HomeMy WebLinkAboutChange_Order__1_-_White_Construction_LLC_White Construction, LLC; Increase Project Time; Contract 16-SW-85; CO #1; Engineering DocuSign Envelope ID: E2610C4C-6E80-45D8-8645-4083580AFFDB ED By Sorwy°roc huh bin at 4 b7 prn,Dec 08,2021 City of Carmel Project 16-SW-85 Westfield Boulevard over Carmel Creek Bridge Replacement CHANGE ORDER#1 Change order to adjust substantial and final completion dates due to adjacent project delay and utility delay. Contract Price prior to this Change Order $1,020,000.00 Contract Price will not he changed by this Change Order $0.00 New Contract Price including this Change Order $1,020,000,00 Amount Adjusted Contract Cumulative%Change Price from Original Contract Original Contract $1,020,000.00 N/A N/A _CO1 $0,00 $0.00 0,0% DocuSign Envelope ID: E2610C4C-6E80-45D8-8645-4083580AFFDB CITY OF CARMEL TO: Jeremy Kashman CONTRACT CHANGE ORDER NO: 1 City Engineer DATE: December 7,2021 City of Carmel Indiana PROJECT NAME: Westfield Blvd over Cannel Creek One Civic Square CITY REQ,NO.: Carmel,IN 46032 CITY PO NO: 16-SW-85 CITY PO DATE: 1. You are directed to make the following changes in this Contract: Substantial and Final Completion Dates for contract. SCHEDULED ADJUSTMENT ITEM AMOUNT (4)OR(-)DAYS II. The following referenced Documents further describe the changes outlined in Paragraph I, and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C.NO.: N/A The changes result in the following adjustment of Contract Price and Contract Time: Contract Price prior to this Change Order 1,020,000.00 Contract Price will not be changed by this Change Order New Contract Price including this Change Order 1,020,000.00 Contract Time prior to this Change Order Days 8/6/2021 Substantial Completion Date Contract Time prior to this Change Order 8/27/2021 Final Completion Date Net increased/decreased resulting from this Change Order 15 Days Current Contract Time including this Change Order Days 8/21/2021 Substantial Completion Date Current Contract Time including this Change Order 9/11/2021 Final Completion Date This Change Order is for full and final settlement of all direct,indirect,impact costs and time extensions incurred at any time resulting from the performance of the changed work. The Above Changes Are The Above Changes Are Accepted Approved Recommended r—DocuSigned by: American Structurepoint,Inc. While Construction,TLC I 1A ENGINEER CONTRACTOR .vo6Brai1gu-d,Mayor ,—DocuSigned by: 9025 River Road,Suite 200 3900 East White Ave, 114441,1 awA, 644.1, Address Address •MalysAtip4Burke,Member g y Ludianapolis.IN 46240 Clinton, IN 47842 1,01 (./),ihAbi CilyNale/Zip City/State/Zip LoriDWatsta ember 21 Jerem ashmian,PE,City Engineer By: . )a- 7/41-4/424 By: ATI EST: DocuSigned by: Phone: 317-281 9E.(33 Phonc(' 310 5,, (Amy Sue Wolferreeterit98"c5 12/16/2021 Date: 12-07-2021 Date: 121q/Z6ZA Date: DocuSign Envelope ID: E2610C4C-6E80-45D8-8645-4083580AFFDB American Structurepoint, Inc. Change Order Details 16-SW-85 Westfield Blvd over Carmel Creek Description Bridge Replacement of existing culvert with 3-sided precast concrete arch structure on Westfield Boulevard over Carmel Creek including relocation of City of Cannel water arid sewer lines in the vicinity of the culvert replacement Prime Contractor White Construction 3900 East Whilte Avenue,PO Box 249 Clinton,IN 47842 Change Order Status Pending Date Created 12/07/2021 Type Changed Conditions Summary Change Order#1. Change Order Description Change Order#1 is being crew-FYI to adjust the substantial and final completion dates for the project due to utility delays and start date being delayed due to another project at 111th Street and Westfield Blvd. Awarded Project Amount $1,020,000.00 Authorized Project Amount $1,020,000.00 Change Order Amount $0.00 Revised Project Amount $1,020,000.00 Change Order Details: 12/07/2021 16-SW-85-Westfield Blvd over Carmel Creek Page 1 of 2 _ _ DocuSign Envelope ID: E2610C4C-6E80-45D8-8645-4083580AFFDB New Time Limits Completion Date 08/21/2021 $1,500.00 (Primary)Substantial Completion Date Completion Date 09/1/72021 S500.00 (Primary)Final Completion Date 2 time limits Change Order Details: 12/07/2021 Page 2 of 2 1e-SW-85-Westfield Blvd over Carmel Creek _ _