HomeMy WebLinkAboutVWC CONV STORE24 M1.1 10-14-2021I
I
IREVISIONS:DRAWING COMPLETION DATE:4820 Buttonwood CrescentARCHITECT AIAGORDON CLARKIndianapolis, Indiana 46228Phone: 317 255-2546317 252-5573Fax: GClark4820@aol.comCONVENIENCE STORE / FOOD MARTVILLAGE OF WEST CLAYCARMEL, INDIANASOUTHWEST CORNER OFHARLESTON STREET AND TOWNE ROADOCTOBER 14, 2021
FOR PERMITTING AND CONSTRUCTION300 CFM 300 CFM 300 CFM 300 CFM
200 CFM
225 CFM
225 CFM
225 CFM
225 CFM
225 CFM
225 CFM
225 CFM
225 CFM
200 CFM
250 CFM 250 CFM
200 CFM
200 CFM
200 CFM
200 CFM
250 CFM
125 CFM
125 CFM
75 CFM
EXHAUST
75 CFM
EXHAUST
EXHAUST
TO DAYLIGHT
INSTALL RAIN
AND INSECT
SCREEN
6" FLEX
6" FLEX
DAMPER ALL BRANCHES
10" FLEX 10" FLEX 10" FLEX 10" FLEX
8" FLEX 8" FLEX 8" FLEX 8" FLEX
DAMPER ALL BRANCHES DAMPER ALL BRANCHES
8" FLEX 8" FLEX 8" FLEX 8" FLEX
DAMPER ALL BRANCHES
10" ROUND
10" ROUND
8" FLEX 8" FLEX
DAMPERS
25" x 8"
8" FLEX
8" FLEX
32" x 8"
GRILLES WITH
DAMPERS
COOLER
PACKAGE
BY MFGR.
CONDENSER LINE
TO DRAIN
200 CFM
MECHANICAL SCHEDULE
SCALE: 1/4" = 1'-0"
MECHANICAL PLAN
ROOFTOP COOLING-HEATING UNITS
THE ROOFTOP UNITS SHALL BE FACTORY PACKAGED WITH
CIRCULATING FAN, GAS-FIRED HEATING SECTION AND AIR-COOLED
REFRIGERATION SECTION. UNIT SHALL BE ROOF CURB MOUNTED.
UNIT SHALL BE RATED IN ACCORDANCE WITH ARI STANDARDS 270 AND
360 AND TESTED AND CERTIFIED BY UL OR ETL TO CONFORM TO
APPLICABLE ANSI STANDARDS.
A WALL MOUNTED SPACE THERMOSTAT SHALL BE FURNISHED WITH
THE UNIT.
THE REFRIGERATION SYSTEM AND FURNACE HEAT EXCHANGERS
SHALL CARRY A FIVE-YEAR WARRANTY.
PROVIDE CONDENSATE DRAINAGE PIPING FROM THE DRAIN PAN WITH A
4” DEEP TRAP AND CLEANOUT.
THE ELECTRICAL CONTRACTOR WILL PROVIDE POWER WIRING THRU A
FUSED DISCONNECT SWITCH ON ONE SET OF POWER TERMINALS IN
EACH UNIT. ALL OTHER POWER AND CONTROL WIRING REQUIRED FOR
THE COMPLETION OF THE SYSTEM SHALL BE FURNISHED AND
INSTALLED BY THE HVAC CONTRACTOR. ALL WIRING BY ANY
CONTRACTOR SHALL MEET OR EXCEED ALL STATE AND LOCAL CODES
AND ORDINANCES.
INSTALL A LOCAL DISCONNECT WITHIN THE LINE OF SIGHT OF TO ALL
PERMANENTLY CONNECTED ROOFTOP EQUIPMENT. THIS CAN ALSO
INCLUDE CONDENSERS FOR COOLER UNITS AND HOOD INTAKE AND
EXHAUST FANS.
PROVIDE A RECEPTACLE WITHIN 25 FEET OF THE ROOFTOP UNITS. IT
SHALL BE GFIC PROTECTED. THE GFIC TESTING THE TRIPPING RESET
SHOULB BE READILY ACCESSIBLE FOR SERVICING OF ROOFTOP
EQUIPMENT. PROVIDE “WHILE-IN-USE” WEATHERPROOF COVERS FOR
RECEPTACLES INSTALLED IN A WET LOCATION SO THAT THE
RECEPTACLE REMAINS WATERTIGHT WHILE A CORD IS PLUGGED IN.
MECHANICAL SPECIFICATIONS AND GENERAL
REQUIREMENTS:
THE CONTRACT DOCUMENTS CONSIST OF THE DRAWINGS AND SPECIFICATIONS ON THE
DRAWINGS. THE INTENT OF THE CONTRACT DOCUMENTS IS TO INCLUDE ITEMS NECESSARY
FOR THE PROPER EXECUTION OF THE WORK.
NEW CONSTRUCTION SHALL CONFORM TO ALL APPLICABLE CITY, STATE AND LOCAL BUILDING
CODES AND NFPA CODES FOR THIS CLASS OF WORK.
MECHANICAL CONTRACTOR IS RESPONSIBLE FOR ALL APPLICABLE PERMITS, INSPECTIONS AND
LICENSES NECESSARY TO COMPLETE THIS INSTALLATION AND THE SATISFACTORY OPERATION
OF THE SYSTEM.
MECHANICAL CONTRACTOR SHALL VERIFY EXISTING CONDITIONS AND DIMENSIONS AT THE
JOBSITE. IF DISCREPANCIES ARE FOUND THE GENERAL CONTRACTOR SHALL BE NOTIFIED
BEFORE PROCEEDING WITH ANY WORK OR ORDERING ANY EQUIPMENT OR MATERIAL IN THE
AFFECTED AREA.
FIT AND QUANTITY OF THE MECHANICAL SYSTEMS TO BE INSTALLED, WITH THE VARIOUS
NECESSARY PARTS AND MATERIALS TO MAKE A COMPLETE AND FINISHED JOB, SHALL BE
VERIFIED AND COORDINATED PRIOR TO START OF CONSTRUCTION AND ARE THE EXCLUSIVE
RESPONSIBILITY OF THE MECHANICAL CONTRACTOR.
THE MECHANICAL CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES AND
VERIFY ALL POWER AND DRAINS ARE PROVIDED AND IN THE PROPER LOCATION.
ALL EQUIPMENT AND MATERIALS SHALL BE INSTALLED PER THE MANUFACTURER'S SUGGESTED
INSTALLATION REQUIREMENTS IN A NEAT AND WORKMANLIKE MANNER.
MECHANICAL DRAWINGS ARE DIAGRAMMATIC AND MUST BE FIELD VERIFIED FOR EXACT
ROUTING AND ADDITIONAL EQUIPMENT OR DEVICES NECESSARY FOR COMPLETE JOB.
MECHANICAL CONTRACTOR SHALL PROVIDE ALL CONTACTORS, RELAYS AND THERMOSTATS.
ELECTRICAL CONTRACTOR SHALL PROVIDE ALL SWITCHES AND DISCONNECTS.
THE MECHANICAL CONTRACTOR SHALL COMPLETE TEMPERATURE CONTROL WIRING.
PROVIDE ALL NECESSARY HANGERS, FASTENERS, CLIPS AND OTHER DEVICES REQUIRED FOR A
COMPLETE JOB.
SUPPORT:
SUSPENDED TYPE UNIT HEATERS SHALL BE SUPPORTED BY ELEMENTS THAT ARE DESIGNED
AND CONSTRUCTED TO ACCOMMODATE THE WEIGHT AND DYNAMIC LOADS. HANGERS AND
BRACKETS SHALL BE OF NONCOMBUSTIBLE MATERIAL.
USE UNISTRUT-TYPE SUPPORT MATERIALS RATED FOR WEIGHT OF THE UNITS. CONNECT TO
STRUCTURAL ELEMENTS. NO CONNECTIONS TO ROOFING MATERIALS SHALL BE ALLOWED.
GAS PIPING SPECIFICATIONS:
BLACK STEEL: 2" OR SMALLER-SCHEDULE 40, GRADE "B" ASTM A120
SCREWED 150 PSI BLACK MALLEABLE IRON FITTINGS.
VALVES: PLUG TYPE
GAS SUPPORTS SHALL BE MINIMUM OF 10'-0" O.C.
ALL HVAC UNITS SHALL BE INSTALLED COMPLETE WITH ECONOMIZERS, LOW AMBIENT KITS, AND
REQUIRED CURBS, ETC.
MANUFACTURER'S MINIMUM CLEARANCE RECOMMENDATIONS SHALL BE MAINTAINED ON ALL
EQUIPMENT AND DUCTWORK.
ALL EXHAUST DUCTWORK SHALL BE METAL ROUND DUCTWORK. NO FLEXIBLE ROUND
DUCTWORK SHALL BE USED.
ALL MAIN DUCTS SHALL BE GALVANIZED STEEL WRAPPED WITH FOIL-BACK INSULATION OR
DUCT BOARD. INSTALL PER SMACNA STANDARDS. TURNING VANES SHALL BE INSTALLED AT
ELBOWS LARGER THAN 12" X 12".
ALL METAL DUCTWORK SHALL BE FABRICATED FROM GALVANIZED SHEET STEEL OF GAUGES,
REINFORCEMENT COMPLYING WITH SMACNA "HVAC DUCTWORK CONSTRUCTION STANDARDS."
THE ARCHITECT SHALL HAVE ACCESS TO THE CONSTRUCTION SITE AND HAVE THE RIGHT TO
REJECT ANY WORK (AFTER CONSULTATION WITH THE GENERAL CONTRACTOR) THAT DOES NOT
CONFORM TO THE DRAWINGS, SPECIFICATIONS, CODES OR WORK THAT HAS NOT BEEN
EXECUTED IN A WORKMANLIKE MANNER.
CONTRACTOR SHALL BE RESPONSIBLE FOR NOTICE TO THE INSPECTING AUTHORITIES,
ARCHITECT, OR GENERAL CONTRACTOR, SO THAT WORK CAN BE INSPECTED OR APPROVED
BEFORE COVERING. THIS PROCEDURE SHALL OCCUR WITHOUT AFFECTING CONSTRUCTION
PROGRESS AND COMPLETION.
THE INTENTION OF THESE DOCUMENTS IS TO PROVIDE THE OWNER WITH A BUILDING
COMPLETE IN ITS ENTIRETY AT THE TIME OF OCCUPANCY. IT IS THE SUB-CONTRACTOR'S
RESPONSIBILITY TO CONTRACT THE GENERAL CONTRACTOR DURING THE BIDDING/PRICING
PHASE OF ANY DETAILS MISSING, VAGUE, ORE INCOMPLETE SO THAT AN APPROPRIATE
ADDENDUM OR CLARIFICATION CAN BE ISSUED. THE SELECTED CONTRACTOR SHALL PROVIDE
ALL MATERIALS, LABOR, TOOLS, EQUIPMENT, AND SERVICES NECESSARY FOR A COMPLETE,
FUNCTIONAL, AND OPERATIONAL FACILITY.
TWO COPIES OF OPERATION AND MAINTENANCE MANUALS FOR MATERIALS INSTALLED PER
WORK OF THIS SECTION SHALL BE DELIVERED TO OWNER PRIOR TO ACCEPTANCE OF THESE
SPACES FOR OCCUPANCY.
RTU #1 RTU #2
4 TON 6 TON
BEVERAGE COOLER COOLING BY MANUFACTURER
PROVIDE CONDENSATE LINE TO APPROPRIATE
DRAIN LOCATION
FREEZER. COOLED BY
MANUFACTURER
M1.1