Loading...
HomeMy WebLinkAboutS0-3B STANDARD WOOD FRAMING DETAILSSHEATHING 2X WALL CONNECTION @ 2X WALL (CAPACITY = 250 LBS) FLUSH MOUNTED #2, (2) 2X12 BLOCKING A34 CLIP TOP AND BOTTOM @ EA. END OF BLOCKING W/ 5D SCREWS 18 TYPICAL INTERIOR BLOCKING DETAILS TOP OF PLATE20 TYPICAL PLATE PENETRATION DETAILS "E""E"TOP OR BTM PLATE (2) CTS218 (TOTAL) WHERE REQUIRED DOUBLE TOP PLATE STUDS @ STANDARD SPACING DOUBLE WALL TOP VIEW (REINF. / PROTECTION NOT SHOWN)"E""E"AIR SPACERE: ARCHPENETRATIONS TOP OR BTM PLATE PLATE PENETRATION SINGLE WALL TOP VIEW (REINF. / PROTECTION NOT SHOWN SIDE VIEW 412" MAX BOTTOM PLATE NONE E > 3/4" NOTE: RE: ARCH/MEP FOR SEALNG & FIRE PROTECTION REQUIREMENTS AT ALL PENETRATIONS WHERE TOP PLATE REINFORCEMENT/ PROTECTION NONE DISTANCE TO NEAREST STUD (MAX)WALLS STD. STUD (2) SIMPSON CTS218 4" ADD'L STUD AS REQUIRED 2" MIN.2" MIN.ADD'L BLOCKING AS REQUIRED 16 GA. NAIL STOP W/ (6) 16d NAILS, (REQUIRED AT ALL EXPOSED SIDES OF WALL W/ CLOF PENETRATION & REINF./ PROTECTION DISTANCE TO NEAREST STUD DISTANCE TO NEAREST STUD PARTIAL PLATE WALLS _ E < 3/4" E > 1 1/2" _ E < 1 1/2" PLATE REINFORCEMENT SCHEDULE SINGLE DOUBLE BY SCHEDULE (ONE SIDE ONLY) "E" LESS THAN 1 1/2") BY SCHEDULE. SPACING APPLIES TOP OF PLATEDECKING SHEARWALL, RE: PLAN DRAG TRUSS BOUNDARY NAILING PER DECKING ATTACH SCHED.FLOOR TRUSS DEPTH(DRAG TRUSS)ATTACHMENT PER SILL & SOLE PLATE NAILING REQUIREMENTS FOR WALL BELOW 9 FLOOR SHEAR DRAG TRUSS REQ'D WHERE THERE IS NO WALL ABOVE FLOOR TRUSS DEPTHFLOOR DECKING SHEARWALL, RE: PLAN FLOOR TRUSS CONTINUOUS SHEAR TRUSS BLOCKING ATTACHMENT PER SILL & SOLE PLATE NAILING REQUIREMENTS FOR WALL BELOW BOUNDARY NAILING PER DECKING ATTACH SCHED. CONT. CMST14 STRAP 10 FLOOR SHEAR BLOCKING REQ'D WHERE THERE IS NO WALL ABOVE TOP OF PLATESHEARWALLS FLOOR TRUSS 2-2X BEARING PLATES SHEARWALL SILL PLATE NAILING TO BE ABOVE RIBBON 2X4 BLOCKING BETWEEN TRUSSES, NAIL TO TOP PLATE PER SILL PLATE NAILING SCHEDULE FOR SHEARWALL BELOW CONT. BOUNDARY NAILING AS PER SCHEDULE FOR SHEARWALL BELOW OSB PANEL FULL DEPTH OF FLOOR TRUSS, ORIENTED HORIZONTAL. NAIL TO EACH TRUSS END @ 6" O.C. IN ADDITION TO BOUNDARY NAILING 12 ALTERNATE FOR SHEAR BLOCKING AT EXTERIOR OSB TOP OF PLATEGAP W/SPLICE EA. FLOOR TYPICAL FLOORS 7 OPTIONAL EXTERIOR WALL FLOOR CAVITY SHEATHING GAP TOP OF PLATERIBBON BLOCKING (WHERE REQUIRED BY FRAMER TO PREVENT BUCKLING DUE TO WOOD SHRINKAGE. MAY NOT BE USED W/ LAPPED PLYWOOD DESIGNS.)TRUSS DEPTHRE. SCHEDULEPROVIDE CB-1 UNDER ROOF LOAD BEARING WALL, EVEN IF WALL IS NON-LOAD BEARING AT FLOORS BELOW. CB-1 TRUSSES SHALL BE DESIGNED W/SAME LOADING PARAMETERS AS FT-1 TRUSSES. 8 TYPICAL CONTINUOUS BEARING TRUSS (CB-1) DETAIL TOP OF PLATETOP OF PLATEFLOOR TRUSS TEMPORARY EXPANSION JOINT @ 80' INTERVALS STUDSTUD AFTER BUILDING IS " CLOSED IN", NAIL FLOOR DECKING AND FILL EXPANSION JOINT WITH WOOD STRIP OR NON-SHRINK GROUT (PROVIDE 18" SPACING AT PANEL ENDS AND EDGES. FLOOR DECKING SILL PLATE 3 4" 12" GAP IN WALL BOTTOM PLATES CROSSING EXPANSION JOINT NOTE 1: INSTALL BOTTOM FILLER PLATE AND SILL SPLICE PLATE AFTER NAILING FLOOR DECKING WHEN BUILDING IS "CLOSED IN". NOTE 1 14 TEMPORARY EXPANSION JOINT FOR FLOOR DECKS 3~16D OR 5~0.131"X3" NAILS 3~16D OR 5~0.131"X3" NAILS PROVIDE 2X4 SCAB ON EACH SIDE OF FLOOR TRUSS WHEN NECESSARY. ATTACH W/ 2~16D OR 3~0.131"X3" NAILS TOP & BOTTOM AT SPANS GREATER THAN 10', BUT LESS THAN 18', PROVIDE A 2X6 STRONGBACK AT MID-SPAN.  AT SPANS GREATER THAN 18' PROVIDE A 2X8 STRONGBACK AT ALL THREE QUARTER POINTS OF THE SPAN. LOCATE STRONGBACKS DIRECTLY ABOVE BOTTOM CHORD AND CONTINUE INTO ALL EXTERIOR OR INTERIOR WALLS AT TRUSS DIRECTION CHANGES AND ATTACH TO LADDER TRUSS AS SHOWN IN DETAILS. OVERLAP STRONGBACK SPLICES 4'-0" MINIMUM NAILED WITH 12~16D OR 18~0.131"X3" NAILS SPACED EVENLY NAIL STRONGBACK TO VERTICAL WEB MEMBERS BOTTOM FLUSH TO BOTTOM CHORD. 13 TYPICAL FLOOR TRUSS STRONGBACK DETAIL 5~0.131"x3" NAILS LADDER TRUSS 1/4 W8X18 HOIST BEAM (U.N.O. IN PLAN) BEAR 3-1/2" EA END ⅊ 12" X 6"X4" W/ (2) 12"Ø X4" H.S. BOND BEAM RE: SPECS. 8" CMU WALL RE: SPECS. FOR REINF. 2" SOAP GROUT SOLID AFTER BEAM INSERTION 17 HOIST BEAM DETAIL @ CMU WALLS TYPICAL ELEVATOR SHAFT 3 TYPICAL ROOF DRAG TRUSS CONNECTION DETAIL TOP OF PLATESHEARWALL TYPE A35 SPACING FASTEN MASTER NLB SPACING NOTES: 1. (2) CLIPS/FASTENERS MIN. PER SHEARWALL WITHIN 24" OF WALL ENDS. 2. FOR DOUBLE SIDED SHEARWALLS (INCLUDING PARTY WALL SHEARWALLS SHARING A DRAG TRUSS) CUT THE SCHEDULED SPACING IN HALF. 3. FRT FRAMING REQUIRES CLIPS/FASTENERS AT 0.9X THE SCHEDULED SPACING. 4. AT NON- LOAD BEARING CONDITIONS WITH NLB FASTENERS A 3/4" MAX. GAP IS PERMISSIBLE BETWEEN THE TOP PLATE AND TRUSS (NOT SHOWN IN DETAIL). 5. 1 1/4" MIN. NLB FASTENER TRUSS PENETRATION. 34" O.C. 60" O.C. 39" O.C. 19" O.C. 13" O.C. 10" O.C. 8" O.C. 7" O.C. 11" O.C. 19" O.C. 13" O.C. 6" O.C. 4" O.C. N / A N / A N / A G1b G2, G3 G4b, G5b W1 W3 W5 W7 W9 SHEARWALL ROOF TRUSS BOUNDARY NAILING RE: DECKING ATTACHMENT SCHEDULE TRUSS ATTACHMENT RE: SCHEDULE (CLIP SHOWN, NLB FASTENER SIMILAR) ROOF DRAG TRUSS REQUIRED ABOVE ALL PARALLEL SHEARWALLS, DESIGNED BY MANUF. FOR THE TOTAL SHEAR CAPACITY OF THE SHEARWALLS IT IS ABOVE (SEE SHEARWALL SHEATHING SCHEDULE ON PLANS) 2x4 BLOCKING @ 6'-0" O.C. EACH SIDE ROOF DECKING ROOF DRAG TRUSS FASTENING SCHEDULE 4 TYPICAL OFFSET ROOF DRAG TRUSS CONNECTION DETAIL TOP OF PLATE2" MIN. 11 1/4" MAX. (2x12) 2X INTERIOR SHEARWALL OFFSET FROM DRAG TRUSS ABOVE 0.131" x 3" NAILS SPACED SAME AS REQUIRED SOLE PLATE NAILING BOUNDARY NAILING RE: DECKING ATTACHMENT SCHEDULE ROOF DRAG TRUSS REQUIRED ABOVE ALL PARALLEL SHEARWALLS, DESIGNED BY MANUF. FOR THE TOTAL SHEAR CAPACITY OF THE SHEARWALLS IT IS ABOVE (SEE SHEARWALL SHEATHING SCHEDULE ON PLANS) ROOF TRUSSES, TYP SHEATHING RE SCHED. 2X4 DIAGONAL BRACE @ APPX 45 DEGREES, ALTERNATE DIRECTION ROOF DECKING TOP OF PLATEH2.5A 4~16D NAILS OR 6~0.131X3" NAILS, TYP 2~16D NAILS OR 3~0.131X3" NAILS TYP. SHEARWALL NAILING, RE PLAN CONTINUOUSLY REPEAT EXAMPLE TRUSS BRACE INSTALLATION SHOWN ABOVE ALONG ENTIRE LENGTH OF ALL PERPENDICULAR SHEARWALLS 2X4 BLOCKING, TYP H2A 4~16D NAILS OR 6~0.131X3" NAILS. TYP 2~16D OR 3~0.131"X3" END NAILS, OTHERWISE: 3~16D OR 4~0.131"X3" TOENAILS, TYP 2X6 BLOCKING, TOENAIL TO TOP PLATE W/ 16D @4" O.C. OR 0.131X3" @3" O.C. 2~16D NAILS OR 3~0.131X3" NAILS, TYP 5 TYPICAL TRUSS BRACING AT PERPENDICULAR SHEARWALLS2 TYPICAL NON BEARING WALL TO TRUSS CONNECTION DETAILS AT BEARING WALLSTOP OF PLATEPARALLEL TRUSS CONDITION PERPENDICULAR TRUSS CONDITION NOTES: 1. INTERIOR WALLS ONLY. 2. WALLS TALLER THAN 10' TO HAVE FASTENER SPACINGS REDUCED TO 4" O.C. 3. 1 1/4" MIN. NLB FASTENER TRUSS PENETRATION. 4. WHEN USING NLB FASTENERS, GAPPING ABOVE NON-LOAD BEARING WALLS SHOULD ONLY BE USED AT THE DISCRETION OF THE CONTRACTOR AND BUILDING OFFICIAL AND TYPICALLY REQUIRES CONSIDERATION OF ASSOCIATED INSTALLATION REQUIREMENTS SUCH AS FLEXIBLE RC AND/OR DRYWALL CLIPS AT CEILING TO WALL INTERFACES. REFERENCE THE SBCA'S REPORT PARTITION SEPARATION PREVENTION AND SOLUTIONS FOR GUIDANCE. ROOF OR FLOOR TRUSS CHORD ORIENTATION MAY VARY DECKING (2) 0.131"x3" END NAILS TYPICAL GAP PERMITTED WITH FASTENMASTER NLB ONLY, (3/4" MAX.) ATTACH BLOCKING TO WALL WITH (2) 0.131"x3" NAILS OR (1) FASTENMASTER NLB CONNECTOR 2X NON LOAD-BEARING WALL ROOF OR FLOOR TRUSS CHORD ORIENTATION MAY VARY DECKING 2x4 BLOCKING @ 6'-0" O.C. MAX. ALONG WALL, (2 LOCATIONS MIN PER WALL WITHIN 24" OF WALL ENDS) 1X TOP PLY PERMITTED AT GAPPED CONDITIONS GAP PERMITTED WITH FASTENMASTER NLB ONLY, (3/4" MAX.) 2X NON LOAD-BEARING WALL 1X TOP PLY PERMITTED AT GAPPED CONDITIONS ATTACH TRUSSES TO WALL WITH (3) 0.131"x3" TOE NAILS OR (1) FASTENMASTER NLB CONNECTOR @ 6'-0" O.C. ALONG WALL, (2 LOCATIONS MIN PER WALL WITHIN 24" OF WALL ENDS) 10'-0" MAX. FOR 3X2 BRACES 5'-0" MAX FOR 4X2 BRACES TOP CHORD FLAT ROOF TRUSS TEMPORARY DIAGONAL BRACING @ EVERY 15 TRUSS SPACES. WEB MEMBER 1 STRONG BACKS @ 10'-0" O.C.RIBBON BOARD PER MANUFACTURER BOTTOM CHORD BOTTOM CHORD TOP CHORD RIBBON BOARD PER MANUFACTURER WEB MEMBER STRONG BACKS @ 10'-0" O.C. TEMPORARY TOP CHORD BRACING. LAP AT LEAST (2) TRUSS SPACES WHERE REQ'D. TEMPORARY TOP CHORD BRACING. LAP AT LEAST (2) TRUSS SPACES WHERE REQ'D. TEMPORARY DIAGONAL BRACING @ EVERY 15 TRUSS SPACES. TYPICAL FLAT ROOF TRUSS BRACING DETAIL (REFER TO BCSI, BUILDING COMPONENT SAFETY INFORMATION, BRACING DETAILS PROVIDED BY TRUSS MANUF. FOR FULL BRACING REQUIREMENTS) 6 TYPICAL EAVE CORNER FRAMING SIMPSON LUS26 HANGER 2X STRUCTURAL FASCIA, NO SPLICES WITHIN 12'-0" OF CORNER. RE: ARCH FOR DEPTH. #2 2X6 MIN. SIMPSON LUS26 HANGER ROOF FRAMING RE: PLAN.ROOF OVERHANG RE: PLAN.,CONTACT ENGR.FOR CONDITIONS GREATER THAN 4'-0"(6) 0.131"Ø X 3" TOTAL EA SIDE NAILS (3) 0.131" X 3" NAILS MIN. TYP. 2X6 NAILER (EA. SIDE) TRIM ENDS NAIL W/(6) 0.131" X 3" AS REQ'D. 2X STRUCTURAL FASCIA, NO SPLICES WITHIN 12'-0" OF CORNER. RE: ARCH FOR DEPTH. #2 2X6 MIN. 1X OVERHANG (MIN) 19 TYPICAL BRACED LOOSE LINTEL CONTACT ENGINEER FOR APPLICABLE LOCATIONS NOTE: 1. THIS DETAIL REQUIRES ARCHING ACTION. BRICK MUST BE INSTALLED IN A RUNNING BOND WITH NO SOFT JOINTS OR DISRUPTIONS. 2. WOOD BEAM DOES NOT SUPPORT BRICK. BRICK MUST BEAR ON LOOSE LINTEL BEARING ON AT LEAST 8" OF BRICK ON EITHER END. BRICK, 39 PSF MAX RE: ARCH.3/8" Ø x 6" LAG BOLTS @ 36" O.C. CENTERED IN 1/2" x 2" VERTICAL LONG SLOTTED HOLES IN BENT PLATE. DO NOT TIGHTEN PAST INITIAL CONTACT. DROP BEAM - RE: PLAN CURVED 3/8" BENT PLATE BRACED LOOSE LINTEL 2"BOLT HEAD WITH OVERSIZED WASHER 14" 5" 4x12 SOLID BLOCKING TYP. GAP BRICK AROUND TO ALLOW FOR DIFFERENTIAL MOVEMENT WEB STIFFENER/ SHEARPLATE BY FABRICATOR THRU BOLT TO BE PROVIDED AFTER SHOP DRAWINGS SUBMITTAL FOR REVIEW PRIOR TO CONSTRUCTION 2"2"DOUBLE STUD EA. SIDE OF BLOCKING RE:ARCH CANOPY & CONNECTIONS BY OTHERS HGA10 CLIP T&B @ EA. END OF BLOCKING, TYP. RE: ARCH 5'-0" MAX RE: ARCH3'-0" - MIN1/2" STEEL PLATE SUBMIT REACTIONS TO E.O.R. PRIOR TO FABRICATION CONNECTIONS & RODS @ 6'-0" MAX 16 TYPICAL STEEL AWNING CONNECTION FLOOR TRUSS, ORIENTATION AND STAGGER MAY VARY WALL BELOW MAX 2 1/2" Ø PENETRATION THROUGH PANEL SINGLE PIECE OF 4-PLY. MIN 19/32" PLYWOOD ATTACHED W/ 0.148"X3" NAILS @ 2" O.C. ALONG ALL FOUR SIDES ONE 20" MIN., OR TWO 10" MIN., FIELD-BUILT BLOCK(S) MUST BE INSTALLED FOR EVERY SCHEDULED TRUSS SHEAR BLOCK NOT INSTALLED#2 SYP BLOCKING CONTINUOUS ON ALL FOUR PANEL EDGES W/ 0.148"X3" NAILS @ 2" O.C. NOTES: 1. OSB IS NOT PERMITTED. 2. AT PARALLEL CONDITIONS CONTINUE SHEAR WALL CONSTRUCTION UP THROUGH FLOOR CAVITY WHERE DRAG LADDER TRUSS IS NOT PROVIDED. 3. WALL PLATE MATERIAL MUST BE SYP. 11 FIELD-BUILT SHEAR BLOCK DETAIL SCALE: 3/4" = 1'-0" TOP VIEW 2X SOLE PLATE FLOOR DECKING FLOOR TRUSS 2-2X BEARING PLATES LOAD BEARING WALL ABOVE TOP OF PLATELOAD BEARINGWALL BELOW ADDITIONAL INTERSTITIAL CRIPPLE STUDS WHERE TRUSSES AND/OR STUDS ARE MISALIGNED BY MORE THAN 3" CLEAR DISTANCE (NOT REQUIRED AT HIGHEST LEVEL) 15 TYPICAL DETAIL FOR INTERSTITIAL FLOOR FRAMING AT COLUMNS 2X SOLE PLATE FLOOR DECKING FLOOR TRUSS 2-2X BEARING PLATES PROVIDE INTERSTITIAL CRIPPLE STUD PACK SIZED TO TO MATCH WIDTH OF COLUMN BELOW. STUD PACK / COLUMN ABOVE STUD PACK / COLUMN BELOW WHERE TRUSSES LAND UNDER COLUMN INSTALL CRIPPLE STUD ON EA SIDE OF TRUSS AS A MINIMUM, NAILED W/ 0.131"X3" @2" O.C. A. CRIPPLE STUD REQUIREMENTS AT SCHEDULED STUD LAYOUTS B. CRIPPLE STUD REQUIREMENTS AT STUD PACKS/COLUMNS 3" MAX W/O CRIPPLE SHOWN ALIGN TRUSS & STUD SPACING BETWEEN LEVELS @48" O.C. 3" MAX W/O CRIPPLE SHOWN SHEET NUMBER MAGNOLIA CONDOS 126 TH AND RANGELINE ROAD ISSUE DATE ISSUE TITLE SHEET TITLE DRAWING SCALE PROJECT NUMBER PROJECT NAME & LOCATION 609.004.20H CAD / ENG The words around this title block reflect the values and definition of Integrity Structural Corp. and do not include any notes pertaining to the drawings for this project. For God so loved the world that he gave his one and only Son, that whoever believes in him shall not perish but have eternal life. For God did not send his Son into the world to condemn the world, but to save the world through him. Whoever believes in him is not condemned, but whoever does not believe stands condemned already becauscree en él no es condenado, pero el que no cree ya está condenado por no haber creído en el nombre del Hijo unigénito de Dios. Ésta es la causa de la condenación: que la luz vino al mundo, pero la humanidad prefirió las tinieblas a la luz, porque sus hechos eran perversos. Pues todo el que hace lo malo aborrece la luz, y no se acerca a ella por temor a que sus obras queden al descubierto. En cambio, el que practica la verdad se acerca a la luz, para que se vea claramente que ha hecho sus obras en obedienin the name of God's one and only Son. This is the verdict: Light has come into the world, but men loved darkness instead of light because their deeds were evil. Everyone who does evil hates the light, and will not come into the light for fear that his deeds will be exposed. But whoever lives by the truth comes into the light, so that it may be seen plainly that what he has done has been done through God. (John 3:16-21, NIV). Therefore Jesus said again, "I tell you the truth, I am the gate for the shee CONSTRUCTION@ INTEGRITYSTRUCTURAL.COM 12777 JONES RD., STE 388 HOUSTON, TX 77070 281 894 7099 2020.09.09 PROGRESS SET JT / GD 2020.10.07 BID DOCUMENTS JT / GD 2020.11.11 CONTRACT SET JT / GD 2021.01.06 REVISION #1 JT / GD STANDARD WOOD FRAMING DETAILS 3/4" = 1'-0" S0-3B Powered by TCPDF (www.tcpdf.org) 10/25/21