Loading...
HomeMy WebLinkAboutPM3GASMETERELECTRICALPANEL(200AMP)NOT VERIFIEDMETER BANK NOT VERIFIEDTRASHSCREEN WALL1 P-2 P-1 N NEW RTU-1 GENERAL NOTES: A. EVERYTHING SHOWN IS NEW UNLESS NOTED OTHERWISE. B. THE CONTRACTOR SHALL INCLUDE IN BID PROPOSAL ALL COSTS REQUIRED TO COMPLETELY AND PROPERLY INSTALL ALL WORK REQUIRED FOR THE PROJECT, AND SHALL EXAMINE THE SCOPE OF WORK OF OTHER TRADES PRIOR TO SUBMITTING A BID PROPOSAL. C. EX = EXISTING; AFF = ABOVE FINISHED FLOOR. D. PROVIDE PIPE MARKERS ON ALL PIPING. E. P.C. TO CUT AND REMOVE CONCRETE, REPLACE CONCRETE AND USE 3/8" REBAR DOWEL RODS 24" O.C. F. P.C. TO PROVIDE OWN EXCAVATION AND BACKFILL. BACKFILL TO BE PIT RUN OR STONE COMPACTED TO 95% PROCTOR. G. DEMO: POINT WHERE EXISTING TO REMAIN STOPS AND DEMOLITION BEGINS REVISED: POINT WHERE NEW WORK CONNECTS TO EXISTING TO REMAIN. G G G G E.T.R. WH-1 1"CWEX-4"W1"-2#G4"W SPRINKLER NOTE: TURN EXISTING SPRINKLER HEADS UP IN THIS AREA TO ACCOMMODATE OPEN CEILING. SPRINKLER NOTE: EXISTING SPRINKLER SYSTEM TO REMAIN IN THIS AREA, NO WORK IN THIS AREA EXCEPT RELOCATE EXISTING HEAD AT DEMISING WALL FIELD VERIFY: INFORMATION CONCERNING THE LOCATION(S) AND SIZES OF EXISTING MECHANICAL EQUIPMENT, PIPING, PLUMBING AND DUCTWORK WAS OBTAINED FROM ORIGINAL DESIGN DRAWINGS AND/OR CURSORY FIELD OBSERVATION, HOWEVER, ACTUAL "AS-BUILT" DRAWINGS WERE NOT AVAILABLE, CERTAIN INFORMATION CONCERNING THE LOCATION OF THE EXISTING MECHANICAL EQUIPMENT, PIPING, PLUMBING AND DUCTWORK HAS BEEN ASSUMED IN THIS DRAWING. THE EXACT LOCATION(S) AND DIRECTION OF FLOW OF ALL EXISTING WORK IS UNKNOWN. REASONABLE EFFORT HAS BEEN MADE TO ACCURATELY DEPICT THE EXISTING CONDITIONS, HOWEVER, ALL EXISTING WORK MUST BE VERIFIED IN THE FIELD TO DETERMINE THE EXACT LOCATIONS, DIRECTIONS OF FLOW, DEPTH, SIZE, ETC.. PRIOR TO STARTING CONSTRUCTION. ANY CONFLICT BETWEEN THESE PLANS AND ACTUAL FIELD CONDITIONS SHALL BE REPORTED IMMEDIATELY TO THE ENGINEER FOR VERIFICATION AND/OR CORRECTION. 1. 4"W, 2"V, AND 1/2"CW FOR WATER CLOSET. 2. 2"W, 1-1/2"V, 1/2"CW&HW FOR LAVATORY. 3. WH-1 MOUNTED ON SHELF; SEE DETAIL, 3/4"CW&HW TO AND FROM WATER HEATER. 4. 1"CW, TIE-IN TO CW MAIN AS REQUIRED, VERIFY LOCATION IN FIELD. 5. 1"-2#G TO NEW GAS METER TO SERVE TENANT SPACE RTUS ; P.C. TO CONTACT UTILITY AND ARRANGE TO ADD A SEPERATE N.G. METER @ 2# PRESSURE ON 300MBH. 6. GAS CONNECTION TO NEW RTU ON ROOF, SEE DIRT LEG AND GAS APPLIANCE DETAILS. 7. STUB SUPPLY AND RETURN DUCTS DOWN INTO SPACE BELOW STRUCTURE FOR TENANT CONNECTION. 8. EXISTING 4"W, VERIFY LOCATION AND SIZE IN FIELD. 9. ROUTE EXHAUST DUCT UP THRU ROOF AS REQUIRED. 10. TEMPORARILY MOUNT RTU-1 THERMOSTAT ON NEAREST WALL AT 60" A.F.F. 11. P.C. TO FURNISH AND INSTALL NEW DOMESTIC WATER METER. PLAN NOTES:# 2 3 8 8 EX-4"W7 6 EF-1 9 5 4 FLOOR PLAN - PLUMBING AND HVAC SCALE: 1/4"= 1'-0" 10 RISER NEW TENANT SPACE 'A' 100 STORAGE 101 ADA RR 102 NEW TENANT SPACE 'B' 200 NEW ADA RR 201 M G NEW GAS METER EXISTING RTU 3/4"-2#G G 1"-2#G M 11 THE PLANS, IDEAS & DESIGNS REPRESENTED HERE ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF APRIL MCCLURG DESIGN CO. ALL RIGHTS RESERVED, EXCEPT WHEN WRITTEN CONSENT IS GIVEN. CONTRACTORS ARE TO VERIFY AND ARE RESPONSIBLE FOR ALL JOB SITE DIMENSIONS.UNIT 130- DIVIDEWEST CARMEL 'B' SHOPPES9873 NORTH MICHIGAN ROADCARMEL, INDIANA 46032Mechanical, Electrical, & Energy Engineering 2707 Rand Road Indianapolis, In 46241 voice: 317-464-9090 fax: 317-464-9393 www.daengineering.com DESIGN-AIRE ENGINEERING, INCSOUTH BUILDINGISSUE: SUBMITTAL SET DATE: 11/18/2021 PM-3 FLOOR PLAN - PLUMBING AND HVAC 01/03/22