Loading...
HomeMy WebLinkAboutH-101 - 1ST FLOOR HVAC PLANT T1 2 3 4 5 6 7 5.1 A.1 B C D E 1.9 F A 6.1 E.2 4.5 EUH-2 EUH-1 CC-2 DS-2 EWH-1 EWH-2 EUH-3 EUH-3 EUH-3 EUH-3 EUH-3 EUH-3 EUH-3 3 3 1 1 1 1 1 1 1 1 1 2 6ø COMBUSTION AIR AND FLUE ROUTE UP THROUGH FLOOR BELOW. TERMINATE HIGH ON WALL WITH CONCENTRIC WALL VENT. EXHAUST DUCT ROUTES UP THROUGH FLOOR BELOW. TERMINATE WITH 6" WALL CAP. EUH-2 18166 Project: Developer: Sheet Number: Engineer: By: Sheet Title: CDG Number: Last Revision Date: Set Issue Date Drawn By Checked By Sheet Issue DateWINDSOR BUILDINGCarmel, IN 46032CONSTRUCTION DOCUMENTS800 West Monon Green Blvd.H-101 1ST FLOOR HVAC PLAN 0702/20210702/2021 THOMAS KENNEDY JOE BOLYARD 1/8" = 1'-0" 1ST FLOOR HVAC PLAN 1 N 0 16'8'4' SHEET PLAN NOTES 1 MOUNT BOTTOM OF UNIT AT 8'-0" ABOVE FINISHED FLOOR. 2 MOUNT TOP OF UNIT AT 8'-0" ABOVE FINISHED FLOOR. 3 MOUNT BOTTOM OF UNIT AT 1'-0" ABOVE FISNISHED FLOOR. 11700201 No. STATE OFJOSEPHR.BO L Y ARDPROFE S SIONA L E N G INEERDATE SIGNED 07/02/21 R E G I STERE D I ND I A N A01/03/22