Loading...
HomeMy WebLinkAboutBPW-02-17-76 MIi~ UTES OF BOARD OF PUBLIC WORKS FEBRUARY 17, 1976 The regular meeting of the Board of Public Works was called to order at 2 p.m. by Mayor Albert Pickett, who presided. All members were present. Police car bids were opened by City Attorney~as follows: Bidder Spec. Price/Unit Total Hatfield Ford 460/4 $4,810.94 $19,243.76 Don Hinds Ford 400/2 4,922.00 19,688.00 Dan You~ Che~Tolet 400/4 5,385.00 less trade 18,840.00 (2,700) Bill Estes Che~olet 400/4 5,250.00 less trade 17,000.00 (4,000) Bids were referred to Police Chief Baz-ney for the Police Commissioners recommenda- tion. o Survey of water service area: Mr. Thompson appeared before the Board to discuss the survey to be done on the service area of the Cac~mel Water Utility, Fir. Thompson stated he felt there was some logic in that Spring Mill Ro~d boundary would be au irfringme~t~ upon the Williamscreek basin and he felt we should have another line studied east of Meridian which is a break between the Williamscreek watershed which the City of Carmel does not intend to service with sewer line. Mr. Thompson stated the developers would pay for the additional study. Mr. Steve Ubrick, of Clyde E. Williams & Asso.~stated he would be back with detailed scope of work items for approval at the 23rd meeting. l~000t000 Gallon Storage Tank: Mayor Pickett stated we would have to get a definite commitment from the agencies involved before proceedingwith the site on the north side of 126th Street across the street from the Brookshire Water Plant. Mr. Uhrick presented a letter from Clyde E. Williams & Asso. regarding their recommendations for a site for a storag~ tank. U.S.G.S.: Mr. Jim Cook of the U.S.G.S. appeared before the Board and presented a letter to Mayor Pickett r~questing an agreement be signed allowing the U.S.G.S. to continue their cooperative water resource investigation in the Carmel area. A list of services was outlined annual cost would be $1,7~0.00. Those fmnds would be m~tched by the U.S.G.S. Mr. Hohl moved to authorize Mr. Kern draft an agreement for the Mayor to sig~, Mr. Kern seconded it and it passed unanimously. Water Suool.v Testiud¢: Mr. Steve Ub_rick requested the City of Carmel issue a letter to the contractor stating that we have good reason to suspect that the guaranteed capacity of well #? and well ~8 is not there and that we are investigatin~ and will report back to the contractor on what the true capacity is. Purpose of the letter would be so the City of Carmel would get on record with the contractor that they know there is a problem. Mayor instructed Steve Uhrick to prepare a rough draft of such in a letter for him to sign. Fire Chief Swails: Fire Chief Swails appeared before the Board and presented the Mayor with a copy of his proposed rules and regulations for the fire department. He also presented the Mayor with a "Mayors~badge" from the Midwest Fire & Safety. Policy on extendin~ Utilities into annexed areas: City Engineer stated he would like to know if there is a policy for extending utilities into arauexed areas. He stated he had received many calls requesting information on service to Rolling Meadows and Rolling Acres'areaoand Dan Young Che~-£olet. Mr. Kern stated if we didn't come up with service in three years from annexation date they could petition for dis-annexation. page 2 Mayor Pickett asked if that could still be done inasmuch as the Indianapolis Water Co. has lines in some of that area. Mr. Kern stated he would check into that. Mr. Kern instructed Mr. Hohl come back with some written recommendations for the problem, then he could check out the legal problems. Brine Waste Disposal: Mr. Steve Uhrick stated the Town of Carmel had received notice from the State Board of Health some time ago th~ they were going to have to do something about their brine waste from the ~ and #2 water plant. Mr. Ub_rick stated he would bri~ details to the 23rd meeting on cost of doing study. Softener Repipi~: Utilities Manager stated that there were some large automatic valves that were installed when plant #2 was built and he had been tryi~ to get parts for it recently and had been toldparts were no lo~er available snd h~ was recommendio~ repipingbe done. Preliminary cost would be around $7,000 Unit, there a~e two units. Mr. Kern asked how much money we would save and how difficult would it be if we stopped softening the water? M~yor Pickett stated he thought a study would be good to determine difference in cost. Mr. Bougherty will bring final figures of cost per unit to the 23rd meeting. Repair and Cleani~ Wells ~ & ~6: Upon the recom~endation of Utilities Manager, Mr. Kern moved that the repair and cleaning of wells ~5 &~6 be done by L~yne- Northern at a cost of not to exceed $1,900.00 per well, Mr. Hohl seconded it and it passed unanimously. Computer Billi~: Utilities ~r stated the present computer company used for the utility billi~was not doing satisfactory work. He stated that he h~d contacted the computer company that is doing the city payroll (COMMAiID) and they h~d given him an estimate for doing the billing. He requested permission to go ahead with the other company if the present compauy (ANTACOMP) did not improve. Mr. Kern stated he would advise Mr. Doutherty request a contract be drawn up ~. re-~terating the prices quoted. Mr. Kern also instructed Clerk-Treasurer find out if we would have to advertise for bids for the service. Mr. Dougherty stated he would like for us to try to get our payment for converting to ANTACOMP back from them, inasmuch as they did not give us what they had said they would. DumpinC of Sewage by Truck at South Sewer Plant: Mr. Dougherty stated Westfield does not have sewer service and they have asked us to take 1 or 2 truck los~ts of-sewag~ per day that they would haul to our south plant. Board of Health wanted us to take it. Mr. Dougherty stated he would recommend chargi~ $8.00 to $10.00 per truckload. Mr. Kern instructed utilities manager write out a memo to him with all the necessary in- formation using the $10.00 figure, so that he could draft an sg~reement between the City of Ca~met and Westfield for the service. Purchase of M~ters: Upon the recommendation of Utilities Man~ger, ]/r. Kern moved to purchase meters for wells ~ and ~f2 and P.H. Meters for water plants. Cost of meters for wells #1 and ~2 approximately $7~6.00 each. P.H. Meters approximately $116.00 each. Mr. Hohl seconded it and it passed unanimously. Purchase of M~dia: Upon the recommendation of Utilities Manager~ Mr. Kern moved to authorize the purchase of media for the north plant filter~ at between $2,~00 to $3,800, Mr. Hohl seconded it and it passed unanimously. Facilities Plan: Upon the recommendation of Steve Uhrick, Mr. Kern moved that an official of the City of Carmel contact Mr. Wilfong in regard to obtaining from hLm an amount not to exceed $~00 for his information in regard to the regional sewer project, Mr. Hohl seconded it and it passed unanimously. Mr. Kern moved to dispense with the reading ~f the minutes of the last regalar meeting and approve them as received, Mr. Hohl seconded it and it passed unanimously. Evans Retaina~e: Upon the recommendation of Utilities Manager, Mr. Kern moved to reduce Evans Construction Co. retainage to $10,000.00 for work on the Brookshire Plant Expansion, Mr. Hohl seconded it and it passed unanimously at 5:20 p.m. ATTEST: AIbert B. Pickett; Mayor