Loading...
HomeMy WebLinkAboutVWC CONV STORE18 A4.4 10-14-2021I I IREVISIONS:DRAWING COMPLETION DATE:4820 Buttonwood CrescentARCHITECT AIAGORDON CLARKIndianapolis, Indiana 46228Phone: 317 255-2546317 252-5573Fax: GClark4820@aol.comCONVENIENCE STORE / FOOD MARTVILLAGE OF WEST CLAYCARMEL, INDIANASOUTHWEST CORNER OFHARLESTON STREET AND TOWNE ROADOCTOBER 14, 2021 FOR PERMITTING AND CONSTRUCTIONA. Deliver materials to the project site clearly marked for proper identification. B. Receive, handle and store materials in conformance with the manufacturers printed instructions. 1. 2. as beams or trusses. Position bundles of tubing parallel to the slope of the roof and block prior to opening to prevent the tubing from rolling down the roof slope when unbundled. PART 2 - PRODUCTS 2.1 PERFORMANCE REQUIREMENTS A. Design Loads: Comply with Building Code for site location and building height. 1. 2. Design to resist ASCE 7 - Minimum Design Loads for Buildings and Other Structures, using the latest published ASCE version. Design all materials, assembly and attachments to resist snow, wind, suction and uplift loading at any point without damage or permanent set. B. Structural Design: Prepare structural design calculations for screen framing and attachment to structure including reactions at base supports for verification of roof structure by Architect. C. All welds to be performed by an AWS certified welder. Valid certification to be provided. 2.2 MANUFACTURERS A. Proposed Manufacturer: RoofScreen Mfg., which is located at: 347 Coral St.; Santa Cruz, CA 95060; Toll Free Tel: 866-766- 3727; Tel: 831-421-9230; Fax: 866-253-0738; Email: request info (info@roofscreen.com); Web: www.roofscreen.com. 2.3 FABRICATION A. Fit and shop assemble items in largest practical sections, for delivery to site. B. Fabricate items with joints tightly fitted and secured. C. Supply components required for anchorage of fabrications. Fabricate anchors and related components of same material and finish as fabrication, except where specifically noted otherwise. D. Fabricate system components so that portions of screen can be dismantled for repairs to equipment being screened and for future roof replacement. E. Trim and Closures: Fabricated from 24 gauge metal and finished with the manufacturer’s standard coating system. PART 3 - EXECUTION 3.1 EXAMINATION A. If preparation is the responsibility of another installer, notify Architect of unsatisfactory preparation before proceeding. B. Do not begin installation until conditions have been properly prepared. 3.2 INSTALLATION A. B. Install in accordance with manufacturer's instructions. Install components plumb and level, accurately fitted, free from distortion or defects. C. Anchor fabrications to structure as indicated. D. Separate dissimilar metals and use gasketed fasteners, isolation shim, or isolation tape to eliminate possibility of corrosive or electrolytic action between metals. E. Exercise care when installing components so as not to damage finish surfaces. Touch up as required to repair damaged finishes. F.Install flashing boots at base supports as required to provide a watertight connection. Install as recommended by the roof membrane manufacturer. G. Remove all protective masking from material immediately after installation. 3.3 CLEANING AND PROTECTION A. Replace metal wall panels and framing members that have been damaged or have deteriorated beyond successful repair by finish touchup or similar minor repair procedures. A. Stand-alone roof equipment screens and supporting steel framework. Screens shall be designed to attach to the roof structure and not the equipment being screened. B. Roof screen accessories. 1.2 RELATED SECTIONS A. Roof Top HVAC Equipment. 1.3 COORDINATION A. Coordinate Work with other operations and installation of roofing materials to avoid damage to installed insulation and membrane materials. 1.4 ACTION SUBMITTALS A. Product Data: Manufacturer's data sheets on each product to be used, including: 1. 2. 3. Preparation instructions and recommendations. Storage and handling requirements and recommendations. Installation methods. B. Shop Drawings: Layout and erection drawings showing typical cross sections and dimensioned locations of all frames and base supports. Include erection drawings, elevations, and details where applicable. Indicate welded connections using standard AWS A2.4 welding symbols. Indicate net weld lengths. 1.5 INFORMATIONAL SUBMITTALS A. Design Calculations: 3 copies of structural design calculations for structural components and components resisting wind loads with seal and signature of professional engineer licensed in the State of Indiana B. Manufacturer's Certificates: Certify products meet or exceed specified requirements. C. Warranties: 3 signed copies. 1.6 DELIVERY, STORAGE, AND HANDLING ROOF SCREENS: A4.4