HomeMy WebLinkAboutH-101 - 1ST FLOOR HVAC PLANT T1 2 3
4 5
6 7
5.1
A.1
B
C
D
E
1.9
F
A
6.1
E.2
4.5
EUH-2
EUH-1
CC-2
DS-2
EWH-1
EWH-2
EUH-3
EUH-3
EUH-3
EUH-3
EUH-3
EUH-3
EUH-3
3
3
1
1
1
1
1
1
1
1
1
2
6ø
COMBUSTION AIR AND FLUE ROUTE UP THROUGH FLOOR BELOW.
TERMINATE HIGH ON WALL WITH CONCENTRIC WALL VENT.
EXHAUST DUCT ROUTES UP THROUGH FLOOR
BELOW. TERMINATE WITH 6" WALL CAP.
EUH-2
18166
Project:
Developer:
Sheet Number:
Engineer:
By:
Sheet Title:
CDG Number:
Last Revision Date:
Set Issue Date
Drawn By Checked By
Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION
DOCUMENTS800 West Monon Green Blvd.H-101
1ST FLOOR HVAC
PLAN
0702/20210702/2021
THOMAS KENNEDY JOE BOLYARD
1/8" = 1'-0"
1ST FLOOR HVAC PLAN 1
N
0 16'8'4'
SHEET PLAN NOTES
1 MOUNT BOTTOM OF UNIT AT 8'-0" ABOVE FINISHED FLOOR.
2 MOUNT TOP OF UNIT AT 8'-0" ABOVE FINISHED FLOOR.
3 MOUNT BOTTOM OF UNIT AT 1'-0" ABOVE FISNISHED FLOOR.
11700201
No.
STATE OFJOSEPHR.BO
L
Y
ARDPROFE
S
SIONA L E N G INEERDATE SIGNED 07/02/21
R E G I STERE
D
I
ND I A N A01/03/22