Loading...
HomeMy WebLinkAboutSD1-1 FLOOR FRAMING DETAILS4" MAXRe: PLAN & ARCHFIN. FLR.6" MIN. RE: PLAN FOR EXCEPTIONS CONT. #3 #3 W/180°HOOK @18"O.C.EMBEDMENT,RE:SCHEDULEWIDTH RE: SCHED. 4 DROPPED EXT. FOOTING @ CURB SCALE: 3/4" = 1'-0"VARIES,4" MAX.RE: ARCH FOR SLOPE WHERE PRESENT WIDTH RE: SCHED. 5 EXT. FOOTING @OVERHEAD DOOR SCALE: 3/4" = 1'-0"RE:PLANFORM DOOR POCKET PER ARCH VARIES,RE: PLANRE: ARCH FOR SLOPE WHERE PRESENT PAVING BY OTHERS (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN)RE: ARCH4" MAX.WIDTH RE: SCHEDULE EMBEDMENTRE:SCHEDULE3 EXT. FOOTING W/BRICK SCALE: 3/4" = 1'-0" WIDTH RE: SCHEDULE EMBEDMENTRE:SCHEDULECMU RE: SPECS BRICK - RE: ARCH SLAB DEPTHRE: SCHED.8 EXTERIOR GRADE BEAM @ CMU WALL SCALE: 3/4" = 1'-0" 4 1/2" PER ARCH.RE: ARCH3" MAX.(SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) EMBEDMENT,RE:SCHEDULE10'-0" MAX HEIGHT RE: ARCH(SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) RE: PLANFIN. FLR.A SCHEDULE SCALE: 3/4" = 1'-0" 1 EXT. FOOTING @ DROPPED SLAB SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) WIDTH RE: SCHED. 2 INT. FOOTING SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) B TYPICAL CONVENTIONAL EXTERIOR FOOTING CONSTRUCTION DETAIL SCALE: 3/4" = 1'-0" C TYPICAL CONVENTIONAL INTERIOR FOOTING CONSTRUCTION DETAIL SCALE: 3/4" = 1'-0" 2X WALL RE: PLAN ANCHORAGE, RE: SCHEDULE VAPOR RETARDER PER GEOTECH WIDTH RE: SCHED. EMBEDMENT,RE:SCHEDULEFINISHED GRADE RE: CIVIL 8"EXPOSUREFIN. FLOORCL OF FOOTING AND REINFORCING FOOTING REINFORCING RE:SCHEDULE CONTROL JOINTS @ 12' O.C. EA. WAY, RE: SPECS FIRST CONTROL JOINT @ END OF DOWEL, APPROX. 39" FROM SLAB EDGE SLAB DEPTHRE: SCHEDULE2X WALL RE: PLAN ANCHORAGE, RE: SCHEDULE VAPOR RETARDER PER GEOTECH WIDTH RE: SCHED.3" CLR.FIN. FLOORCL OF FOOTING AND REINFORCING EMBEDMENTRE:SCHEDULEFOOTING REINFORCING RE:SCHEDULE COMPACTED BUILDING PAD PER GEOTECHNICAL REPORT SLAB DEPTHRE: SCHEDULE3" CLR. TYP. SLAB REINFORCING RE: SCHEDULE 3" CLR.3" CLR. TYP.1'-4"Vapor Barrier 18"AS REQ'D.2"Clr2" Clr1'-0" #5 @ 8" o.c. EW (Top and Bottom) Hook Ends (Typ) 2 Add'l #5 (Bottom)1'-0"(Verify withElevator Manuf.)Verify sump pit depth and location w/ equip. purchased #5 @ 9" o.c. vertical ea. face (8" Hook) #5 @ 8" o.c. EW (Top and Bottom) Hook Ends (Typ) Provide Grate Per Architect. CMU Wall Re: Specs ELEVATOR PIT DEPTH(VERIFY WITH ELEVATOR MANUF.)Re: Arch. for waterproofing #5@8" o.c. 2'-0"3" CLR.TO HOOK8"Cont. #5 2 x Keyway RE: ELEVATOR MANUF. DRAWINGS FOR ALL RAIL, LADDER, SILL ANGLE, GRATE, ETC. EMBEDS REQ'D. SHORE WALL UNTIL UPPER SLAB IS CURED. WOOD WALL SLAB REINF. RE: SCHED. 6 ELEVATOR PIT SCALE: 3/4" = 1'-0" FIN. FLOOREMBEDMENT,RE:SCHEDULEWIDTH RE: SCHED. #3 BARS @24" O.C. 36" 24"COLD JOINT #3 BARS @24" O.C. 36"24" COLD JOINT. CUT & LAP VAPOR BARRIER AT BOTTOM OF FOOTING TO PREVENT BRIDGING CUT & LAP VAPOR BARRIER AT BOTTOM OF FOOTING TO PREVENT BRIDGING D TYPICAL FOOTING TEE AND CORNER DETAIL NOT TO SCALE (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) FOOTING WIDTH RE: SCHEDULE FOOTING WIDTHRE: SCHEDULETYP. HORIZ. REINFORCING, RE: SCHEDULE FOOTING WIDTHRE: SCHEDULEFOOTING WIDTH RE: SCHEDULE FOOTING CORNER DETAIL FOOTING TEE DETAIL TYP. HORIZ. REINFORCING, RE: SCHEDULE 36" 36" 7 TYP. FOOTING REINFORCEMENT AT H2 HOLDDOWN OR ABOVE SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) RE: CIVILFIN. FLR.EMBEDMENTRE: SCHED.WIDTH RE: SCHED. 9 INT. FOOTING W/CURB SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) CONT. #3 #3 W/180°HOOK @18"O.C.VARIES, RE: PLAN4" MAX.6" MIN. RE: PLAN FOR EXCEPTION SLAB THICKNESSRE: SCHED#3 CONT. NOSING BAR #4 "L" DWLS @ 16" O.C 24" 24" #3 CONT. SLAB REINFORCING RE: SCHEDULE 8"12" COMPACTED BUILDING PAD PER GEOTECHNICAL REPORT CONTROL JOINTS @ 12' O.C. EA. WAY, RE: SPECS EMBEDMENT,RE:SCHEDULE12" DOWELS, 24" LONG @24" O.C. W/ ONE END GREASED 3"2"3" 4" GRANULAR FILL UNDER SLAB PER GEOTECH 4" GRANULAR FILL UNDER SLAB PER GEOTECH RE: ARCH FOR DROP AMOUNT4" MAX.PREFABRICATED STAIR BY OTHERS. ANCHOR DESIGN BY STAIR MANUFACTURER HOLDDOWN FOOTING WIDTH. RE: PLAN FOR HOLDDOWN CALLOUT AND STD. NOTES AND SCHEDULES FOR CORRESPONDING FOOTING SIZES EMBEDMENT,RE:SCHEDULEH2 HOLDDOWN OR GREATER RE: SHEARWALL PLAN AND SHEARWALL NOTES & SCHED. PROVIDE (2) ADD'L #3 HAIRPIN BARS AT H2 OR GREATER HOLDDOWN LOCATIONS. (ONE EACH SIDE, 3" OFFSET) RE: SHEARWALL PLAN FOR LOCATIONS 24" 12" 5" 112" CLR. 112" CLR. 112" CLR. 112" CLR. 12" 5" 11 SLAB SLOPE DETAIL SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN)RE: PLANFIN. FLR.RE: PLANFIN. FLR.SLOPE. RE: A R C H S L A B T H I C K N E S S R E : S C H E D 8"#5 "L" BARS TOP & BOT. 36" 36" #5 "L" BARS TOP & BOT.4" MAX8"112" CLR. 12 TYPICAL FOOTING BEYOND SLAB EDGE DETAIL 3/4" = 1'-0" NOTE: CONT. FOOTING AND SLAB REINF. THRU FOOTING (NOT SHOWN).1'-2"8" Min.RE: PLAN EQUAL EQUAL RE: FOOTING SCHEDULE FOR REINFORCING EMBED BASE PLATE RE: TYP. BASE PLATE DETAILS WOOD COLUMN BASE AT WOOD COLUMNS INSTEAD STEEL OR WOOD COL. RE: PLAN #3 SQ. TIES @ 10" O.C. W/ (3) IN TOP 5" & #5 BARS IN EA CORNER W/ 12" HOOKS AT BOTTOM (CENTER CAGE ON STEEL COLUMN) REBAR CAGE ONLY REQUIRED WHEN STEEL BASEPLATE / COLUMN IS PRESENT EXT. WALL LINE RE: PLANFIN. FLR.DEPTHRE: SCHED.RE: PLAN 3" CLRC OF COLUMN & FOOTINGL #5 @ 16" O.C. IN SAME CELL AS CMU REINF. EMBED INTO FOUNDATION AND LAP 60" MIN WITH TYPICAL CMU REINF.RE: ARCH4" MAXA A RE: PLANFIN. FLR.38" 512"RE: ARCH4" MAXFOOTING CORNER DETAIL STEEL COLUMN BEARING DIRECTLY ON FOUNDATION INSTEAD OF CURB REINFORCED SLAB WITH FOOTINGS BEYOND TERMINATE CONCRETE CURB BEFORE REACHING STEEL COLUMN STUD WALL ON CURB WATERSTOP 2x KEYWAY WATERSTOP 2 2 2 BOTTOM OF INTERSECTING FOOTING RE: SCHEDULE 1 2 TURNDOWN INTERSECTING FOOTINGS ONTO ELEVATOR FOOTING RE: PLAN FOR FOOTING LOCATIONS (4) Add'L #5 (CONT.) 6" MIN. CURB WIDTH CONT. #3 #3 W/180°HOOK @18"O.C.8"4" THICKENED SLAB WHEN INTERSECTING FOOTING IS NOT PRESENT CONT. #5 3" CLR @ INTERSECTING FOOTING 1'-0" CMU Wall Re: Specs WOOD WALL SLAB REINF. RE: SCHED. #3 CONT. NOSING BAR #4 "L" DWLS @ 16" O.C 24" 24"8"WATERSTOP 6" MIN. CURB WIDTH CONT. #3 #3 W/180°HOOK @18"O.C. 4" THICKENED SLAB CONT. #5 FIN. FLR.6A ELEVATOR PIT W/ SLAB @ F.F.E SCALE: 3/4" = 1'-0" FLOOR FRAMING DETAILS 3/4" = 1'-0" SD1-1 SHEET NUMBER MAGNOLIA CONDOS 126 TH AND RANGELINE ROAD ISSUE DATE ISSUE TITLE SHEET TITLE DRAWING SCALE PROJECT NUMBER PROJECT NAME & LOCATION 609.004.20H CAD / ENG The words around this title block reflect the values and definition of Integrity Structural Corp. and do not include any notes pertaining to the drawings for this project. For God so loved the world that he gave his one and only Son, that whoever believes in him shall not perish but have eternal life. For God did not send his Son into the world to condemn the world, but to save the world through him. Whoever believes in him is not condemned, but whoever does not believe stands condemned already becauscree en él no es condenado, pero el que no cree ya está condenado por no haber creído en el nombre del Hijo unigénito de Dios. Ésta es la causa de la condenación: que la luz vino al mundo, pero la humanidad prefirió las tinieblas a la luz, porque sus hechos eran perversos. Pues todo el que hace lo malo aborrece la luz, y no se acerca a ella por temor a que sus obras queden al descubierto. En cambio, el que practica la verdad se acerca a la luz, para que se vea claramente que ha hecho sus obras en obedienin the name of God's one and only Son. This is the verdict: Light has come into the world, but men loved darkness instead of light because their deeds were evil. Everyone who does evil hates the light, and will not come into the light for fear that his deeds will be exposed. But whoever lives by the truth comes into the light, so that it may be seen plainly that what he has done has been done through God. (John 3:16-21, NIV). Therefore Jesus said again, "I tell you the truth, I am the gate for the shee CONSTRUCTION@ INTEGRITYSTRUCTURAL.COM 12777 JONES RD., STE 388 HOUSTON, TX 77070 281 894 7099 2020.09.09 PROGRESS SET JT / GD 2020.10.07 BID DOCUMENTS JT / GD 2020.11.11 CONTRACT SET JT / GD 2021.01.06 REVISION #1 JT / GD 2021.02.26 REVISION #2 JT / GD Powered by TCPDF (www.tcpdf.org) 10/25/21