Loading...
HomeMy WebLinkAbout1100 SPECIFICATIONSMAGNOLIA CONDOMINIUMS DEREK M. SNYD E R DIRECTORY PATH : R:\Active\Uptown Partners\126th St & Rangeline Rd\Design\CAD\PlansFILENAME : 1100 SPECIFICATIONS.dwgDATE/USER : 1/14/2021 2:55 PM / DsnyderDEVELOPMENT CONSULTANTSTRANSPORTATION &BEECH GROVE, IN 461073417 SHERMAN DRIVE(317) 780-1555CROSSROADENGINEERS.COM1100 1100SPECIFICATIONSEARTHWORK 1. SCOPE OF WORK 2. BENCH MARKS 3. REMOVAL OF TREES 4. HANDLING OF TOPSOIL 5. DISPOSITION OF UTILITIES 6. SITE GRADING 7. EARTH WORK BALANCE WATER LINE SYSTEM1. SCOPE OF WORK 2. MATERIALS 3. APPLICATION CITY OF CARMEL RIGHT-OF-WAY PAVING POLICY1. GENERAL 2. FOUNDATION CITY OF CARMEL CONCRETE CURB POLICY1. General 2. Foundation 3. Aggregate Bases 5. INSPECTIONS ” STORM SEWER SYSTEMS 1. SCOPE OF WORK 2. STORM SEWER CONSTRUCTION 3. APPLICATION 3. AGGREGATE BASES 4. ASPHALT PAVEMENT 4. Concrete Curb 5. Inspections 6. Acceptance SANITARY SEWER SYSTEMS 1. SCOPE OF WORK 2. MATERIALS 3. APPLICATION Powered by TCPDF (www.tcpdf.org)10/25/21