Loading...
HomeMy WebLinkAboutSD2-1 FLOOR FRAMING DETAILSRE: ARCH.RE: ARCH.TOP OF PLATEDROP BEAM, RE: PLAN 4-0.131"x3" TOE NAILS AT EACH TRUSS SHALLOW FLUSH BEAM, RE: PLAN 2X BLOCKING W/ BOUNDARY NAILING AT ALL BLOCKING AND DECKING INTERFACES (OVERSIZE AS REQUIRED TO LAP) SLOPED TRUSS W/ TOP CHORD BEARING RAILING, CONNECTION AND BLOCKING (NOT SHOWN) BY OTHERS SLOPED TRUSS BALCONY TRUSS DROPPED TOP CHORD PER ARCH. DROPPED TOP CHORD PER ARCH. DROPPED TOP CHORD PER ARCH. STAGGER TRUSSES OVER WALL (OR OPTIONAL KEY TOGETHER) 2X4 RIBBON (HORIZONTAL) SOLID BLOCKING, NAIL EA. PLY TO MATCH SOLE PLATE NAILING ABOVE DROP BEAM CONDITION SHALLOW FLUSH BEAM CONDITION RAILING, CONNECTION AND BLOCKING (NOT SHOWN) BY OTHERS DROPPED TOP CHORD PER ARCH.CONT. 2X4 RIBBON EACH PLY SOLID BLOCKING DEEP FLUSH BEAM, RE: PLAN BALCONY TRUSS DEEP FLUSH BEAM CONDITION RAILING, CONNECTION AND BLOCKING (NOT SHOWN) BY OTHERS DROPPED TOP CHORD PER ARCH. SOLID BLOCKING METAL HANGER SIZED & PROVIDED BY TRUSS MANUFACTURER PARALLEL FLOOR TRUSS CONDITION PERPENDICULAR FLOOR TRUSS CONDITION TOP OF PLATETOP OF PLATE6 SLOPED TRUSS @ BEAM SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) 7 DROPPED TRUSS @ BEARING WALL SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) TOP OF PLATE1 EXT. - PERP. TRUSS SCALE: 3/4" = 1'-0" 2 EXT. - PARALLEL TRUSS SCALE: 3/4" = 1'-0" 3 TRUSS TO FLUSH BEAM SCALE: 3/4" = 1'-0" 4 TRUSS BEARING @ INT. WALL (TRUSS ORIENTATION VARIES, RE:PLAN) SCALE: 3/4" = 1'-0" PERPENDICULAR-PERPENDICULAR CONDITION PERPENDICULAR-PARALLEL CONDITION PARALLEL- PARALLEL CONDITION 5 TRUSS HANGERED TO GIRDER TRUSS SCALE: 3/4" = 1'-0" TOP OF PLATETOP OF PLATETOP OF PLATETOP OF PLATEA TYPICAL EXT. WALL - PERP. TRUSSES SCALE: 3/4" = 1'-0" RE. SCHEDULETOP OF PLATE2X WALL TOPPING + SOUND MAT (NOT SHOWN). CONDITION VARIES, RE: ARCH FLOOR DECKING, RE: SPECS CONT. 2x4 RIBBON WITH (3) 0.131" x 3" @ EACH TRUSS TOENAIL EACH TRUSS TO PLATE W/ (2) 0.131" x 3" EACH FACE RE. SCHEDULELADDER TRUSS / KNEE WALL TRUSS BOUNDARY NAILING ON EXTERIOR SHEARWALLS MATCH SOLE PLATE NAILING FOR WALL BELOW WALL PERPENDICULAR TO TRUSSES WALL PARALLEL TO TRUSSES 2x SOLE PLATE, RE: ATTACHMENT SCHEDULE ON NOTES PAGE FLOOR TRUSS, INSTALL PER BCSI EXTERIOR SHEATHING RE: SHEARWALL PLAN NOTES BOUNDARY NAILING ON EXTERIOR SHEARWALLS 2X WALL FLOOR DECKING, RE: SPECS 2X SOLE PLATE, RE: ATTACHMENT SCHEDULE ON NOTES PAGE TOP OF PLATETOENAIL ENDS W/ (3) 0.131" x 3" BOUNDARY NAILING ON EXTERIOR SHEARWALL WALLS LAPNAIL ENDS W/ (3) 0.131" x 3" (2) 2X TOP PLATE 2X BEARING WALL HEADER OR DROP BEAM INSTEAD WHERE SHOWN ON PLAN STRONGBACK RE:STD DTLS. B TYPICAL EXT. WALL - PARALLEL TRUSSES SCALE: 3/4" = 1'-0" TOPPING + SOUND MAT (NOT SHOWN). CONDITION VARIES, RE: ARCH BOUNDARY NAILING ON EXTERIOR SHEARWALLS 2X4 LAPPED BLOCKING @ 60" O.C. MAX. BETWEEN INTERSECTING WALLS AND/OR STRONGBACKS (2) 2X TOP PLATE 2X BEARING WALL HEADER OR DROP BEAM INSTEAD WHERE SHOWN ON PLAN FLOOR TRUSS, INSTALL PER BCSI EXTERIOR SHEATHING RE: SHEARWALL PLAN NOTES (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) CENTER UNDER WALL ABOVE WHERE PRESENT U.N.O. DEEP FLUSH BEAM HANGERS SIZED AND PROVIDED BY TRUSS MANUFACTURER HANGER SIZED AND PROVIDED BY TRUSS MANUFACTURER GIRDER TRUSS W/ WEB OPENINGS PER MEP PROVIDE SEAT IN TRUSSES, (ALTERNATIVELY TRUSS MAY BE STAGGERED + LAPPED) CONTINUOUS BEARING TRUSS UWA 2X4 RIBBON 2X4 VERTICAL SCAB W/ (2) 0.131"X3" O.C. (PROVIDE CRIPPLE UNDER WALL FOR NAILING TO WHERE TRUSS IS NOT PRESENT) (5) 0.131"X3" RE: TRUSS MANUF. FOR MAX. GAP SOLID BLOCKING, NAIL EA. PLY TO MATCH SOLE PLATE NAILING ABOVE (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN)TOP OF PLATEPROVIDE TOP CHORD SEAT IN TRUSSES AS REQUIRED CENTER UNDER WALL ABOVE WHERE PRESENT U.N.O. RE: TRUSS MANUF. FOR MAX. GAP SHALLOW FLUSH BEAM SOLID BLOCKING, NAIL EA. PLY TO MATCH SOLE PLATE NAILING ABOVE TOP OF PLATERE: ARCH CMU W/ REINF. RE: SPECS CMU BOND BEAM W/ REINF. - RE: SPECS 2x6 W/ 58" X 6" TITEN HD W/ 3"x3"x14" SQUARE WASHERS @24"O.C. IN BOTTOM OF 2" VERT. LONG SLOTTED LEDGER HOLES, DO NOT OVER TIGHTEN 2X BEARING WALL (LEDGER DOES NOT SUPPORT TRUSS VERTICALLY) BOTTOM CHORD BEARING TRUSS W/ 2x6 RIBBON SPACE 10 CMU SLIP CONNECTION TRUSS SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) 11 CMU CONNECTION PARALLEL TRUSS SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) CL OF POST & PLATE HANDRAIL POST, WHERE APPLICABLE, RE:HANDRAIL DESIGNER HANDRAIL POST PLATE, ATTACHED & DESIGNED BY HANDRAIL DESIGNER, TYP ALIGN EDGE OF BALCONY W/2XSCAB, TYP.TOP OF PLATEEDGE OF BALCONY SHEATHING, RE:SPECS FLOOR DECKING, RE:SPECS BALCONY TRUSS, RE:SCHED. ADDITIONAL 2X SCABS ATTACHED TO BOTTOM CHORD AS REQUIRED ATTACH DECKING TO 2X SCABS & TRUSS TOP CHORD W/0.131"X3"NAILS @6"O.C. 2X6 CONT. SCAB ATTACHED TO TOP CHORD &WEBS W/(2)ROWS OF 0.131"X3"NAILS STAGGERED @3"O.C. (MINIMUM BLOCKING, RE:HANDRAIL DESIGNER FOR FINAL DESIGN) BALCONY TRUSS, RE:SCHED. PER HANDRAIL DESIGNER, 4 1/4"MAX. 8 TYP. PARALLEL BALCONY RAILING CONNECTION DETAIL SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN)SHOWER MUD PANRE: ARCH(4" MAX)VERIFY WITH ARCHTOPPING RE: TRUSS LOADING SCHEDULE DECKING TRUSS DEPTHRE: TRUSS LOADINGSCHEDULE & ARCH.12 TRUSS DEPRESSION @ OWNER SHOWER SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) TOP OF PLATE20" TRUSSVERIFY WITH ARCHRE: PLANTOP OF PLATEFLOOR TRUSS WF BEAM RE:PLAN HANGER PROVIDED BY TRUSS MANUFACTURER RE: STANDARD DETAILS BLOCKING RE:STD.DETAILSFLOOR TRUSS WALL ABOVE WHERE INDICATED ON PLAN 13 TYP. TRUSS @ STEEL BEAM SCALE: 3/4" = 1'-0" 14 DETAIL AT STEEL LINTEL AT OVERHEAD DOOR SCALE: 3/4" = 1'-0" TYPICAL TOP OF PLATEBRICK - RE: ARCH OVERHEAD DOOR - RE: ARCH HSS 6 x 4 x 3/8 STUB COLUMN @ 48" O.C. FLUSH TO EXTERIOR OF STEEL BEAM UNIT 2X NAILER 2X EXTERIOR WALL - RE: PLAN UNIT ℄OF STEEL AND LOWER 2X WALL 1/4' WEB STIFFENER EACH SIDE AT BEAM BEARING 1/2" BENT PLATE 10" 6" 1/4"VERIFY WITH ARCH1/4" 1/4" 1/4" HSS BEAM - RE: PLAN (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) TOP OF PLATECMU BOND BEAM W/ REINF. - RE: SPECS A34 W/ SD SCREWS @24"O.C. CMU W/ REINF. RE: SPECS 2x6 W/ 58" x 6" TITEN HD W/ 3"x3"x14" SQUARE WASHERS @24"O.C. IN BOTTOM OF 2" VERT. LONG SLOTTED LEDGER HOLES, DO NOT OVER TIGHTEN HOLD FIRST TRUSS TIGHT TO LEDGER 512" 2 x 6 WALL BEYOND BLOCK UP TO FINISH FLOOR PER ARCH. PROVIDE PAIRS OF SIMPSON H6 TWIST STRAPS ON EACH SIDE OF RAIL POST (4 TOTAL PER POST). WRAP STRAP OVER BUILT UP BLOCKING REQUIRED DECKING INSULATION RE: ARCH DECKING BLOCK UP TO FINISH FLOOR PER ARCH. PROVIDE PAIRS OF SIMPSON H6 TWIST STRAPS ON EACH SIDE OF RAIL POST (4 TOTAL PER POST). WRAP STRAP OVER BUILT UP BLOCKING REQUIRED BLOCK UP TO FINISH FLOOR PER ARCH. PROVIDE PAIRS OF SIMPSON H6 TWIST STRAPS ON EACH SIDE OF RAIL POST (4 TOTAL PER POST). WRAP STRAP OVER BUILT UP BLOCKING REQUIRED 4' MAX. BRICK HEIGHT RE: ARCH L 5 x 5 x 516" CONTINUOUS, HOLD TIGHT TO SHEATHING SIMPSON A34 @ EA. END BOUNDARY NAILING BRICK SUPPORTED ON LINTELS ANCHORED TO FRAMING MUST BE ISOLATED FROM BRICK SUPPORTED AT DIFFERENT ELEVATIONS OR IN A DIFFERENT MANNER. GAP & COURSE ALL BRICK TO ALLOW FOR WOOD SHRINKAGE & DIFFERENTIAL MOVEMENT. LINTEL SUPPORT ANGLED BRICK MUST HAVE 2"X2"(MIN.) WELDED BRICK STOPS @ 48"O.C. BRICK INSTALLED WEIGHT MUST NOT EXCEED 39PSF. (2) ROWS OF 14" Ø X 3 12" SIMPSON SDS SCREWS @ 3" O.C. HOLES ARE TO BE PRE-DRILLED OR PRE-PUNCHED 0.305"ØMAX.RE: ARCH. 4'-0" MAXFINISH FLOOR4X12 SOLID BLOCKING 1" MIN.34" 1"INSULATION PER ARCH BLOCKING BETWEEN STUDSBALCONY TRUSS. HOLD FIRST TRUSS TIGHT TO STUD WALL 15 BRICK RELIEF AT CANTILEVERED STUDS SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) FINISH FLOORSTUD WALL BEYOND LVL STUD PACK BEYOND HIGH HEADER. RE: PLAN FOR SIZE AND ATTACHMENT TO LVL STUD PACK BEYOND CANTILEVERED FLOOR TRUSS LOW HEADER. RE: PLAN FOR SIZE AND ATTACHMENT TO LVL STUD PACK BEYOND 16 SECTION AT CANTILEVERED FLOOR TRUSS SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN) BLOCKING HSS 4 X 4 X 12" STUB COLUMN @48" O.C. CENTERED ON HSS COL. 1/4" NS & FS 1/4" NS & FS 1/4" WF BEAM. RE: PLAN 17 DOUBLE WALL FIRE BARRIER DTL SCALE: 3/4" = 1'-0" (SEE TYPICAL DETAILS FOR INFORMATION NOT SHOWN)TOP OF PLATEDECKING IS CONTINUOUS ACROSS FIRE BARRIER; WHERE TRUSS DEPTH, DIFFERS LAP AND SHIM DECKING TO MAINTAIN CONTINUITY MULTI-PLY TOP CHORD BEARING VERTICAL CHORD TRUSS DROP WALL PLATE HEIGHT FOR DEEPER TOP CHORD TOP CHORD BEARING TRUSS W/ (2) O.131"X3" TOE-NAILS EA SIDE AT PERP CONDITIONS (STAGGER INTERSECTING TRUSSES) (TRUSS ORIENTATIONS VARY, RE PLAN) CONTINUE SHEATHING TO UNDERSIDE OF DECK, NOTCH AROUND TOP CHORD EXTENSION AS REQUIRED AND PROTECT W/ FIRE CAULKING PER ARCH 2X BLOCKING BETWEEN TRUSS TOP CHORDS (NOT SHOWN) HIGH LOAD ALT FRAMER MUST COORDINATE FRAMING CONDITION REQUIRED BY TRUSS MANUFACTURER BASED ON THEIR DESIGN REQUIREMENTS FOR THE PLAN AND SCHEDULED LOADS PRIOR TO CONSTRUCTION #2 2X STUD WALLS BALLOON FRAMED TO/FROM DECKING W/ (2) LAYERS OF GYP MAX, RE ARCH FOR WALL ASSEMBLY, REPEATS ON FLOOR ABOVE WHERE SHOWN ON ARCH. BEAR BEAMS WITHIN WALL, RE TYP BEAM SUPPORT AT FIRE BARRIER DETAIL DECKING IS CONTINUOUS ACROSS FIRE BARRIER; WHERE TRUSS DEPTH, DIFFERS LAP AND SHIM DECKING TO MAINTAIN CONTINUITY MULTI-PLY TOP CHORD BEARING VERTICAL CHORD TRUSS DROP WALL PLATE HEIGHT FOR DEEPER TOP CHORD TOP CHORD BEARING TRUSS W/ (2) O.131"X3" TOE-NAILS EA SIDE AT PERP CONDITIONS (STAGGER INTERSECTING TRUSSES) (TRUSS ORIENTATIONS VARY, RE PLAN) CONTINUE SHEATHING TO UNDERSIDE OF DECK, NOTCH AROUND TOP CHORD EXTENSION AS REQUIRED AND PROTECT W/ FIRE CAULKING PER ARCH 2X BLOCKING BETWEEN TRUSS TOP CHORDS (NOT SHOWN) HIGH LOAD ALT #2 2X STUD WALLS BALLOON FRAMED TO/FROM DECKING W/ (2) LAYERS OF GYP MAX, RE ARCH FOR WALL ASSEMBLY, REPEATS ON FLOOR ABOVE WHERE SHOWN ON ARCH. BEAR BEAMS WITHIN WALL, RE TYP BEAM SUPPORT AT FIRE BARRIER DETAIL DECKING IS CONTINUOUS ACROSS FIRE BARRIER; WHERE TRUSS DEPTH, DIFFERS LAP AND SHIM DECKING TO MAINTAIN CONTINUITY MULTI-PLY TOP CHORD BEARING VERTICAL CHORD TRUSS DROP WALL PLATE HEIGHT FOR DEEPER TOP CHORD TOP CHORD BEARING TRUSS W/ (2) O.131"X3" TOE-NAILS EA SIDE AT PERP CONDITIONS (STAGGER INTERSECTING TRUSSES) (TRUSS ORIENTATIONS VARY, RE PLAN) CONTINUE SHEATHING TO UNDERSIDE OF DECK, NOTCH AROUND TOP CHORD EXTENSION AS REQUIRED AND PROTECT W/ FIRE CAULKING PER ARCH 2X BLOCKING BETWEEN TRUSS TOP CHORDS (NOT SHOWN) HIGH LOAD ALT #2 2X STUD WALLS BALLOON FRAMED TO/FROM DECKING W/ (2) LAYERS OF GYP MAX, RE ARCH FOR WALL ASSEMBLY, REPEATS ON FLOOR ABOVE WHERE SHOWN ON ARCH. BEAR BEAMS WITHIN WALL, RE TYP BEAM SUPPORT AT FIRE BARRIER DETAIL PERPENDICULAR CONDITION PERPENDICULAR CONDITION PARALLEL CONDITION 1 17 TYP. CANT. WOOD FRAMED RAILING DETAIL NOT TO SCALE A35 STRINGER SUPPORT BEAM, TYP. RE: STD. DETAIL (2) FULL DEPTH 2x12 STRINGERS SISTERED ON EACH SIDE OF CUT 2x12 STRINGER RE: WOOD FRAMED STAIR STD. DETAIL 2X BLOCKING BETWEEN STRINGERS ALIGNED WITH STUDS FOR STRAP ATTACHMENT RE: ARCH42" MAX. HEIGHTSHEATHING #2 2x4 @ 16" O.C. ATTACH WITH A34 WITH SD SCREWS @ TOP EACH SIDE 9" MIN.9"MIN.2x4 RIBBON WRAP CS20 OR CSHP20 FROM FACE OF STUD TO BLOCKING DOUBLE 2X PLATE 2x8 MINIMUM BLOCKING ATTACH WITH A34 WITH SD SCREWS TOP & BOTTOM TREAD PER ARCH HANDRAIL & BRACKET BY OTHERS, ATTACH PER MFGR. REQUIREMENTS 48" O.C. MAX NOTE: HANDRAIL & BRACKET PER MANUFACTURER. MUST BE ADEQUATE TO RESIST 200 LBS POINT LOAD OR 50 PLF LIVE LOAD IN ANY DIRECTION H2.5A A34 1 SHEET NUMBER MAGNOLIA CONDOS 126 TH AND RANGELINE ROAD ISSUE DATE ISSUE TITLE SHEET TITLE DRAWING SCALE PROJECT NUMBER PROJECT NAME & LOCATION 609.004.20H CAD / ENG The words around this title block reflect the values and definition of Integrity Structural Corp. and do not include any notes pertaining to the drawings for this project. For God so loved the world that he gave his one and only Son, that whoever believes in him shall not perish but have eternal life. For God did not send his Son into the world to condemn the world, but to save the world through him. Whoever believes in him is not condemned, but whoever does not believe stands condemned already becauscree en él no es condenado, pero el que no cree ya está condenado por no haber creído en el nombre del Hijo unigénito de Dios. Ésta es la causa de la condenación: que la luz vino al mundo, pero la humanidad prefirió las tinieblas a la luz, porque sus hechos eran perversos. Pues todo el que hace lo malo aborrece la luz, y no se acerca a ella por temor a que sus obras queden al descubierto. En cambio, el que practica la verdad se acerca a la luz, para que se vea claramente que ha hecho sus obras en obedienin the name of God's one and only Son. This is the verdict: Light has come into the world, but men loved darkness instead of light because their deeds were evil. Everyone who does evil hates the light, and will not come into the light for fear that his deeds will be exposed. But whoever lives by the truth comes into the light, so that it may be seen plainly that what he has done has been done through God. (John 3:16-21, NIV). Therefore Jesus said again, "I tell you the truth, I am the gate for the shee CONSTRUCTION@ INTEGRITYSTRUCTURAL.COM 12777 JONES RD., STE 388 HOUSTON, TX 77070 281 894 7099 2020.09.09 PROGRESS SET JT / GD 2020.10.07 BID DOCUMENTS JT / GD 2020.11.11 CONTRACT SET JT / GD 2021.01.06 REVISION #1 JT / GD FLOOR FRAMING DETAILS 3/4" = 1'-0" SD2-1 Powered by TCPDF (www.tcpdf.org) 10/25/21