HomeMy WebLinkAboutResolution_BPW_01-05-22-09 - Overbrook Farms Section 3; Erosion Control, ADA Ramps, Sidewalks; Fischer DevelopmentTo: Board of Public Works
and Safety
City of Carmel, Indiana
From: CITY ENGINEER
Date: December 21, 2021
Resolution No: BPW-01-05-22-09
Principal: Fischer Development Company
Surety: Westchester Fire Insurance
Board Members:
I have conducted final inspection at Overbrook Farms Section 3 for the following
improvements:
ITEM
SURETY NUMBER
AMOUNT
Erosion Control
K0901889A
$64,272.00
ADA Ramps
K09133574
$5,200.00
Sidewalks
K09018906
$62,663.00
The above improvements have been inspected and are acceptable to the City of Carmel
recommend acceptance of said improvement, subject to the following conditions:
3-year maintenance guarantees to replace the surety listed above must be submitted to
replace the performance guarantee. The required maintenance guarantee amounts are as
follows:
ITEM AMOUNT
Erosion Control $6,427.20
ADA Ramps $520.00
Sidewalks $6,266.30
APPROVED: �G /
Jeremy Kashman, City Engineer
I
Be it resolved by the board of Public Works and Safety, City of Carmel, Indiana on this
Sth day of January 2022, that the performance guarantee for Overbrook Farms Section 3
listed above is accepted and released by the City of Carmel, Indiana subject to any
conditions listed above.
Signed:
(Presiding Officer)
(Member)
(Member)
Board of Public Works and Safety