HomeMy WebLinkAboutVWC CONV STORE6 A1.5 10-14-2021I
I
IREVISIONS:DRAWING COMPLETION DATE:4820 Buttonwood CrescentARCHITECT AIAGORDON CLARKIndianapolis, Indiana 46228Phone: 317 255-2546317 252-5573Fax: GClark4820@aol.comCONVENIENCE STORE / FOOD MARTVILLAGE OF WEST CLAYCARMEL, INDIANASOUTHWEST CORNER OFHARLESTON STREET AND TOWNE ROADOCTOBER 14, 2021
FOR PERMITTING AND CONSTRUCTIONSCALE: 1/4" = 1'-0"
ROOF PLAN
FIRESTONE TPO MECHANICALLY
ADHERED ROOFING OR EQUAL
ALUMINUM WALKABLE
EQUIPMENT DECK
SLOPE MIN. 1 : 12SLOPE MIN. 1 : 12ROOF EQUIPMENT SCREENING
SEE DETAILS
ROOF EQUIPMENT SCREENING
SEE DETAILS
GATE BY ROOF SCREENING
MANUFACTURER
GATE BY ROOF SCREENING
MANUFACTURER
5'-0" WIDE
5'-0" WIDE
TPO ROOFING GENERAL NOTES:
MISCELLANEOUS:
Any additional work such as changes to specified materials, applications or
processes, or other architectural features requiring decisions and not certified
by Gordon Clark must be promptly proposed by letter or email
(gclark4820@aol.com).
ROOFING MATERIAL:
Proposed manufacturer: Firestone UltraPly TPO Membrane, mechanically
attached to steel deck.
ROOF SCUPPERS:
Strictly follow drawings and recommendations by Firestone TPO thru-wall
Platinum TPO Coated Metal Scuppers.
REQUIREMENTS:
Provide a minimum 1: 12 roof slope.
Steel deck shall be a minimum 22 ga. Thickness.
Fastener Type: Firestone Heavy Duty Plus
Insulation Adhesive: Spray R insulation adhesive. Verify if steel deck must be
cleaned to meet Firestone requirements.
Adhesive Attachment: Full Application I.S.O. Spray S Insulation Adhesive.
Membrane Requirement: UltraPly Platinum TPO. Thickness 0.080”.
Seaming Requirement: Contractor’s option as long as it meets Firestone
standards.
Membrane Attachment: Maximum 12 ft. row spacing, fasteners spaced
maximum 6 o.c.
Edge Metal System: Firestone Coping System or as recommended otherwise
by Firestone.
EDGE OF ROOFING: CANT STRIP AS APPROVED BY FIRESTONE TPOEDGE OF ROOFING: CANT STRIP AS APPROVED BY FIRESTONE TPOEDGE OF ROOFING: CANT STRIP AS APPROVED BY FIRESTONE TPOEDGE OF ROOFING: CANT STRIP AS APPROVED BY FIRESTONE TPO
1
A3.1
1
A3.1
1
A3.2
A3.3
1
A3.5
1
A3.5
1
1
A3.4
1
A3.4
A3.4
A3.4
2
2
1 1
A3.1
1
A3.2 A3.3 A3.4
1
A1.5