Loading...
HomeMy WebLinkAboutResolution_BPW_01-05-22-09 - Overbrook Farms Section 3; Erosion Control, ADA Ramps, Sidewalks; Fischer DevelopmentTo: Board of Public Works and Safety City of Carmel, Indiana From: CITY ENGINEER Date: December 21, 2021 Resolution No: BPW-01-05-22-09 Principal: Fischer Development Company Surety: Westchester Fire Insurance Board Members: I have conducted final inspection at Overbrook Farms Section 3 for the following improvements: ITEM SURETY NUMBER AMOUNT Erosion Control K0901889A $64,272.00 ADA Ramps K09133574 $5,200.00 Sidewalks K09018906 $62,663.00 The above improvements have been inspected and are acceptable to the City of Carmel recommend acceptance of said improvement, subject to the following conditions: 3-year maintenance guarantees to replace the surety listed above must be submitted to replace the performance guarantee. The required maintenance guarantee amounts are as follows: ITEM AMOUNT Erosion Control $6,427.20 ADA Ramps $520.00 Sidewalks $6,266.30 APPROVED: �G / Jeremy Kashman, City Engineer I Be it resolved by the board of Public Works and Safety, City of Carmel, Indiana on this Sth day of January 2022, that the performance guarantee for Overbrook Farms Section 3 listed above is accepted and released by the City of Carmel, Indiana subject to any conditions listed above. Signed: (Presiding Officer) (Member) (Member) Board of Public Works and Safety