Loading...
HomeMy WebLinkAboutS0-3A STANDARD WOOD FRAMING DETAILSALTERNATE PANEL JOINT SPACING RE: PLAN@ FLOORSRE: PLAN@ ROOFRE: SHEARWALL SILL PLATE ANCHORAGE SCHEDULE RE: SILL PLATE ANCHORAGE SCHEDULE STUD PACK @ EA. END OF SHEARWALL RE: HOLDOWN / STRAP SCHED. FOR NUMBER OF PLYS., PROVIDE BOUNDARY NAILING ALONG EACH INDIVIDUAL PLY DOUBLE TOP PLATES 2X STUDS RE: SILL & SOLE PLATE ANCHORAGE SCHED. SHEARWALL RE: SILL PLATE ANCHORAGE SCHEDULE LOAD BEARING WALL ROOF DECKING RE: SPECS NON-STRUCTURAL SHEATHING RE: ARCH. (NOT SHOWN) FLOOR DRAG TRUSS REQUIRED ABOVE PARALLEL SHEARWALLS, SEE NOTE 3 ON THE SHEAR BLOCKING SCHEDULE ON THE STANDARD SHEARWALL NOTES AND SCHED. SHEET. TRUSS BRACING REQUIRED AT PERPENDICULAR SHEARWALLS, SEE TYPICAL DETAILROOF DRAG TRUSS REQUIRED AT PARALLEL SHEARWALLS, SEE ROOF DRAG TRUSS CONNECTION DETAIL (BLOCK PANEL JOINTS WHERE REQUIRED BY SHEARWALL SHEATHING SCHEDULE) PLYWOOD FLOOR SHEATHING INTERSTITIAL STUD PACK @ EA. END OF SHEARWALL STRUCTURAL SHEARWALL SHEATHING RE: SHEARWALL LOCATION PLAN & SHEARWALL SHEATHING SCHEDULE. SHEATHING MUST BE INSTALLED PRIOR TO FLOOR TOPPINGS THAT WOULD PREVENT SHEATHING FROM BEING LAPPED FULLY ONTO SILL/SOLE PLATE BOUNDARY NAILING @ PANEL EDGES, RE: SHEARWALL SCHED. FOR FASTENER TYPE AND SPACING FIELD NAILING @ INTERMEDIATE STUDS, RE SHEARWALL SCHED. FOR FASTENER TYPE AND SPACING TOP OF PLATETOP OF PLATECRIPLES REQUIRED AT WALL STUD PACKS AND COLUMNS, SEE TYPICAL DETAIL FOR INTERSTITIAL FLOOR FRAMING AT COLUMNS ROOF TRUSS FRAMING ANCHOR AT EACH TRUSS, RE ROOF PLAN NOTES FLOOR TRUSS SHEARBLOCKS REQUIRED ABOVE PERPENDICULAR SHEARWALLS, SEE SHEAR BLOCKING SCHEDULE ON THE STANDARD NOTES SCHED. SHEARWALL SHEET. RE: UPLIFT CONNECTIONS DETAILS SHEARWALL STRAPPING WHERE INDICATED ON SHEARWALL LOCATION PLAN, ALIGN STRAPED STUD PACKS FLOOR-TO-FLOOR AND WITH HOLDOWN STUD PACKS AT LOWEST LEVEL MAY BE REPLACED WITH ROD SYSTEM IF APPROVED BY OWNER. HOLDOWN WHERE INDICATED ON SHEARWALL LOCATION PLAN MAY BE REPLACED WITH ROD SYSTEM IF APPROVED BY OWNER. RE: UPLIFT CONNECTIONS DETAIL FOR TYPICAL FLOOR CAVITY STRAPPING REQUIREMENTS RE: UPLIFT CONNECTIONS DETAILS 1 TYPICAL MULTIPLE LEVEL ELEVATION AT BEARING WALLS & SHEARWALLS RE: PLANDOUBLE TRIMMERS DOUBLE KING STUD (TRIPLE KING STUD REQ'D IN WALLS W/ 3 OR MORE FLOORS ABOVE)BEAM / HEADER RE: PLAN OPENINGS UNDER 7'-0" WIDE SINGLE TRIMMER NAIL W/ 6~0.131"X3" LONG NAILS SINGLE KING STUD (DOUBLE KING STUD REQ'D IN WALLS W/ 3 OR MORE FLOORS ABOVE) BEAM / HEADER RE: PLAN OPENINGS UNDER 5'-0" WIDE TRIPLE KING STUD (QUADRUPLE KING STUD REQ'D IN WALLS W/ 3 OR MORE FLOORS ABOVE)BEAM / HEADER RE: PLAN OPENINGS UNDER 10'-0" WIDE NAIL W/ 8~0.131"X3" LONG NAILS DOUBLE TRIMMERS NAIL W/ 8~0.131"X3" LONG NAILS NOTES: 1. STUD PACKS SHOWN ARE THE MINIMUMS AND MAY BE LARGER PER PLAN. 2. AT FLUSH BEAMS ALL STUDS TO BE FULL HEIGHT UNDER BEAM FULLY. 3. SHEARWALLS ENDS MAY REQUIRE ADDITIONAL STUDS. RE: HOLDOWN SCHEDULE FOR MIN. FOR EACH HOLDOWN MODEL. 4. RE: STANDARD NAILING SCHEDULE, FOR STUD PACK PLY NAILING. 5. CONTACT EOR FOR OPENINGS 10' OR GREATER. 2 TYP. 2X4 LOAD BEARING WALL HEADER SUPPORT DETAIL TOP OF PLATEA 35 SINGLE TRIMMERS DOUBLE KING STUD (TRIPLE KING STUD REQ'D IN WALLS W/ 3 OR MORE FLOORS ABOVE)BEAM / HEADER RE: PLAN OPENINGS UNDER 7'-0" WIDE DOUBLE KING STUD (TRIPLE KING STUD REQ'D IN WALLS W/ 3 OR MORE FLOORS ABOVE)BEAM / HEADER RE: PLAN OPENINGS UNDER 10'-0" WIDE NAIL W/ 8~0.131"X3" LONG NAILS SINGLE TRIMMERS NAIL W/ 8~0.131"X3" LONG NAILS A35SINGLE TRIMMER NAIL W/ 6~0.131"X3" LONG NAILS SINGLE KING STUD (DOUBLE KING STUD REQ'D IN WALLS W/ 3 OR MORE FLOORS ABOVE) BEAM / HEADER RE: PLAN OPENINGS UNDER 5'-0" WIDE NOTES: 1. STUD PACKS SHOWN ARE THE MINIMUMS AND MAY BE LARGER PER PLAN. 2. AT FLUSH BEAMS ALL STUDS TO BE FULL HEIGHT UNDER BEAM FULLY. 3. SHEARWALLS ENDS MAY REQUIRE ADDITIONAL STUDS. RE: HOLDOWN SCHEDULE FOR MIN. FOR EACH HOLDOWN MODEL. 4.RE:STANDARD NAILING SCHEDULE, FOR STUD PACK PLY NAILING. 5.CONTACT EOR FOR OPENINGS 10' OR GREATER. 3 TYP. 2X6 LOAD BEARING WALL HEADER SUPPORT DETAIL RE: PLANTOP OF PLATEBEARING PLATES 2X SUDS SPLICE IN BOTTOM PLYSPLICE 48" MIN. LAP W/ 16~16D NAILS, STAGGERED OR 24~0.131"X3" NAILS, STAGGERED NOTE: - MINIMUM LAP SHALL BE 2'-0" W/ 8~16D OR 12~0.131"X3" NAILS STAGGERED AT NON-BEARING WALLS - SHORT SPLICES MAY BE REPAIRED W/ CS18X24" W/10~ 8D NAILS @ EA. SIDE OR (2)CSHP18 X 22" W/(9)0.131"X2 1 2" EA. SIDE 4 TYPICAL TOP PLATE SPLICING DETAIL RE: PLANTOP OF PLATE2-2X IN TOP PLY (2) SIMPSON CS 18 STRAPS X 24" WITH 10-8D NAILS @ EACH SIDE, OR (2)CSHP18 X 22" W/ (9)0.131"X2 1 2" EA. SIDE TOP PLATE TRIMMER POST OR STUD PACK, RE: TYPICAL LOAD BEARING WALL HEADER SUPPORT DETAILS NOTE: IF TOP PLATE IS CONT. OVER TOP OF BEAM, STRAPPING MAY BE OMITTED. RE: TYPICAL LOAD BEARING WALL HEADER SUPPORT DETAILS 5 TO TOP PLATE STRAPPING RE: PLANTOP OF PLATETYPICAL DROP BEAM/HIGH HEADER 7 NOTCHES & BORED HOLES IN WALL STUDS DETAIL 5/8 "MIN. 5/8 "MIN. "N" PROVIDE GAP ABOVE THE PIPE TO ACCOMMODATE WOOD SHRINKAGE + SETTLEMENT PER STRUCTURAL SPECS. (114" MIN.) 25% W40% W 40% W "N" (MAX) "D" (MAX) Notes 1. BORED HOLES SHALL NOT BE LOCATED AT THE SAME SECTION OF STUD AS A NOTCH. 2. PROVIDE ELONGATED HOLES SO AS TO ACCOMMODATE WOOD SHRINKAGE (RE: SPECS.). NOT PROVIDING A GAP BETWEEN THE STUD AND THE PIPE MAY RESULT IN DAMAGE TO THE PIPE. 3. "D" MAY BE INCREASED TO 60% OF "W" FOR TWO CONSECTIVE NON LOAD BEARING STUDS MAXIMUM, BUT STUDS MUST BE DOUBLED UP. PROVIDE 16 GA. NAIL STOP WHERE LINE OR PIPE IS LESS THAN 112" FROM STUD FACE. PROVIDE 16 GA. NAIL STOP WHERE LINE OR PIPE IS LESS THAN 112" FROM STUD FACE. INTERIOR NON LOAD BEARING WALL STUDS EXTERIOR AND/OR LOAD BEARING WALL STUDS (SEE NOTE 3)40% W "D" "W " "W" PROVIDE BOUNDARY NAILING ALONG BOTH STUDS PLYS ADJACENT TO INTERSECTING WALL (NOT SHOWN) 0.131"X3" NAILS @ 3" O.C. AT ALL STUD TO STUD INTERFACES (STAGGERED WHERE POSSIBLE) SHEARWALL SHEATHING (SIMILAR DETAIL FOR SHEATHING ON INSIDE OF CORNER, REF PLAN)CONTINUOUS SHEARWALLRE: PLANWIND POST @ EVERY END OF SHEARWALL PER SCHED. FLUSH HOLDOWN TO INTERIOR FACE OF STUD @ EXTERIOR WALLS. 2" @ 2X4 EXTERIOR WALLS 4" @ 2X6 EXTERIOR WALLS 6 TYPICAL SHEATHING AND HOLDOWN CONSTRUCTION AT SHEARWALL ENDS AND INTERSECTIONS (PLAN VIEW) SHEARWALL SHEATHING PER PLAN PROVIDE BOUNDARY NAILING PER WALLSHEATHING SCHEDULE 12"10" OR 8"2X BLOCKING CORRIDOR WALL 2X STUDS (MATCH WALL WIDTH)CONTINUOUS SHEARWALLRE: PLANCONTINUOUS SHEARWALL RE: PLAN 0.131"X3" NAILS @ 3" O.C. AT ALL STUD TO STUD INTERFACES (STAGGERED WHERE POSSIBLE) 0.131"X3" NAILS @ 3" O.C. AT ALL STUD TO STUD INTERFACES (STAGGERED WHERE POSSIBLE) SHEARWALL SHEATHING PER PLAN SHEARWALL SHEATHING PARTY WALL WITH 2x4 + 2x6 OR (2) 2x4 WALLS 2X BLOCKING PROVIDE BOUNDARY NAILING PER WALLSHEATHING SCHEDULE PARTY WALL WITH (2) 2x6 WALLS 2X STUDS (MATCH WALL WIDTH) SHEARWALL SHEATHING PER PLAN CORRIDOR WALL 2x6 STUDS SISTERED TO 2x4 STUD @ TRANSITION 0.131"X3" NAILS @ 3" O.C. AT ALL STUD TO STUD INTERFACES (STAGGERED WHERE POSSIBLE)CONTINUOUS SHEARWALLRE: PLAN0.131"X3" NAILS @ 3" O.C. AT ALL STUD TO STUD INTERFACES (STAGGERED WHERE POSSIBLE) A. CONT. SHEARWALL WITH SINGLE INTERSECTING WALL B. CONT. SHEARWALL WITH SINGLE INTERSECTING PARTY WALLS C. CONT. SHEARWALL AT STUD SIZE CHANGE D. TYPICAL HOLDOWN INSTALLATION REQUIREMENTS HD ANCHOR LOCATION MAY VARY UP TO 5% OF WALL LENGTH FROM MIN REQUIRED TO FIT SCHEDULED POST & HOLD DOWN AS SHOWN 13 TYP. BRICK RELIEF DETAILS SCALE: 3/4" = 1'-0" 10 TYPICAL WOOD STAIR FRAMING DETAIL STAIR MIDSPAN SUPPORT WALL (OR BEAM, SIM.) WHERE REQ'D TO REDUCE STRINGER SPAN TO SCHEUDLED MAX RE: ARCHRE: ARCH 2x12 CUT STRINGERS @ 12" O.C. FOR TREAD AND RISER SUPPORT512" MIN THROATON CUT STRINGERS2x SILL PLATE RIPPED TO SIZE RE: SILL & SOLE PLATE ANCHORAGE SCHEDULE STAIR SUPPORT BEAM, RE: PLAN BLOCKING AS REQ'D STRINGER SPACING RE: SCHEDULE STAIR TREAD, RE: ARCH 2x12 CUT STRINGER CLIPPING, RE: SCHEDULE STAIR SUPPORT BEAM, RE: PLAN SCAB MEMBERS RE: SCHEDULE RE: ARCHRE: ARCH 2x SOLE PLATE RIPPED TO SIZE, RE: SILL & SOLE PLATE ANCHORAGE SCHEDULE RE: ARCHRE: ARCH STAIR SUPPORT BEAM, RE: PLAN 4x2 BLOCKING @ 12" O.C. W/ (2) 0.131" x 3" TOENAILS @ EACH END RE: DETAILS FOR ALTERNATE BEARING CONDITIONS FLOOR FRAMING, TYPE AND ORIENTATION MAY VARY, RE: ARCH CLOSED TOE BOARD PER ARCH CLIPPING, RE: SCHEDULE NOTES: 1. 10 PSF MAX DEAD LOAD ALLOWABLE (NO CONCRETE OR GYP TOPPING; 2 PSF MAX FLOORING). CONTACT ISC FOR MAXIMUM SPANS FOR HIGHER DEAD LOADS. 2. A34 CLIPS SCHEDULED ABOVE ARE TO BE INSTALLED USING #9 x 1 3 4" SD SCREWS PER SIMPSON REQUIREMENTS. 3. ALL SCABS SHOULD BE ATTACHED TO STRINGERS USING (2) ~ 0.131" x 3" NAILS @ 3" O.C. 4. ALL CONVENTIONAL LUMBER TO BE #2 SYP. LVL SCABS SHOULD BE 2.0E AND 2,600 Fb, MIN. 5. MULTIPLE MIDSPAN SUPPORT WALLS OR BEAMS MAY BE INSTALLED TO REDUCE THE EFFECTIVE SPAN AS REQUIRED, HOWEVER NO SINGLE SPAN SHOULD EXCEED THE MAXIMUM SPAN LISTED IN THIS SCHEDULE. SPANS ARE MEASURED HORIZONTALLY ONLY. 6. BOTTOM OF STRINGERS MUST BE SHEATHED WITH GYPSUM OR OSB OR BRACED WITH 2x4 SCABS @ 24" O.C. SECTION C-C SECTION D-D SCAB TYPE CONVENTIONAL WOOD-FRAMED STAIR SCHEDULE (2) 2x6 (1) EACH SIDE REQUIRED CLIPPING AT EACH STRINGER END CONNECTION STRINGER SPAN (MAX) (2) 2x12 (1) EACH SIDE STRINGER SPACING DESIGN LIVE LOADING 10'-0" 15'-6" 19'-0"(2) 13 4" x 11 14" LVL (1) EACH SIDE 12" O.C. MAX 24" O.C. MAX 7'-6" (2) 2x6 (1) EACH SIDE (1) A34 (2) A34 (2) A34 (2) A34 11'-0" (2) 2x12 (1) EACH SIDE (3) A34 16'-6" (2) 13 4" x 1114" LVL (1) EACH SIDE (4) A34 PUBLIC (100 PSF) STRINGER SPACING RE: SCHEDULE STAIR SUPPORT BEAM, RE: PLAN WOOD STAIR CONCRETE BEARING CONDITION WOOD STAIR FLOOR BEARING CONDITION D C C SCAB MEMBERS, RE: SCHEDULE CLIPPING, RE: SCHEDULE D STRAP FULL LENGTH OF SHEAR WALL MIN FASTENING TO PREVENT BUCKLING RE: SIMPSON STRONG-TIE COMPANY INC. MIN FASTENERS AND END LENGTH RE: SIMPSON STRONG TIE COMPANY INC. 1. VERTICAL STRAPS AND HOLDDOWNS NOT SHOWN FOR CLARITY, RE: SCHEDULE. 2. INSTALL WOOD STRUCTURAL PANEL SHEATHING CONTINUOUS FULL WALL LENGTH INCLUDING AREAS ABOVE & BELOW OPENING PER SHEARWALL SCHEDULE (NOT SHOWN). 3. STRAPS SHALL BE ATTACHED ON EXTERIOR OF BUILDING, PLACED OVER STRUCTURAL PANEL SHEATHING. FOR DEFLECTION SENSITIVE CLADDING, IT SHALL BE PERMITTED TO ATTACH STRAPS DIRECTLY TO WALL FRAMING AND BLOCKING IF SHEATHING HAS BOUNDARY NAILING FULL LENGTH OF STRAP BLOCKING. 4.STRAPS CAN BE MINIMALLY OFFSET FROM WINDOW OPENING TO ALLOW FOR ATTACHMENT OF WINDOW/TRIM/WALL SHEATHING (MAX.2"). PROVIDE ADD. BLOCKING AS REQUIRED. 9 TYPICAL FORCE TRANSFER AROUND OPENINGS (FTAO) STRAPPING DETAIL ELEVATION VIEW DOUBLE STRAP BLOCKING SECTION A-A MIN FASTENERS AND END LENGTH RE: SIMPSON STRONG TIE COMPANY INC. WALL OPENING HEADER - RE: PLAN FTAO HORIZONTAL STRAPS, RE: SHEARWALL SCHEDULE, INSTALL AS CLOSE AS POSSIBLE TO OPENING ADD ADDITIONAL WINDOW SILL FRAMING AS REQUIRED A A ADD BLOCKING AT STRAP LOCATION AS REQUIRED, (TYP) SINGLE STRAP BLOCKING STRAPS EXT. WSP SHEATHING 2x8 BLOCKING STUD BEYOND EXT. WSP SHEATHING 2x8 BLOCKING STUD BEYOND STRAP TOP OF PLATETOP OF PLATETOP OF PLATE2X4 BOTTOM PLY VERIFY W/ ARCH RIP TO FULL PW WIDTH 2X JUMPER PLATE, WIDTH UP TO 1114" VERIFY W/ ARCH WIDTHS GREATER THAN 111 4" 2X4 TOP PLY 2X6 BOTTOM PLY2X6 BOTTOM PLY 2X4 BOTTOM PLY 2X4 PARTY WALL (PW) 2X6 BOTTOM PLY VERIFY W/ ARCH RIP TO FULL PW WIDTH 2X JUMPER PLATE, WIDTH UP TO 1114" 2X4 BOTTOM PLY 2X4 PARTY WALL (PW) 2X4 PARTY WALL (PW) 2X6 PARTY WALL (PW) 2X6 PARTY WALL (PW)2X6 PARTY WALL (PW) 12 TYPICAL JUMPER PLATE DETAILS 2X JUMPER PLATE, RIP TO REMAINDER OF PW WIDTH Re: PlanTop of Plate11 MAXIMUM CONSTRUCTION MATERIAL STACKING HEIGHT SCALE: 3/4" = 1'-0" STACKED MATERIAL RE: SCHEDHEIGHT VARIESCONSTRUCTION MATERIAL ON FLOORS GYPSUM BOARD 11" PLYWOOD OF OSB ASPHALT SHINGLES CONCRETE BLOCK 15" 8" BRACED ROOF OR FLOOR TRUSSES ROOF OR FLOOR DECKING NOTES: 1.DO NOT EXCEED STACK DEPTH SHOWN IN TABLE UNLESS ALTERNATIVE INFORMATION IS PROVIDED BY THE EOR. LIMITS ARE ONLY APPLICABLE ON FLOOR FRAMING WHERE SELF-LEVELING OR CONCRETE TOPPING IS SCHEDULED TO BE INSTALLED, BUT HAS NOT YET BEEN PLACED. LIMITS ARE ONLY APPLICABLE ON ROOF FRAMING WHERE ROOFING MATERIALS HAS YET TO BE INSTALLED. 2.STACKED MATERIAL STORAGE SHALL NOT EXCEED 7 DAYS IN DURATION. 3.CONSTRUCTION MATERIALS SHALL BE DISTRIBUTED PROPERLY PER BCSI-B4. 4.DO NOT STACK IN AREAS WITHOUT ALL LATERAL RESTRAINT AND CONSTRUCTION PHASE BRACING SECURELY AND PROPERLY IN PLACE AT ALL FRAMING BELOW. 5.NEVER STACK MATERIALS ON UNBRACED TRUSSES. 6.NEVER DROP MATERIAL LOADS FROM ANY HEIGHT. DAMAGE AND FAILURE FROM THE IMPACT IS POSSIBLE EVEN IF THE WEIGHT OF THE MATERIAL IS SMALLER THAN THE SCHEDULED LIMITS. 7.DO NOT ALLOW PERSONNEL IN AREAS UNDER MATERIAL BEING ACTIVELY PLACED. 8.DO NOT ALLOW PERSONNEL ON TOP OF MATERIAL STACKS. 9.STACK MATERIALS FLATWISE, PERPENDICULAR TO AS MANY TRUSSES AS POSSIBLE WITH MIN CLEARANCE AROUND EACH STACK EQUAL TO THE STACK'S FOOTPRINT. 10. NEVER STACK MATERIALS AT THE CENTER OF A SPAN OR ON CANTILEVERED ENDS OF TRUSSES. ON ROOFS 5" 7" 1 BUNDLE N/A MAX MATERIAL STACK HEIGHT 2 BUNDLES FLOOR TRUSS W/ MIN. DOUBLE END VERTICAL RE: PLAN 34" SIMPSON A34 @ EA. END 12' MAX. BRICK HEIGHT 4X12 MIN. BLOCKING, REST FULLY ON 2X TOP PLATE L 5 x 5 x 516" CONTINUOUS, HOLD TIGHT TO SHEATHING PROVIDE GAP FOR WOOD SHRINKAGE & FRAMING GAP TAKE-UP 0.131" X 3" TOE-NAILS @ 4"O.C.1"MIN.TOENAIL ENDS W/ (3) 0.131" X 3" A34 W/ SD 2X4 BLOCKING @ 48" O.C.TOP OF PLATEPERPENDICULAR TRUSS CONDITION PARALLEL TRUSS CONDITION (3) 0.131" X 3" @ LAPPED JOINT 2"MIN1"34" 12' MAX. BRICK HEIGHT 4X12 MIN. BLOCKING, REST FULLY ON BOTTOM CHORD OF CONTINUOUS BEARING TRUSS L 5 x 5 x 516" CONTINUOUS, HOLD TIGHT TO SHEATHING PROVIDE GAP FOR WOOD SHRINKAGE & FRAMING GAP TAKE-UP 1"MIN.2"MIN1"SIMPSON A34 @ EA. END 0.131" X 3" TOENAILS @ 4" O.C. THIS DETAIL IS FOR REFERENCE PURPOSES IF BRICK IS TO BE RELIEVED IN AREAS WHERE IT STACKS TALLER THAN 30'; CONTACT OR BEFORE IMPLEMENTATION OR CONSTRUCTION USING THIS DETIAL (2) ROWS OF 14" Ø X 3 12" SIMPSON SDS SCREWS @ 3" O.C. HOLES ARE TO BE PRE-DRILLED OR PRE-PUNCHED 0.305"ØMAX. (2) ROWS OF 14" Ø X 3 12" SIMPSON SDS SCREWS @ 3" O.C. HOLES ARE TO BE PRE-DRILLED OR PRE-PUNCHED 0.305"ØMAX. THIS DETAIL IS FOR REFERENCE PURPOSES IF BRICK IS TO BE RELIEVED IN AREAS WHERE IT STACKS TALLER THAN 30'; CONTACT OR BEFORE IMPLEMENTATION OR CONSTRUCTION USING THIS DETIAL 1 SHEET NUMBER MAGNOLIA CONDOS 126 TH AND RANGELINE ROAD ISSUE DATE ISSUE TITLE SHEET TITLE DRAWING SCALE PROJECT NUMBER PROJECT NAME & LOCATION 609.004.20H CAD / ENG The words around this title block reflect the values and definition of Integrity Structural Corp. and do not include any notes pertaining to the drawings for this project. For God so loved the world that he gave his one and only Son, that whoever believes in him shall not perish but have eternal life. For God did not send his Son into the world to condemn the world, but to save the world through him. Whoever believes in him is not condemned, but whoever does not believe stands condemned already becauscree en él no es condenado, pero el que no cree ya está condenado por no haber creído en el nombre del Hijo unigénito de Dios. Ésta es la causa de la condenación: que la luz vino al mundo, pero la humanidad prefirió las tinieblas a la luz, porque sus hechos eran perversos. Pues todo el que hace lo malo aborrece la luz, y no se acerca a ella por temor a que sus obras queden al descubierto. En cambio, el que practica la verdad se acerca a la luz, para que se vea claramente que ha hecho sus obras en obedienin the name of God's one and only Son. This is the verdict: Light has come into the world, but men loved darkness instead of light because their deeds were evil. Everyone who does evil hates the light, and will not come into the light for fear that his deeds will be exposed. But whoever lives by the truth comes into the light, so that it may be seen plainly that what he has done has been done through God. (John 3:16-21, NIV). Therefore Jesus said again, "I tell you the truth, I am the gate for the shee CONSTRUCTION@ INTEGRITYSTRUCTURAL.COM 12777 JONES RD., STE 388 HOUSTON, TX 77070 281 894 7099 2020.09.09 PROGRESS SET JT / GD 2020.10.07 BID DOCUMENTS JT / GD 2020.11.11 CONTRACT SET JT / GD 2021.01.06 REVISION #1 JT / GD STANDARD WOOD FRAMING DETAILS 3/4" = 1'-0" S0-3A Powered by TCPDF (www.tcpdf.org) 10/25/21