HomeMy WebLinkAboutC010.0 - NVL 325 - Roof Truss LayoutFrameendwall todeck.
Stick frame crickets as needed.Framer topadout gableover brick asneeded
Field adjust overhang length as needed.
MUS26
MUS26
MUS26
St i ck f rame per pr int
Stick fr ame p er prin t
St i ck frame
p er pr i n t
St ick frame
per pr int
HTU26
HTU26
HTU26
HTU26
HTU26
Framer tofasten mulitplytruss
parts per engineering drawings.
Pad out GE07as needed for
flush exterior face.
Framer tofullyassemble
girder plies and scab trusses
beforeapplying anyloads.HGUS26-2TG03GE04
GE03TG04
T12
CG01CG01J02MG01M01MG01J01J01 J02
GE07
TG01
TG01TG02 GE01
GE06
T04
GE02
GE05V01
V02
V03
V04
PBE02PB03PBE03
PBE01T11(11)T15(4)
T06(4)
T08(6)T09(5)T10(3)PB01(17)
PB03(11)T05(4)PB02(11)T07(2)T03(5)T13(17)T02(5)T01(4)T01(3)11-00-0015-00-0022-07-0023-00-001-04-003-00-00 14-11-00 34-05-00 9-00-00 15-11-00 8-04-00 35-04-00
17-04-0017-04-0026-07-0024-08-0085-11-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-00 2-00-00 2-00-00 2-00-00
1-08-002-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00
4-10-082-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00
2-00-002-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-00 2-00-002-00-002-00-002-00-002-00-002-00-002-00-002-00-001-08-00
2-00-002-00-002-00-002-00-001-04-00
1-04-00
1-04-00
1-04-00
8-00
1-04-00
1-04-00
1-04-00
1-04-00
1-04-00
1-04-00
1-04-00
1-04-00
1-04-00
IRC 2018TPI 201420TLL -10TDL -10BDLHomesbyMcKenzieIncTurner Residence325Northvale1/4"=1'December 22,2021PHB21103374CUSTOMER:LOCATION:MODEL:JOB #:DATE:DESIGNER:DESIGN INFORMATION:SCALE:9028 OldSR 67SouthMooresville,IN 46158(317) 834-5380
Truss Placement Guide
1) Thislayout isintendedfor thepurposeof trusslocation
andplacement only. Refer tothebuilding plansfor actual
building construction.
2) All dimensions shown 00-00-00 are in feet-inches-sixteenths.
3) Trusses are spaced 24" on center unless otherwise noted.
4) Donot cut or modifytrusses.
5) Refer to theindividual truss design drawings for the location
of member bracing, uplift and truss end reactions.
6) Installation of all temporaryandpermanent bracing is
essential. Seetrussdrawings,BCSI-B2 SummarySheet
and building designer requirements.
7) Non-bearing wallsmaynot beshown on layout.
01/04/22