 19 1919 19 16 38 11 11 11 20 10 13 11 11 10 11 11 10 133 21 25 11 11 11 11 23 23 25 TYP. 21 22 SEE AD202 SEE AD202 21 SEE AD202 21 22 SEE AD202 ELEVATOR 2626 24 24 24 LOWER LEVEL F.F.E. -4' - 1 3/4" LOWER LEVEL F.F.E. -4' - 1 3/4" BOILER 2 2 1 1 2 11 28 28 10 17 17 10 17 10 17 1717 18 18 18 18 18 29 29 29 14 30 10 10 10 1010 PASSAGE STORAGE 10 31 31 31 32 33 27 36 36 36 37 37 37 UP UP UP UP 1 39 DRAWING TITLE: CERTIFIED BY: DRAWING NUMBER PROJECT NUMBER REVISIONS: SCOPE DRAWINGS:PROJECT: These drawings indicate the general scope of the project in terms of architectural design concept, the dimensions of the building, the major architectural elements and the type of structural, mechanical and electrical systems. The drawings do not necessarily indicate or describe all work required for full performance and completion of the requirements of the Contract. On the basis of the general scope indicated or described, the trade contractors shall furnish all items required for theproper execution and completion of the work. ISSUE DATE DRAWN BY CHECKED BY © 2018 CSO Architects, Inc. All Rights ReservedPARISH LIFE CENTER PROJECTOUR LADY OF MT. CARMEL14598 OAK RIDGE RD, CARMEL, IN 4603209/17/21 NTC CAM 19038 AD201 LOWER LEVEL DEMOLITION PLANCATHOLIC CHURCHKEYED DEMOLITION NOTES 1 REMOVE WALL COMPLETELY. 2 REMOVE DOOR AND FRAME COMPLETELY. 3 REMOVE CASEWORK COMPLETELY (INCLUDING SINKS). 4 REMOVE STOREFRONT SYSTEM AND DOOR(S) COMPLETELY. 5 REMOVE STAIR COMPLETELY. 6 REMOVE RAMP COMPLETELY. 7 REMOVE RECEPTION DESK AND CASEWORK AND SALVAGE FOR REUSE. 8 REMOVE WALL FOR NEW DOOR OPENING. 9 REMOVE PLUMBING FIXTURES AND TOILET ACCESSORIES (WHERE APPLICABLE) COMPLETE. 10 REMOVE SUSPENDED ACOUSTICAL CEILING SYSTEM COMPLETE. 11 REMOVE GYPSUM BOARD AND STUD CEILING/BULKHEAD COMPLETE. 12 PROTECT EXISTING NETWORK EQUIPMENT DURING DEMOLITION. 13 REMOVE CARPET AND VINYL BASE COMPLETELY. 14 REMOVE AND SALVAGE FURNITURE FOR RELOCATION IN NEW OFFICE. 15 REMOVE PLASTER SOFFIT COMPLETELY. 16 REMOVE CONCRETE SLAB (EXTERIOR). 17 REMOVE VCT AND VINYL BASE COMPLETELY. 18 PROTECT STRUCTURE DURING DEMOLITION. 19 REMOVE EXISTING DESK. 20 REMOVE EXISTING ACCORDION PARTITION COMPLETE. 21 REMOVE MECHANICAL EQUIPMENT - SEE MECHANICAL. 22 REMOVE WOOD FENCE. 23 REMOVE PORTION OF EXISTING WALL AS REQUIRED FOR NEW OPENING. 24 REMOVE EXISTING WOOD PANELING COMPLETE. 25 REMOVE MASONRY WALL WITH STONE CAP, HANDRAILS, AND GUARDRAILS COMPLETE. 26 REMOVE HOLLOW METAL FRAME AND WINDOW COMPLETE. 27 REMOVE EXISTING DOOR AND HARDWARE FROM FRAME TO REMAIN. 28 CAREFULLY REMOVE AND PROTECT EXISTING COPIER FOR RELOCATION IN NEW OFFICE. 29 REMOVE EIFS FINISH AND CLEAN TO CONCRETE WALL/STRUCTURE. 30 CAREFULLY REMOVE EXISTING CASEWORK AND SALVAGE FOR REUSE IN NEW OFFICE. 31 REMOVE CEILING TILES AS REQUIRED FOR INSTALLATION OF SPRINKLERS OR OTHER MEP WORK. 32 REMOVE GYPSUM BOARD ON THIS SIDE OF WALL WITHIN THE EXTENT SHOWN. SEE NEW CONSTRUCTION PLAN FOR WALL RENOVATION (FOR IMPROVED ACOUSTICS BETWEEN CHOIR ROOM AND NEW ELECTRICAL ROOM). 33 REMOVE AND RELOCATE KNOX BOX AS DIRECTED BY OWNER. 34 REMOVE WINDOW AND SILL AND INFILL OPENING. SEE WALL SECTIONS. 35 REMOVE DAMAGED PORTION OF PRECAST CONCRETE WALL CAP. 36 EXISTING GYPSUM BOARD CEILING TO REMAIN. PATCH AND REPAIR AS REQUIRED FOR INSTALLATION OF SPRINKLERS. 37 ABANDONED OPENINGS IN EXISTING WALL TO BE PATCHED AS REQUIRED TO MAINTAIN 3-HOUR FIRE BARRIER. 38 REMOVE PORTION OF MASONRY WALL WITH STONE CAP. 39 PROTECT EXISTING STAIR TO REMAIN DURING DEMOLITION. SCALE: 1/8" = 1'-0" AD201 1 LOWER LEVEL DEMOLITION PLAN 12/13/21