Loading...
HomeMy WebLinkAboutBPW-10-28-82MINUTES OF THE BOARD OF PUBLIC WORKS MEETING OCTOBER 28, 1 982 Mr. Walker called the meeting of the Board of PubliC Works to order at 5:00 P.M. on October 28, 1982, with Board member Fred Swift and Clerk Treasurer, Dottie Hancock preSent. Mr. Walker made a motion to approve SeWer Claims of 10/26/82, pages 1 thru 20 in the amoUnt of $97,938.32. Motion seconded by Mr. Swift and passed unanimously. Mr. Swift made a motion to approve general claims of 10/26/82, pages 1 thru 47 in the amount of $45,450.35. Motion seconded by Mr. Walker and passed unanimously. Mr. Walker made a motion to approve water claims dated 10/27/82, pages 1 thru 38 in the amount of $17,309.01. Motion seconded by Mr. Swift and passed unanimous Mr. Swift made a motion to approve miscellaneous handwritten claims pages 1 thru 5 in a total amount of $2,085,961.43. Motion seconded by Mr. Walker and passed unanimously. Mr. Dougherty appeared before the Board to make a recommendation on the award of a storage barn at the south plant. Mr. Dougherty stated that E.H. Hughes has agreed to pour the concrete floor for the barn Which would save approximately $2300 to $2500 in exchange for storage space in the barn during their construction work. Mr. Dougherty stated Fredericks General Contractors of Markleville was low bidder, met the specifications and recommended acceptance of the bid from Fredericks. Mr. Walker made a motion to approVe the bid of Fredericks General Contractors in the amount of $11,450.00. Motion seconded by Mr. Swift and passed unanimously. There being no further business to come before the meeting, the same was duly adjourned at 5:20 P.M. APPROVED: JANE A REIMAN, MAYOR ATTEST: DOROTHY J HANCOCK, CLERK-TREASURER