HomeMy WebLinkAboutVWC CONV STORE14 A3.5 10-14-2021I
I
IREVISIONS:DRAWING COMPLETION DATE:4820 Buttonwood CrescentARCHITECT AIAGORDON CLARKIndianapolis, Indiana 46228Phone: 317 255-2546317 252-5573Fax: GClark4820@aol.comCONVENIENCE STORE / FOOD MARTVILLAGE OF WEST CLAYCARMEL, INDIANASOUTHWEST CORNER OFHARLESTON STREET AND TOWNE ROADOCTOBER 14, 2021
FOR PERMITTING AND CONSTRUCTIONNOTE:
THIS COOLER SYSTEM SHALL BE A PRE-ENGINEERED
UNIT FULLY OPERATIONAL. IT SHALL BE INSTALLED
STRICTLY ACCORDING TO MANUFACTURER'S WRITTEN
INSTRUCTIONS. INSTALLATION SHALL PREFERABLY BE
BY THE MANUFACTURER'S SERVICE REPRESENTATIVES.
THIS SHALL MEET ALL STATE AND LOCAL BUILING
CODES. CONSULT ARCHITECT WITH ANY QUESTIONS
OR UNUSUAL CONDITIONS ENCOUNTERED.
THE BASIS OF DESIGN IS "U.S. COOLER COMPANY"
2"x6" REDWOOD
(THERMAL-BREAK;
AROUND PERIMETER
AND DIVIDING WALLS)
VINYL SCREEDING
OR 2"x2" ALUM. ANGLE
6 MIL. VAPOR BARRIER
TAPE ALL JOINTS
COOLER WALL PANEL
4" CONCRETE SLAB
4" COMPACTED FILL
4" INSULATION OR COOLER FLOOR
PROVIDED BY COOLER MFGR.
TYPICAL EXTERIOR WALL
SEE OTHER DETAILS
SCALE: 1" = 1'-0"
1 SECTION THRU COOLER
OPEN-WEB STEEL JOISTS 24" O.C.
SEE OTHER DETAILS AND SPECIFICATIONS
UNISTRUT HANGERS FOR ALL BULKHEADS
3 5/8" STEEL STUDS 24" O.C.
5/8" DRYWALL SURFACE
SUSPENDED ACOUSTIC CEILING AT 10'-0" AFF
3 5/8" STEEL STUDS 24" O.C.
5/8" DRYWALL SURFACE
TYPICAL BULKHEAD
WALK-IN COOLER SPECIFICATIONS:
Refrigeration
A) Walk-in Refrigerator and Freezer Construction
1) General: Each panel shall consist of inner and outer metal skins, a 4” insulation
core, and be equipped with cam-action locking devices. The locking devices
shall be operable from inside the walk-in. Construction shall be as approved by
the NSF International and shall bear the NSF® Seal of Approval. All panels
shall be connected to one another by placing the tongue of the insulation core
of one panel into the groove of the core insulation of the adjacent panel. The
resultant tongue and groove joint shall be sealed at both sides by double
barreled NSF® approved gaskets. In order to avoid future swelling and mold
formation, no wood shall be permitted in the manufacture of the tongue and
groove panel profile.
(a) Wall Panels: Panel insulation shall be 4” thick, high quality, extruded
polystyrene or foamed-in-place polyurethane, modular panels joined by
not less than three (3) cam-lock devices; gasket to seal between panels;
R-28 or greater for refrigerators and R-32 or greater for freezers.
(b) Ceiling: Panel insulation shall be 4” thick, high quality, extruded
polystyrene or foamed-in-place polyurethane, modular panels joined by
not less than three (3) cam-lock devices; gasket to seal between panels;
R-28 or greater for refrigerators and R-32 or greater for freezers.
(a) Sloped Roof Package: When specified. For use on walk-ins
installed outdoors. May be required at certain snow loads. In order
to form a sloped roof profile, suitable quantities of sloped foam shall
be provided. The foam shall be cut in a manner that upon
installation, a ¼”:1’ slope is obtained. The membrane roof shall be
increased in size appropriately, in order to provide the additional
material required to properly cover the resultant profile.
(b) Roof panels shall be rated to withstand up to 90 mph winds.
(c) Finishes:
(i) Exterior Finishes:
(a) 26 gauge tan stucco embossed galvanized steel
(ii) Interior Finishes
(a) Wall Panels:
i. 26 gauge stucco embossed galvalume
(b) Ceiling Panels:
i. 26 gauge stucco embossed galvalume
(c) Floors:
i. 22 gauge smooth stainless steel
(d) Panel Dimensions: As required for layout.
2) Doors: R-25 or greater for refrigerators; R-32 or greater for freezers. Door shall
be flush mounted, positioned and hinged; provided with suitable sweep and
magnetic gaskets, door closer, one pre-wired vapor proof light fixture, light
switch with pilot light, dial thermometer, manual internal lock override, chrome
plated cam lift hinges, chrome plated door latches with strike.
(i) Outdoor Units: Doors on outdoor walk-ins shall have weather protected
light switch and door drip cap.
(ii) Freezer Doors: Freezer doors shall be identical to cooler doors, but
with the addition of UL approved heater wire on all four sides. Freezer
doors shall include a heated pressure relief port in the adjacent panel.
(b) Thermometer: See item specification for thermometers required for this
project: Thermometer installed flush-mount on hinge side of door panel.
(c) Digital Thermometer (optional): 3” round digital thermometer with probe,
installed flush-mount on hinge side of door panel.
(d) Digital Thermometer with Alarm (optional): Specifications available.
3) Pressure Relief Port: Provide heated relief port in freezers.
4) Lights: Per owner’s requirements.
(a) Fluorescent: 4’ vapor proof; optional per customer specification.
(b) Incandescent: Single bulb, vapor proof; installed on door panel.
(c) LED: Single bulb or 4’ vapor proof; optional per customer specification.
5) Installation: Dealer to install walk-in units.
(a) Drawings and Instructions: Manufacturer shall supply a set of installation
instructions and lay-out drawing. All panels shall have panel identification
corresponding with the lay-out drawing to facilitate rapid and accurate field
erection.
B) Refrigeration System: Complete operating system consisting of a condensing unit
and a evaporator coil.
1) Condensing Unit:
General: Condenser fan motors of under 1 h.p. must use electronically commutated
(EC) motors or permanent split capacitator-type (PSP) motors; splash lubrication
system using Mobil EAL Arctic 22 polyester synthetic refrigeration oil; oil sight glass;
removable oil drain plug; label indicating oil used;
(a) high/low pressure control; suction line filter; suction and discharge service
valves and copper/brass vibration isolators; receiver with fusible plug or
relief valve; liquid line shut-off valve; sight glass; molecular sieve filter
dryer; main power supply fused disconnect switch
(b) Outdoor: Weather proof housing; crank case heater and low ambient
temperature controls required to insure proper and efficient operation; fan
cycling controls where ambient temperatures do not fall below -15°; head
master valve and oversized, heated, insulated receiver and lines where
ambient temperatures fall below -15°F.
2) Evaporator Coil: Forced convection style; match to condensing unit and
suspend with air discharged parallel to the ceiling; lifetime sealed motors with
inherent motor protection; evaporator fan motors of under 1 hp and less than
460 volts must use electronically commutated (EC) motors; enclose coil section
and fans within aluminum housing
(a) Refrigerator: Air defrost
(b) Freezer and Low Temperature Refrigerator: Electric heater and controls
for positive automatic defrost
(c) Installation: Hang using plastic or nylon fasteners; spread coil weight
evenly over ceiling panels; support long span ceiling panels as required.
STEEL FINAL DESIGN SHALL BE ON A DESIGN/BUILD BASIS
4"x4"x3/8" ANGLE FOR SHEAR TRANSFER
AND STEEL DECK SUPPORT
ANGLE SHALL FOLLOW ROOF SLOPEBOND BEAM HEIGHT
VARIES WITH ROOF
SLOPE
HORIZONTAL REINFORCING
EVERY 2'-0" O.C.
2" AIR SPACE
4" CONCRETE FLOOR SLAB
SEE SPECS. AND OTHER DETAILS
TOP OF
MASONRY
16'-0" AFF
TOP OF
INTERMEDIATE BOND
BEAM 10'-0" AFFTO DO
A3.5
A3.5
THIS IS TYPICAL
ON ENTIRE PERIMETER
OF BUILDING MASONRY