City of Carmel Project 16-SW-85
Westfield Boulevard over Carmel Creek
Bridge Replacement
CHANGE ORDER#1
Change order to adjust substantial and final completion dates due to adjacent project delay and utility
delay.
Contract Price prior to this Change Order $1,020,000.00
Contract Price will not he changed by this Change Order $0.00
New Contract Price including this Change Order $1,020,000,00
Amount Adjusted Contract Cumulative%Change
Price from Original Contract
Original Contract $1,020,000.00 N/A N/A
_CO1 $0,00 $0.00 0,0%
DocuSign Envelope ID: E2610C4C-6E80-45D8-8645-4083580AFFDB
CITY OF CARMEL
TO: Jeremy Kashman CONTRACT CHANGE ORDER NO: 1
City Engineer DATE: December 7,2021
City of Carmel Indiana PROJECT NAME: Westfield Blvd over Cannel Creek
One Civic Square CITY REQ,NO.:
Carmel,IN 46032 CITY PO NO: 16-SW-85
CITY PO DATE:
1. You are directed to make the following changes in this Contract:
Substantial and Final Completion Dates for contract.
SCHEDULED ADJUSTMENT
ITEM AMOUNT (4)OR(-)DAYS
II. The following referenced Documents further describe the changes outlined in Paragraph I,
and are to be considered a part of this Change Order: R.F.P.: N/A W.D.C.NO.: N/A
The changes result in the following adjustment of Contract Price and Contract Time:
Contract Price prior to this Change Order 1,020,000.00
Contract Price will not be changed by this Change Order
New Contract Price including this Change Order 1,020,000.00
Contract Time prior to this Change Order Days 8/6/2021 Substantial Completion Date
Contract Time prior to this Change Order 8/27/2021 Final Completion Date
Net increased/decreased resulting from this Change Order 15 Days
Current Contract Time including this Change Order Days 8/21/2021 Substantial Completion Date
Current Contract Time including this Change Order 9/11/2021 Final Completion Date
This Change Order is for full and final settlement of all direct,indirect,impact costs and time
extensions incurred at any time resulting from the performance of the changed work.
The Above Changes Are The Above Changes Are Accepted Approved
Recommended r—DocuSigned by:
American Structurepoint,Inc. While Construction,TLC I 1A
ENGINEER CONTRACTOR .vo6Brai1gu-d,Mayor
,—DocuSigned by:
9025 River Road,Suite 200 3900 East White Ave,
114441,1 awA, 644.1,
Address Address •MalysAtip4Burke,Member
g y
Ludianapolis.IN 46240 Clinton, IN 47842
1,01 (./),ihAbi
CilyNale/Zip City/State/Zip LoriDWatsta ember
21
Jerem ashmian,PE,City Engineer
By: . )a- 7/41-4/424 By:
ATI EST: DocuSigned by:
Phone: 317-281 9E.(33 Phonc(' 310 5,, (Amy
Sue Wolferreeterit98"c5
12/16/2021
Date: 12-07-2021 Date: 121q/Z6ZA Date:
DocuSign Envelope ID: E2610C4C-6E80-45D8-8645-4083580AFFDB
American Structurepoint, Inc.
Change Order Details
16-SW-85 Westfield Blvd over Carmel Creek
Description Bridge Replacement of existing culvert with 3-sided precast concrete arch structure on Westfield Boulevard over Carmel Creek including
relocation of City of Cannel water arid sewer lines in the vicinity of the culvert replacement
Prime Contractor White Construction
3900 East Whilte Avenue,PO Box 249
Clinton,IN 47842
Change Order
Status Pending
Date Created 12/07/2021
Type Changed Conditions
Summary Change Order#1.
Change Order Description Change Order#1 is being crew-FYI to adjust the substantial and final completion dates for the project due to utility delays and start date being
delayed due to another project at 111th Street and Westfield Blvd.
Awarded Project Amount $1,020,000.00
Authorized Project Amount $1,020,000.00
Change Order Amount $0.00
Revised Project Amount $1,020,000.00
Change Order Details: 12/07/2021
16-SW-85-Westfield Blvd over Carmel Creek Page 1 of 2
_ _
DocuSign Envelope ID: E2610C4C-6E80-45D8-8645-4083580AFFDB
New Time Limits
Completion Date 08/21/2021 $1,500.00
(Primary)Substantial Completion Date
Completion Date 09/1/72021 S500.00
(Primary)Final Completion Date
2 time limits
Change Order Details: 12/07/2021
Page 2 of 2