Loading...
HomeMy WebLinkAboutHP7-Z8C6-ATV6P-v1-SubmissionDownload (1)Construction Stormwater - Notice of Intent - New Application (External) version 1.13 (Submission #: HP7-Z8C6-ATV6P, version 1) Details Form Alias Construction Stormwater - Notice of Intent - New Application (External) Submission #HP7-Z8C6-ATV6P Status Submitted Fee $100.00 (Paid) Form Input Application Preparer Information Stormwater Const Plan Preparer Stormwater Const Application Preparer Prefix NONE PROVIDED First Name Derek Last Name Snyder Title Project Engineer Organization Name CrossRoad Engineers, PC Phone Type Number Extension Business 317-780-1555 135 Email dsnyder@crossroadengineers.com 3417 SHERMAN DR BEECH GROVE, IN 46107 USA Applicant (Project Site Owner) Information Stormwater Const Project Contact Select Additional Roles that apply to the Application Preparer Select Additional Roles that apply to the Applicant 8/16/2021 5:10:38 PM Page 1 of 6 Applicant Prefix NONE PROVIDED First Name Erik Last Name Dirks Title Project Manager Organization Name Magnolia Condos, LLC Phone Type Number Extension Mobile 317-447-0119 Business 317-816-3151 Email erik@oldtowncompanies.com 1132 S RANGELINE RD STE 200 CARMEL, IN 46032 USA Additional Contacts (1 of 1) 0 Stormwater Const Project Contact Contact Prefix NONE PROVIDED First Name Brian Last Name Beck Title Project Manager Organization Name Old Town Construction Phone Type Number Extension Business 317-696-8563 Email brian.beck@oldtownconst.com 522 S RANGELINE RD CARMEL, IN 46032 USA Project Information Site Name Magnolia Condominiums When populating the Project Name, you may reenter the Site Name or provide additional information to further clarify the project. Project Name Magnolia Condominiums Contact Role 8/16/2021 5:10:38 PM Page 2 of 6 Project Location 39.97034325935786,-86.12545145731477 No Description of Project Location The project site is located at the southwest corner of the City Center Drive (126th Street) and Pawnee Road intersection. City Carmel State IN Postal Code 46032 Section / Township / Range Help Provide the legal description for the approximate center of the project (the nearest � Section should be provided). All fields must be populated. If the project area is within a Military Grant, enter NA in the Twnshp and Range fields and enter the Civil Twnshp. Section/Military Grant Twnshp Range Civil Twnshp 31 18N 4E Clay NONE PROVIDED Hamilton Hamilton No Corporation Residential Multi-Family Project Scope The project involves the construction of four 5,283 sq. ft. condominium buildings and necessary infrastructure including asphalt streets, alleys, concrete sidewalks, storm sewers and an underground detention system. No Total Project Acreage 1.57 Proposed Land Disturbance (In Acres) 1.77 Total Impervious Surface Area (In Square Feet, Estimated for Completed Project) 50094 Discharge Type and Receiving Waters Instructions Additional information for completing the fields for "Discharge Type" and "Receiving Water" is available on the IDEM website. Click here for Guidance Is there a physical address for the project? Principal Meridian Primary Project County County(ies) of Project Location Is this NOI a result of change of ownership? Property Ownership Status Project Type Is this project phased? 8/16/2021 5:10:38 PM Page 3 of 6 Storm System Name of Primary Receiving Water City of Carmel storm sewer (JW Hawkins drain is the ultimate receiving water). Name of Secondary Receiving Water NONE PROVIDED Name of Tertiary Receiving Water NONE PROVIDED 303(d) Impaired Water Instructions Based on the receiving waters identified above, follow the link below to identify the waterbodies to which the project discharges and that are listed on the current 303(d) list of impaired waters. Indiana 303(d) List of Impaired Waters No U.S. EPA TMDL Instructions Based on the receiving waters identified above, follow the link below to identify the waterbodies to which the project discharges and that are listed on a U.S. EPA established or approved Total Maximum Daily Load (TMDL). Indiana TMDLs No Estimated Start Date for Land-Disturbing Activities 8/19/2021 Estimated End Date for all Land-Disturbing Activity 8/19/2026 Attach proof of publication in a newspaper of general circulation in the affected area that notified the public that a construction activity is to commence, including all required elements. Required Elements Proof of Publication TL17748 etear.pdf - 04/22/2021 08:57 AM TL17748- - Publishers Affidavit.pdf - 04/22/2021 08:57 AM Comment NONE PROVIDED Reduce Plat / Project Site Map 100 TITLE SHEET.pdf - 08/16/2021 04:48 PM 900 PRE-CONSTRUCTION EROSION CONTROL PLAN.pdf - 08/16/2021 04:48 PM 901 POST-CONSTRUCTION EROSION CONTROL PLAN.pdf - 08/16/2021 04:48 PM 902 STORMWATER POLLUTION PREVENTION PLAN.pdf - 08/16/2021 04:48 PM Comment NONE PROVIDED Construction/Stormwater Pollution Prevention Plan Review Information Click here to determine if the project is within a MS4 Yes, the Project is Regulated by the MS4 Identify the MS4 or MS4s that Own/Operate the project or Regulate the project Carmel City MS4 Discharge Type Does the project discharge to a waterbody on the current 303d list of impaired waters Does the project discharge to a water associated with a U.S. EPA established or approved Total Maximum Daily Load (TMDL)? Is the project located within jurisdiction of a Municipal Separate Storm Sewer System (MS4)? 8/16/2021 5:10:38 PM Page 4 of 6 Plan Review Verification/Acceptance SW-2021-00021 Magnolia Condominiums Phase 1.pdf - 08/16/2021 04:50 PM Comment NONE PROVIDED Plan Submittal Date 4/23/2021 Plan Acceptance/Waiver Date 8/16/2021 Stormwater Const Plan Reviewer Prefix NONE PROVIDED First Name John Last Name Thomas Title Storm Water Administrator Organization Name City of Carmel Departments of Engineering & Storm Water Phone Type Number Extension Business 317-571-2314 Email jthomas@carmel.in.gov 1 CIVIC SQ CARMEL, IN 46032 USA Certification True True True True True True Attachments The stormwater quality measures included in the Construction Plan comply with the requirements of 327 IAC 15-5- 6.5, 327 IAC 15-5-7, and 327 IAC 15-5-7.5. The stormwater pollution prevention plan complies with all applicable federal, state, and local stormwater requirements. The measures required under 327 IAC 15-5-7 and 327 IAC 15-5-7.5 will be implemented in accordance with the stormwater pollution prevention plan. The applicable Soil and Water Conservation District or other entity designated by IDEM, has been sent a copy of the Construction Plan for review. Stormwater quality measures beyond those specified in the stormwater pollution prevention plan will be implemented during the life of the permit if necessary to comply with 327 IAC 15-5-7. Implementation of stormwater quality measures will be inspected by trained individuals as defined in 327 IAC 15-5-4. 8/16/2021 5:10:38 PM Page 5 of 6 Date Attachment Name Context User 8/16/2021 4:50 PM SW-2021-00021 Magnolia Condominiums Phase 1.pdf Attachment Derek Snyder 8/16/2021 4:48 PM 902 STORMWATER POLLUTION PREVENTION PLAN.pdf Attachment Derek Snyder 8/16/2021 4:48 PM 901 POST-CONSTRUCTION EROSION CONTROL PLAN.pdf Attachment Derek Snyder 8/16/2021 4:48 PM 900 PRE-CONSTRUCTION EROSION CONTROL PLAN.pdf Attachment Derek Snyder 8/16/2021 4:48 PM 100 TITLE SHEET.pdf Attachment Derek Snyder 4/22/2021 8:57 AM TL17748- - Publishers Affidavit.pdf Attachment Derek Snyder 4/22/2021 8:57 AM TL17748 etear.pdf Attachment Derek Snyder Status History User Processing Status 4/14/2021 8:44:32 AM Derek Snyder Draft 8/16/2021 4:59:38 PM Derek Snyder Submitted 8/16/2021 5:10:38 PM Page 6 of 6