HomeMy WebLinkAboutVWC CONV STORE22 P1.1 10-14-2021I
I
IREVISIONS:DRAWING COMPLETION DATE:4820 Buttonwood CrescentARCHITECT AIAGORDON CLARKIndianapolis, Indiana 46228Phone: 317 255-2546317 252-5573Fax: GClark4820@aol.comCONVENIENCE STORE / FOOD MARTVILLAGE OF WEST CLAYCARMEL, INDIANASOUTHWEST CORNER OFHARLESTON STREET AND TOWNE ROADOCTOBER 14, 2021
FOR PERMITTING AND CONSTRUCTION6" TO PUBLIC SEWER
BACKFLOW PREVENTER
BUILDING CLEAN OUT
HAND SINK
HAND SINK
4"
2"
ADA WC
ADA WC
ADA LAV
ADA LAV
ADA UR
C.O.
2"
2"
2"
2"
FD
FD
4"
4"
2"
ENDURA XL100
M RATED GREASE
INTERCEPTOR BELOW
SLAB
3"
3"
FD
2"
2"
3"
3 COMPARTMENT
COMMERCIAL SS SINK
MOP SINK
ELECTRIC WATER HEATER
ABOVE ON STEEL RACK
3"
3"
SCALE: 1/4" = 1'-0"
SANITARY SEWER PLAN
FLOOR SINK FOR BEVERAGE
DISPENSER.
VERIFY LOCATION WITH
OWNER PRIOR TO INSTALLATION.
FLOOR SINK FOR
ICE MACHINE.
VERIFY LOCATION WITH
OWNER PRIOR TO INSTALLATION.
2"2"
2"
4"4"
4"
4"
4"
CONDENSATE FOR FREEZER
COMPRESSOR
PLUMBING – GENERAL NOTES AND SPECIFICATIONS:
PLUMBING CONTRACTOR SHALL CONFIRM SIZES OR ESTABLISH SIZES OF
WASTE, VENT AND SUPPLY AS REQUIRED TO MAKE A COMPLETE AND WORKING
SYSTEM.
THE SCOPE OF THE PLUMBING WORK INCLUDES FURNISHING, INSTALLING
TESTING AND WARRANTY OF ALL PLUMBING WORK SHOWN ON THE PLUMBING
DRAWINGS.
THE PLUMBING CONTRACTOR ACKNOWLEDGES THAT HE IS AWARE THAT
PLUMBING DRAWINGS ARE SCHEMATIC IN NATURE AND DO NOT SHOW ALL
EQUIPMENT OR FITTINGS REQUIRED. LOCATIONS ARE DIAGRAMMATIC.
PLUMBING CONTRACTOR SHALL ADJUST LOCATION OF PIPING AS REQUIRED.
CONFIRM DETAILED LOCATIONS WITH OWNER IF CRITICAL.
THIS PROJECT SHALL BE COMPLETE, OPERATIONAL AND MEET CURRENT STATE
AND LOCAL CODES AND ORDINANCES IN EVERY WAY. THE CURRENT CODE IS
THE 2012 INDIANA PLUMBING CODE (2006 INTERNATIONAL PLUMBING CODE
WITH 2012 INDIANA AMENDMENTS)
COORDINATE WORK WITH OTHER TRADES AND CONFIRM THAT CLEARANCES
AND FITTING REQUIREMENTS ARE KEPT.
MATERIALS AND WORKMANSHIP:
ALL MATERIALS AND EQUIPMENT SHALL BE NEW AND FIRST QUALITY.
PROVIDE ALL NECESSARY CLIPS, HANGERS, FASTENERS, AND OTHER DEVICES
REQUIRED FOR A COMPLETE JOB.
ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND SUPPORTED IN A
FIRST-CLASS AND WORKMANLIKE MANNER BY MECHANICS SKILLED IN THEIR
PARTICULAR TRADES. A LICENSED PLUMBING CONTRACTOR SHALL PERFORM
WORK.
SANITARY SEWER SYSTEMS:
PROVIDE CLEANOUTS WHERE REQUIRED, WHETHER SHOWN ON DRAWINGS OR
NOT.
PIPE IN GRADE BELOW FLOOR SLABS SHALL BE RIGID PVC SCHEDULE 40, TYPE
1, GRADE 1, COMPLYING WITH ASTM D2665 AND D-1784.
PRESSURE TEST AND REPLACE DEFECTIVE MATERIALS AND CONNECTIONS.
WASTE AND VENTS:
SOIL, WASTE AND VENT LINES SHALL BE PVC SCHEDULE 40 ASTM D1785 WITH
ASTM D2665 DWV SOCKET FITTINGS; OR, SERVICE WEIGHT CAST IRON, OR AS
REQUIRED BY LOCAL CODES. SLOPE WASTE PIPING UNIFORMLY 1/8" PER FOOT
MINIMUM. SLOPE VENT PIPING TO PREVENT CONDENSATION FROM SYSTEM.
TEST SOIL, WASTE, AND VENT PIPING SHALL BE TESTED TO A MINIMUM 10 FEET
OF HEAD MAINTAINED FOR A MINIMUM 15 MINUTES. REPLACE DEFECTIVE PIPE
AND JOINTS AT NO ADDITIONAL COST TO OWNER.
FLOOR DRAINS SHALL BE EQUAL TO SMITH 2010-A.
FLOOR CLEANOUTS SHALL BE EQUAL TO SMITH 4021 OR 4021Y.
WALL CLEANOUTS SHALL BE EQUAL TO SMITH 4710.
PROVIDE AND INSTALL ALL REQUIRED OR SHOWN BACK-FLOW PREVENTERS.
DOMESTIC WATER SYSTEM:
WATER SUPPLY LINES SHALL BE OF TYPE "L" OR "K" COPPER AS REQUIRED BY
LOCAL PLUMBING CODES. ALL WATER SUPPLY LINES SHALL BE RUN UNDER
FLOOR SLAB AND UP PLUMBING WALLS. SIZE WATER SUPPLY AS REQUIRED
FOR BUILDING USAGE.
BACKFLOW PREVENTERS SHALL BE INSTALLED IF REQUIRED BY STATE AND
LOCAL ORDINANCES.
INSTALL WARM WATER LINES ON WARM SIDE OF CEILING INSULATION.
BACKFLOW PREVENTERS SHALL BE INSTALLED IF REQUIRED BY STATE AND
LOCAL ORDINANCES.
INSTALL WARM WATER LINES ON WARM SIDE OF CEILING INSULATION.
PRESSURE TEST TO 50 PSIG ABOVE OPERATING PRESSURE (125 PSIG MIN.) AND
MAINTAIN PRESSURE FOR 15 MINUTES MINIMUM WITH NO PRESSURE LOSS.
REPLACE DEFECTIVE MATERIALS AND CONNECTIONS. CLEAN, FLUSH AND
DISINFECT ALL WATER PIPING IN ACCORDANCE WITH AWWA C601.
INSTALL PID RATED SHOCK ABSORBERS IN COLD WATER LINES WHERE
REQUIRED.
ALL WATER SUPPLY (BOTH HOT AND COLD) LINES ABOVE FLOOR SLAB SHALL BE
INSULATED WITH 3/4" ARMA FLEX TYPE INSULATION.
INSTALL DIELECTRIC UNIONS WHERE DISSIMILAR METALS ARE CONNECTED.
PLUMBING FIXTURES:
FIXTURES SHALL BE COMPLETE WHEN FULLY INSTALLED, INCLUDING TRIM,
VALVES, SUPPLIES AND ESCUTCHEONS.
TRIM SHALL BE BRASS CHROME PLATED; FIXTURES SHALL BE WHITE, UNLESS
OTHERWISE NOTED.
SEAL CRACKS AROUND EACH FIXTURE AT WALL AND FLOOR WITH
PERMANENTLY PLIABLE WHITE SILICONE SEALANT.
STRICTLY FOLLOW ACCESSIBILITY STANDARDS NOTED BELOW.
DOMESTIC WATER HEATING:
PROVIDE GAS FIRED STORAGE WATER HEATER COMPLETE WITH POWER
BURNER OR ELECTRIC WATER HEATER TO SIZE REQUIRED. TANK SHALL BE
CONSTRUCTED IN ACCORDANCE WITH ASME CODE, STAMPED AND TESTED.
TANK SHALL BE INSULATED.
THE COMPLETE WATER HEATER SHALL BE LISTED BY UL, WITH LABEL
ATTACHED.
VENTING FOR GAS WATER HEATERS: UL APPROVED TYPE B DOUBLE-WALL GAS
VENT PIPING. VENT EXTENDED 3 FEET ABOVE THE ROOF, MINIMUM TWO FEET
HIGHER THAN ANY PORTION OF BUILDING WITHIN 10 FEET.
ACCESSIBILITY STANDARDS:
STRICTLY COMPLY WITH THE REQUIREMENTS OF UNIFORM FEDERAL
ACCESSIBILITY STANDARDS (UFAS), THE ADA, AND IBC, INDIANA CODE CHAPTER
11. PROVIDE RAISED SEAT FOR THE ACCESSIBLE WATER CLOSETS, PROVIDE
FLUSH ON ACCESS SIDE OF WC'S, TRAP TIGHT TO THE WALL UNDER
LAVATORIES, INSULATE ALL WASTE AND WATER PIPING BELOW LAVATORIES, AS
WELL AS ALL OTHER ADA REQUIREMENTS.
THE ARCHITECT SHALL BE NOTIFIED IMMEDIATELY IF REQUIRED DIMENSIONS,
CLEARANCES, OR STRUCTURAL CONDITIONS EXIST THAT COULD PREVENT THE
ABOVE ACCESSIBILITY REQUIREMENTS FROM BEING STRICTLY FOLLOWED.
TESTING:
ALL PIPES SHALL BE PRESSURE TESTED PER STANDARD PRACTICE. REPLACE
ALL DEFECTIVE LINES AND CONNECTIONS AT NO ADDITIONAL COST TO OWNER.
MANUALS:
TWO COPIES OF OPERATION AND MAINTENANCE MANUALS FOR MATERIALS
INSTALLED PER WORK OF THIS SECTION SHALL BE DELIVERED TO OWNER
PRIOR TO ACCEPTANCE OF THESE SPACES FOR OCCUPANCY.
BACKFLOW PREVENTION DEVICES FOR BEVERAGE STATIONS:
THE CONTRACT DOCUMENTS CONSIST OF THE DRAWINGS AND SPECIFICATIONS ON THE
DRAWINGS. THE INTENT OF THE CONTRACT DOCUMENTS IS TO INCLUDE ITEMS NECESSARY
FOR THE PROPER EXECUTION OF THE WORK.
NEW CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE CITY, STATE AND LOCAL BUILDING
CODES AND NFPA CODES FOR THIS CLASS OF WORK.
REQUIREMENTS:
ALL WORK RELATED TO THE BEVERAGE DISPENSERS AND BEVERAGE AREAS SHALL BE
PROTECTED BY THE PROVISIONS OF THE INDIANA PLUMBING CODE 2012 EDITION SECTIONS
608.16.1 AND 608.16.10.
CONNECTIONS TO POTABLE WATER SYSTEM:
SPECIFICALLY BEVERAGE DISPENSERS SHALL BE PROTECTED AGAINST BACKFLOW BY A
BACKFLOW PREVENTER CONFORMING TO ASSE 1022. THE PORTION OF THE BACKFLOW
PREVENTER DEVICE DOWNSTREAM FROM THE SECOND CHECK VALVE AND THE PIPING
DOWNSTREAM THEREFROM SHALL NOT BE AFFECTED BY CARBON DIOXIDE GAS.
COFFEE MACHINES AND NONCARBONATED BEVERAGE DISPENSERS:
THE WATER SUPPLY CONNECTION TO COFFEE MACHINES AND NONCARBONATED BEVERAGE
DISPENSERS SHALL BE PROTECTED AGAINST BACKFLOW BY A BACKFLOW PREVENTER
CONFORMING TO ASSE 1022.
INSTALLATION:
BACKFLOW PREVENTERS SHALL BE INSTALLED STRICTLY ACCORDING TO MANUFACTURER’S
WRITTEN INSTRUCTIONS AND ACCORDING TO THE CODES REFERENCED ABOVE.