HomeMy WebLinkAboutHP7-Z8C6-ATV6P-v1-SubmissionDownload (1)Construction Stormwater - Notice of Intent - New
Application (External)
version 1.13
(Submission #: HP7-Z8C6-ATV6P, version 1)
Details
Form Alias Construction Stormwater - Notice of Intent - New Application (External)
Submission #HP7-Z8C6-ATV6P
Status Submitted
Fee $100.00 (Paid)
Form Input
Application Preparer Information
Stormwater Const Plan Preparer
Stormwater Const Application Preparer
Prefix
NONE PROVIDED
First Name
Derek
Last Name
Snyder
Title
Project Engineer
Organization Name
CrossRoad Engineers, PC
Phone Type Number Extension
Business 317-780-1555 135
Email
dsnyder@crossroadengineers.com
3417 SHERMAN DR
BEECH GROVE, IN 46107
USA
Applicant (Project Site Owner) Information
Stormwater Const Project Contact
Select Additional Roles that apply to the Application Preparer
Select Additional Roles that apply to the Applicant
8/16/2021 5:10:38 PM Page 1 of 6
Applicant
Prefix
NONE PROVIDED
First Name
Erik
Last Name
Dirks
Title
Project Manager
Organization Name
Magnolia Condos, LLC
Phone Type Number Extension
Mobile 317-447-0119
Business 317-816-3151
Email
erik@oldtowncompanies.com
1132 S RANGELINE RD
STE 200
CARMEL, IN 46032
USA
Additional Contacts (1 of 1)
0
Stormwater Const Project Contact
Contact
Prefix
NONE PROVIDED
First Name
Brian
Last Name
Beck
Title
Project Manager
Organization Name
Old Town Construction
Phone Type Number Extension
Business 317-696-8563
Email
brian.beck@oldtownconst.com
522 S RANGELINE RD
CARMEL, IN 46032
USA
Project Information
Site Name
Magnolia Condominiums
When populating the Project Name, you may reenter the Site Name or provide additional information to further clarify the project.
Project Name
Magnolia Condominiums
Contact Role
8/16/2021 5:10:38 PM Page 2 of 6
Project Location
39.97034325935786,-86.12545145731477
No
Description of Project Location
The project site is located at the southwest corner of the City Center Drive (126th Street) and Pawnee Road intersection.
City
Carmel
State
IN
Postal Code
46032
Section / Township / Range Help
Provide the legal description for the approximate center of the project (the nearest � Section should be provided).
All fields must be populated. If the project area is within a Military Grant, enter NA in the Twnshp and Range fields
and enter the Civil Twnshp.
Section/Military Grant Twnshp Range Civil Twnshp
31 18N 4E Clay
NONE PROVIDED
Hamilton
Hamilton
No
Corporation
Residential Multi-Family
Project Scope
The project involves the construction of four 5,283 sq. ft. condominium buildings and necessary infrastructure including asphalt
streets, alleys, concrete sidewalks, storm sewers and an underground detention system.
No
Total Project Acreage
1.57
Proposed Land Disturbance (In Acres)
1.77
Total Impervious Surface Area (In Square Feet, Estimated for Completed Project)
50094
Discharge Type and Receiving Waters Instructions
Additional information for completing the fields for "Discharge Type" and "Receiving Water" is available on the IDEM website.
Click here for Guidance
Is there a physical address for the project?
Principal Meridian
Primary Project County
County(ies) of Project Location
Is this NOI a result of change of ownership?
Property Ownership Status
Project Type
Is this project phased?
8/16/2021 5:10:38 PM Page 3 of 6
Storm System
Name of Primary Receiving Water
City of Carmel storm sewer (JW Hawkins drain is the ultimate receiving water).
Name of Secondary Receiving Water
NONE PROVIDED
Name of Tertiary Receiving Water
NONE PROVIDED
303(d) Impaired Water Instructions
Based on the receiving waters identified above, follow the link below to identify the waterbodies to which the project discharges
and that are listed on the current 303(d) list of impaired waters.
Indiana 303(d) List of Impaired Waters
No
U.S. EPA TMDL Instructions
Based on the receiving waters identified above, follow the link below to identify the waterbodies to which the project discharges
and that are listed on a U.S. EPA established or approved Total Maximum Daily Load (TMDL).
Indiana TMDLs
No
Estimated Start Date for Land-Disturbing Activities
8/19/2021
Estimated End Date for all Land-Disturbing Activity
8/19/2026
Attach proof of publication in a newspaper of general circulation in the affected area that notified the public that a construction
activity is to commence, including all required elements.
Required Elements
Proof of Publication
TL17748 etear.pdf - 04/22/2021 08:57 AM
TL17748- - Publishers Affidavit.pdf - 04/22/2021 08:57 AM
Comment
NONE PROVIDED
Reduce Plat / Project Site Map
100 TITLE SHEET.pdf - 08/16/2021 04:48 PM
900 PRE-CONSTRUCTION EROSION CONTROL PLAN.pdf - 08/16/2021 04:48 PM
901 POST-CONSTRUCTION EROSION CONTROL PLAN.pdf - 08/16/2021 04:48 PM
902 STORMWATER POLLUTION PREVENTION PLAN.pdf - 08/16/2021 04:48 PM
Comment
NONE PROVIDED
Construction/Stormwater Pollution Prevention Plan Review Information
Click here to determine if the project is within a MS4
Yes, the Project is Regulated by the MS4
Identify the MS4 or MS4s that Own/Operate the project or Regulate the project
Carmel City MS4
Discharge Type
Does the project discharge to a waterbody on the current 303d list of impaired waters
Does the project discharge to a water associated with a U.S. EPA established or approved Total Maximum Daily
Load (TMDL)?
Is the project located within jurisdiction of a Municipal Separate Storm Sewer System (MS4)?
8/16/2021 5:10:38 PM Page 4 of 6
Plan Review Verification/Acceptance
SW-2021-00021 Magnolia Condominiums Phase 1.pdf - 08/16/2021 04:50 PM
Comment
NONE PROVIDED
Plan Submittal Date
4/23/2021
Plan Acceptance/Waiver Date
8/16/2021
Stormwater Const Plan Reviewer
Prefix
NONE PROVIDED
First Name
John
Last Name
Thomas
Title
Storm Water Administrator
Organization Name
City of Carmel Departments of Engineering & Storm Water
Phone Type Number Extension
Business 317-571-2314
Email
jthomas@carmel.in.gov
1 CIVIC SQ
CARMEL, IN 46032
USA
Certification
True
True
True
True
True
True
Attachments
The stormwater quality measures included in the Construction Plan comply with the requirements of 327 IAC 15-5-
6.5, 327 IAC 15-5-7, and 327 IAC 15-5-7.5.
The stormwater pollution prevention plan complies with all applicable federal, state, and local stormwater
requirements.
The measures required under 327 IAC 15-5-7 and 327 IAC 15-5-7.5 will be implemented in accordance with the
stormwater pollution prevention plan.
The applicable Soil and Water Conservation District or other entity designated by IDEM, has been sent a copy of the
Construction Plan for review.
Stormwater quality measures beyond those specified in the stormwater pollution prevention plan will be
implemented during the life of the permit if necessary to comply with 327 IAC 15-5-7.
Implementation of stormwater quality measures will be inspected by trained individuals as defined in 327 IAC 15-5-4.
8/16/2021 5:10:38 PM Page 5 of 6
Date Attachment Name Context User
8/16/2021 4:50 PM SW-2021-00021 Magnolia Condominiums Phase 1.pdf Attachment Derek Snyder
8/16/2021 4:48 PM 902 STORMWATER POLLUTION PREVENTION PLAN.pdf Attachment Derek Snyder
8/16/2021 4:48 PM 901 POST-CONSTRUCTION EROSION CONTROL PLAN.pdf Attachment Derek Snyder
8/16/2021 4:48 PM 900 PRE-CONSTRUCTION EROSION CONTROL PLAN.pdf Attachment Derek Snyder
8/16/2021 4:48 PM 100 TITLE SHEET.pdf Attachment Derek Snyder
4/22/2021 8:57 AM TL17748- - Publishers Affidavit.pdf Attachment Derek Snyder
4/22/2021 8:57 AM TL17748 etear.pdf Attachment Derek Snyder
Status History
User Processing Status
4/14/2021 8:44:32 AM Derek Snyder Draft
8/16/2021 4:59:38 PM Derek Snyder Submitted
8/16/2021 5:10:38 PM Page 6 of 6