Loading...
HomeMy WebLinkAboutF100.2 - Finish Plan-North, South CollegeUP U P UP NURSING LAB 146CONF 128 OPEN OFFICE 20 STATIONS 126 OFFICE 118 OFFICE 117 OFFICE 106 OFFICE 102 OFFICE 105 OFFICE 104 OFFICE 103 OFFICE 115 OFFICE 114 OFFICE 113 OFFICE 112 OFFICE 116 ENTRY 101 TESTING 109 COPY 107 CLASSROOM 139 CLASSROOM 138 STUDY 144 STAFF BREAK 132 STORAGE / IT 140 OFFICE 119 OFFICE 120 OFFICE 121 OFFICE 122 CONFERENCE 123 COMPUTER LAB 170 ENTRY 169 LIBRARY / RESOURCE LAB 168 STUDENT CENTER 141 FIRE-RATED FILES 137 OFFICE 111 OFFICE 110 TESTING 108 OFFICE 124 STUDY 145 STUDY 143 STUDY 142 OFFICE 130 OFFICE 136 OFFICE 135 OFFICE 134 OFFICE 131 OPEN OFFICE 3 STATIONS 133 ENTRY 127 RR 129 EXIT DISCHARGE 171 HALL 172 CLOSET 125 FINISH PLAN A131FINISH PLAN DESCRIPTIONDATE ISSUE 05.05.21 REVIEW SET 05.14.21 PERMIT SET 06.08.21 CONSTRUCTION SET REVISIONS DESCRIPTIONMARK DATE DB 06.08.21 AS REV 1 THIS DRAWING, AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN, ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF SCHOTT DESIGN, INC., AND ARE NOT TO BE USED OR REPRODUCED IN WHOLE, OR IN PART, WITHOUT THE WRITTEN CONSENT OF SCHOTT DESIGN. PROJECT NUMBER DRAWN BYPROJ. MGR 450 E. 96th StreetIndianapolis, IN 46240p: 317.387.1700www.schottdesign.comSOUTH COLLEGEPENN ON PKWY | 1ST FLOOR301 PENNSYLVANIA PKWY, INDIANAPOLIS, IN 46280AS/EHAS 2020.325 AREA NOT IN CONTRACT AREA OF WORK 1ST FLOOR - N PLAN NOTES DESIGN INTENT IS FOR TRANSITION FROM CARPET TO LVT TO BE SMOOTH WITH NO TRANSITION STRIP SINCE HEIGHT OF CARPET PILE IS SAME HEIGHT AS LVT THICKNESS. IF NOT POSSIBLE, COORDINATE WITH SDI. PROVIDE CLEAR CORNER GUARD FROM FLOOR TO CEILING AT THIS LOCATION. PATCH COMMON CORRIDOR FINISHES AS REQUIRED AT THIS LOCATION. COORDINATE ATTIC STOCK AND/OR SPECIFICATIONS WITH PROPERTY MANAGER. PROVIDE WALL TILE (WT1) FROM TOP OF TILE BASE TO 4'-0" AFF ON ALL WALLS WITH SCHLUTER JOLLY TRIM PIECE ALONG TOP EDGE OF TILE, FINISH: BRUSHED STAINLESS STEEL (EB). PROVIDE WALLCOVERING (WC8) FROM TOP OF TILE TO CEILING. PROVIDE SCHLUTER SCHIENE TRANSITION STRIP AT FLOORING TRANSITION, FINISH: BRUSHED STAINLESS STEEL (EB). PROVIDE LEVELING LATEX AS REQUIRED SO THAT TOP OF FINISHES ARE LEVEL. SEAM SEAL CARPET EDGES. GC TO CONFIRM THAT TRANSITION PROFILE IS APPROPRIATE FOR FLOORING MATERIALS. PROVIDE MIX OF LVT2, LVT3 AND LVT4 IN THIS AREA IN ASHLAR PATTERN. REFER TO PATTERN INSTALLATION FROM MANUFACTURER FOR MORE INFORMATION. PROVIDE MIX OF LVT5 AND LVT6 IN THIS AREA IN ASHLAR PATTERN. REFER TO PATTERN INSTALLATION FROM MANUFACTURER FOR MORE INFORMATION. CPT1 TO BE INSTALLED IN HERRINGBONE PATTERN IN THIS LOCATION. LVT1 TO BE INSTALLED IN HERRINGBONE PATTERN IN THIS LOCATION. NOTE: NOT ALL PLAN NOTES ARE USED ON EACH SHEET. 1. REFER TO LEGEND FOR ALL ACCENT/SPECIALTY PAINT OR WALLCOVERING THAT REQUIRES A LEVEL 5 DRYWALL FINISH. REFER TO MANUFACTURER RECOMMENDATIONS. 2. CONTRACTOR TO EVALUATE EXISTING FLOORING CONDITIONS AFTER DECONSTRUCTION IS COMPLETE AND PREP AS NECESSARY PER MANUFACTURERS RECOMMENDATIONS. SEALCOAT THE CONCRETE FLOOR PRIOR TO LAYING ADHESIVE IF DEEMED NECESSARY. 3. AT NEW WALL TILE LOCATIONS PROVIDE APPROPRIATE SUBSTRATE FOR WALL TILE (CEMENT BACKER BOARD) AS RECOMMENDED BY MANUFACTURER. 4. IF FINISH SUBMITTALS ARE REQUESTED AS PART OF THIS SCOPE, THEY ARE TO BE SUBMITTED IN DIGITAL FORMAT. GENERAL NOTES 48" 1 0 2' 4' 8' 16' 01/11/22