HomeMy WebLinkAboutC1.0 - Cover SheetREE
N
IGNELANOISSEFO RPNo.PE11700769ALBANY VILLAGE DEVELOPMENT PLAN
CITY OF CARMEL, INDIANA
COVERC0.0COVERREVISIONSALBANY VILLAGEDEVELOPMENT PLANUTILITY CONTACT INFORMATION:LOCATION MAPSOILS MAPSOILS LEGENDSITE MAPNOT FOR CONSTRUCTIONPRELIMINARYSHEET LIST TABLESheet TitleSheet DescriptionC0.0COVERC1.1-C1.2DEVELOPMENT PLANAREA LOCATION MAP: STATE OF INDIANAPROJECT LOCATION:CITY OF CARMELHAMILTON COUNTYSURVEYOR:STORM WATER ADMIN.:CABLE:WATER:ELECTRIC:SANITARY:DEPARTMENT:GAS:TELEPHONE:CARMEL ENGINEERINGCARMEL ENGINEERING DEPT.DEVELOPER:Lamb Property Developer, LLC9757 WESTPOINT DRIVE, SUITE 600INDIANAPOLIS, INDIANA 46256Tim Berrytberry@platinum-properties.com(317) 863-2057ZONING: ALBANY VILLAGE PUD ORDINANCE Z-666-21TOTAL SITE DISTURBANCE = 37 ACCIVIL ENGINEER & SURVEYOR:HWC ENGINEERING135 N. PENNSYLVANIA ST., SUITE 2800INDIANAPOLIS, IN 46204(317) 347-3663cjames@hwcengineering.comFLOOD HAZARD STATEMENT:C1.5-C1.6PRE-CONSTRUCTION STORMWATER POLLUTIONPREVENTION AND DEMOLITION PLANC3.0-C3.1INTERSECTION PLANDEVELOPMENT STANDARDS - ALBANY VILLAGE PUDAREA "A" LOTS 47-82MIN. LOT WIDTH AT BUILDING LINE80'MIN. LOT WIDTH AT R/W LINE50'MIN. FRONT YARD SETBACK25'MIN. REAR SETBACK20'MIN. SIDE SETBACK5'MIN. LOT AREA10,800 SFMAX. LOT COVERAGE60%MAX. BUILDING HEIGHT35'MIN. GROUND FLOOR AREA PER DWELLING:ONE STORY2,000 SFTWO STORY1,200 SFAREA "B" LOTS 1-46MIN. LOT WIDTH AT BUILDING LINE42'MIN. LOT WIDTH AT R/W LINE30'MIN. FRONT YARD SETBACK20'MIN. REAR SETBACK20'MIN. SIDE SETBACK5'MIN. LOT AREA4,500 SFMAX. LOT COVERAGE70%MAX. BUILDING HEIGHT35'MIN. GROUND FLOOR AREA PER DWELLING:ONE STORY1,350 SFINDIANAPOLIS - TERRE HAUTELAFAYETTE - MUNCIE - NEW ALBANYwww.hwcengineering.comLEGAL DESCRIPTIONC1.11COMMON AREA PLANC2.0-C2.3STREET PLAN & PROFILEC1.7-C1.8POST CONSTRUCTION STORMWATER POLLUTIONPREVENTION PLANC1.9-C1.10EMERGENCY FLOOD ROUTE PLANAREA "A" LOTS47-82AREA "B" LOTS 1-46C1.3-C1.4GRADING AND DRAINAGE PLANC0.1-C0.2EXISTING CONDITIONS & DEMOLITION PLANC3.3TRAFFIC CONTROL PLANC4.0-C4.3SANITARY SEWER PLAN & PROFILEC6.0-C6.6STORM SEWER PLAN & PROFILEC7.0-7.1WATER DISTRIBUTION PLANC8.0STORMWATER POLLUTION PREVENTION NOTESC8.1STORMWATER POLLUTION PREVENTION DETAILSC8.2-C8.3CONSTRUCTION DETAILSC8.4CARMEL DETAILSC8.5CARMEL PAVING & CURB POLICYC8.6HCSO DETAILSC8.7CARMEL WATER SPECIFICATIONSC8.8CARMEL WATER DETAILSC8.9-C8.10SANITARY SEWER DETAILSC8.11SANITARY SEWER SPECIFICATIONSL1.0-L1.2LANDSCAPE PLANC3.2ENTRANCE PLANPZ-2020-00155 ZPZ-2021-00073 PPPZ-2021-00074 SPDOCKET NUMBERSESTIMATED START DATE: JULY 2021ESTIMATED COMPLETION DATE: JULY 2026DESIGN SPEED = 25 MPHTHIS DEVELOPMENT WILL PROVIDE SINGLE FAMILYDWELLINGS AND TWO-FAMILY DWELLINGSC3.4MAINTENANCE OF TRAFFIC PLANJUNE 2, 2021