Loading...
HomeMy WebLinkAboutResolution_BPW_01-05-22-08 - Over Brook Farms Section 2; Erosion Control, ADA Ramps, Sidewalks; Fischer DevelopmentTo: Board of Public Works and Safety City of Carmel, Indiana From: CITY ENGINEER Date: December 21, 2021 Resolution No: BPW-01-05-22-08 Principal: Fischer Development Company Surety: Westchester Fire Insurance Board Members: I have conducted final inspection at Overbrook Farms Section 2 for the following improvements: ITEM SURETY NUMBER AMOUNT Erosion Control K08885382 $89,220.00 ADA Ramps K09133549 $10,400.00 Sidewalks K08885370 $71,415.00 The above improvements have been inspected and are acceptable to the City of Carmel recommend acceptance of said improvement, subject to the following conditions: 3-year maintenance guarantees to replace the surety listed above must be submitted to replace the performance guarantee. The required maintenance guarantee amounts are as follows: ITEM Erosion Control ADA Ramps Sidewalks AMOUNT $8,922.20 $1,040.00 $7,141.50 APPROVED. 'G / Jeremy Kashman, City Engineer I Be it resolved by the board of Public Works and Safety, City of Carmel, Indiana on this Sth day of January 2022, that the performance guarantee for Overbrook Farms Section 2 listed above is accepted and released by the City of Carmel, Indiana subject to any conditions listed above. Signed: (Presiding Officer) (Member) (Member) Board of Public Works and Safety