Loading...
HomeMy WebLinkAboutVWC CONV STORE1 COVER 10-14-2021I I I A R C H I T E C T : DRAWING COMPLETION DATE: 4820 Buttonwood Crescent ARCHITECT AIAGORDON CLARK Indianapolis, Indiana 46228 Phone: 317 255-2546 317 252-5573Fax: GClark4820@aol.com FOR PERMITTING AND CONSTRUCTION GENERAL REQUIREMENTS AND GUIDELINES FOR THIS PROJECT: THE CONTRACT DOCUMENTS CONSIST OF THE DRAWINGS AND SPECIFICATIONS ON THE DRAWINGS. THE INTENT OF THE CONTRACT DOCUMENTS IS TO INCLUDE ITEMS NECESSARY FOR THE PROPER EXECUTION OF THE WORK. THE CONTROLLING CODE FOR ALL WORK UNDER THESE DRAWINGS SHALL BE THE INTERNATIONAL BUILDING CODE 2014 WITH INDIANA AMENDMENTS, ALL IN THEIR CURRENT ADDITIONS. THE CONTROLLING DOCUMENT FOR ALL WORK UNDER THESE DRAWINGS SHALL BE THE GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION, AIA (AMERICAN INSTITUTE OF ARCHITECTS) DOCUMENT A201, CURRENT EDITION. AGREEMENT BY ANY PARTY TO WORK UNDER THIS CONTROLLING DOCUMENT SHALL COMMENCE WITH THE START OF ANY WORK DESCRIBED WITHIN THESE DOCUMENTS. THE ARCHITECT SHALL FILE FOR STATE PLAN REVIEW AND PROVIDE A RELEASE FOR USE IN OBTAINING LOCAL PERMITS. THE GENERAL CONTRACTOR SHALL FILE DRAWINGS OR OTHER MATERIALS FOR PERMIT APPLICATION AT THE LOCAL LEVEL AND SECURE ALL NECESSARY BUILDING PERMITS. SUB- CONTRACTORS TO THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING THEIR OWN LOCAL PERMITS. PRIOR TO COMMENCING ACTIVITIES, EACH CONTRACTOR AND MATERIAL SUPPLIER SHALL CAREFULLY STUDY AND COMPARE THE CONTRACT DOCUMENTS AND BECOME FULLY AWARE OF THE REQUIREMENTS. EACH CONTRACTOR AND MATERIAL SUPPLIER SHALL TAKE FIELD MEASUREMENTS AND VERIFY FIELD CONDITIONS AND SHALL CAREFULLY COMPARE SUCH MEASUREMENTS AND CONDITIONS WITH THE CONTRACT DOCUMENTS. IN THE EVENT OF INCONSISTENCIES WITHIN OR BETWEEN THE CONTRACT DOCUMENTS, EACH CONTRACTOR OR MATERIAL SUPPLIER SHALL PROVIDE THE BETTER QUALITY OR GREATER QUANTITY OF THE WORK, AND SHALL COMPLY WITH THE STRICTER REQUIREMENT. INCONSISTENCIES DISCOVERED SHALL BE IMMEDIATELY REPORTED TO THE ARCHITECT IN WRITING. NO PLEAS OF IGNORANCE RESULTING FROM FAILURE TO EXAMINE THE REQUIREMENTS OF THE CONTRACT DOCUMENTS OR THE CONDITIONS UNDER WHICH THE WORK IS TO BE PERFORMED WILL BE ACCEPTED AS AN EXCUSE FOR FAILURE OR OMISSION ON THE PART OF EACH CONTRACTOR AND MATERIAL SUPPLIER TO FULFILL IN EVERY RESPECT ALL REQUIREMENTS OF THE CONTRACT DOCUMENTS. VERIFY THAT SURFACES TO RECEIVE MATERIALS ARE IN A CONDITION TO ACCOMMODATE INSTALLATION. IMMEDIATELY REPORT TO THE ARCHITECT ANY ARCHITECT / ENGINEER NOTIFICATION: IF THE GENERAL CONTRACTOR DISCOVERS CONDITIONS THAT ARE NOT SUBSTANTIALLY LIKE THE ARCHITECT’S DRAWINGS, THE ARCHITECT OR ENGINEER SHALL BE IMMEDIATELY NOTIFIED. THIS NOTIFICATION RELATES TO ALL PARTS OF THIS PROJECT, INCLUDING BUT NOT LIMITED TO DISCOVERED SOIL CONDITIONS, INAPPROPRIATE OR NON- SPECIFIED PRODUCTS DELIVERED AND/OR INSTALLED ON SITE, OR ANY QUESTION REGARDING POSSIBLE VIOLATION OF CODES OR ORDINANCE STANDARDS. PROCEEDING WITH THE WORK SHALL CONSTITUTE ACCEPTANCE BY THE GENERAL CONTRACTOR OF THE EXISTING CONDITIONS, AND THAT THE PROJECT CAN BE BUILT STRUCTURALLY SOUND AND MEETING LOCAL CODES. Indiana Adopted Codes for Building Construction In effect December 1, 2014 2014 Indiana Building Code Adoption by Reference: 2012 International Building Code First Printing plus Indiana Amendments, effective December 1st 2014. 2009 Indiana Electrical Code Adoption by Reference: 2008 National Electric Code First Printing plus Indiana Amendments, effective August 26, 2009. 2014 Indiana Fuel Gas Code Adoption by Reference: 2012 International Fuel Code First Printing plus Indiana Amendments, effective December 1st 2014. 2014 Indiana Mechanical Code Adoption by Reference: 2012 International Mechanical Code First Printing plus Indiana Amendments, effective December 1st 2014. 2012 Indiana Plumbing Code Adoption by Reference: 2006 International Plumbing Code Second Printing plus the Indiana Amendments, effective December 24, 2012. 2005 Indiana Residential Code Adoption by Reference: 2003 International Residential Code Fifth Printing plus Indiana Amendments, effective September 11, 2005. 2014 Indiana Fire Code Adoption by Reference: 2012 International Fire Code First Printing plus Indiana Amendments, effective December 1st 2014. 2010 Indiana Energy Conservation Code Adoption by Reference: 2007 Edition ASHRAE 90.1 plus Indiana Amendments, effective May 6, 2010. A Complete list of all codes and other rules adopted by the Fire Prevention & Building Safety Commission of the State of Indiana along with PDF versions of the Indiana Amendments can be found at: http://www.in.gov/dhs/2490.htm DISCREPANCIES OR ERRORS WHICH WOULD RESULT IN POOR APPLICATION OR CAUSE LATENT DEFECTS IN WORKMANSHIP. IF A CONTRACTOR OR SUB- CONTRACTOR PROCEEDS WITH INSTALLATION OF MATERIALS OVER ANOTHER CONTRACTOR'S WORK, IT SHALL BE ASSUMED THAT THE CONTRACTOR OR SUB- CONTRACTOR ACCEPTS THE WORK TO RECEIVE HIS MATERIAL. ALL LABOR, CONSTRUCTION MATERIALS, PROVIDED AND INSTALLED TO COMPLETE THE WORK OF THESE CONTRACT DOCUMENTS SHALL BE EXECUTED IN COMPLETE COMPLIANCE WITH ALL LOCAL, STATE AND FEDERAL CODES, PRACTICES OR ORDINANCES AND WITHIN THE CONSTRAINTS OF THE HIGHEST ACCEPTABLE CONSTRUCTION PRACTICES. UPON COMPLETION OF THE PROJECT, OBTAIN ALL FINAL INSPECTIONS AS REQUIRED BY THE LOCAL JURISDICTIONS AND FURNISH OWNER WITH EVIDENCE OF ALL SUCH INSPECTIONS AND CERTIFICATES OF OCCUPANCY, IF ISSUED BY THE JURISDICTION. THE GENERAL CONTRACTOR SHALL PROVIDE REASONABLE SUPERVISION AND COORDINATION OF ALL SUB-CONTRACTORS WORK INCLUDING WORK PERFORMED BY OTHERS SUCH AS SUPPLIERS OF OWNER-SUPPLIED ITEMS. UPON COMPLETION OF PROJECT, PROVIDE OWNER WITH ALL INSTRUCTION MANUALS, WARRANTIES OR OTHER DOCUMENTS REQUIRED FOR THE PROPER OPERATION OR MAINTENANCE OF ANY PART OF THE CONTRACTOR'S WORK. THE GENERAL CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTION AND SECURITY MEANS FOR HIS WORK UNTIL TURNED OVER TO THE OWNER. IF THE PROJECT AREA IS TO BE USED BY EMPLOYEES OR THE PUBLIC DURING CONSTRUCTION, FULLY PROTECT THE CONSTRUCTION SITE, CONSTRUCT BARRIERS AND FENCING, AND PROVIDE APPROPRIATE SIGNAGE TO PROTECT THESE PERSONS. THE GENERAL CONTRACTOR SHALL PROVIDE AND MAINTAIN MINIMUM GENERAL LIABILITY INSURANCE. THE FRANCHISEE, FRANCHISER, AND THE ARCHITECTS SHALL BE HELD HARMLESS AGAINST ALL GENERAL LIABILITY CLAIMS THAT MAY RESULT AS A PART OF THIS PROJECT. SOILS: OTHERS HAVE CHOSEN TO NOT TEST SOILS FOR THIS PROJECT, NOR MAKE SOIL DATA AVAILABLE TO THE ARCHITECT. THE ARCHITECT SHALL BE HELD HARMLESS FOR ANY COMMON SOIL FAILURES SUCH AS FAILURE OF COMPACTION; DENSITY FAILURE; GENERAL SOIL SHEAR OR SHRINKAGE; SETTLEMENT FAILURE; SLOPE FAILURE; FLOW SLIDE FAILURE; MOVEMENTS CAUSED BY EXPANISIVE OR HIGHLY PLASTIC SOILS; OR ANY OTHER COMMONY ANALYIZED SOIL FAILURES. CONVENIENCE STORE / FOOD MART VILLAGE OF WEST CLAY CARMEL, INDIANA SOUTHWEST CORNER OF HARLESTON STREET AND TOWNE ROAD OCTOBER 14, 2021 INDEX OF DRAWINGS OF THIS SET: ARCHITECTURAL, STRUCTURAL, PLUMBING, MECHANICAL, ELECTRICAL DRAWINGS: COVER SHEET GENERAL PROJECT GUIDELINES; INDIANA BUILDING CODES A1.1 FLOOR PLAN A1.2 FOUNDATION PLAN; CONCRETE SPECIFICATIONS A1.3 REFLECTED CEILING PLAN; ACOUSTIC CEILING SPECIFICATIONS; BULKHEAD GUIDELINES A1.4 ROOF FRAMING PLAN; JOIST BRACING CUT SHEET A1.5 ROOF PLAN; ROOF MEMBRANE SPECS.; SCUPPER CUT SHEETS LS1.1 LIFE SAFETY PLAN; BUILDING CODE SUMMARY A2.1 BUILDING ELEVATIONS A2.2 BUILDING ELEVATIONS A3.1 TRANSVERSE SECTION THRU TYPICAL MASONRY WALLS A3.2 TRANSVERSE SECTION THRU SOUTH DOORS A3.3 TRANSVERSE SECTION THRU NORTH DOORS AND SOUTH STOREFRONT A3.4 STOREFRONT WINDOW DETAIL; STOREFRONT SPECIFICATIONS; NORTH WALL DETAIL SECTION A3.5 COOLER SECTION AND WEST WALL DETAIL SECTION; COOLER SPECIFICATIONS A4.1 STEEL DETAILS; STEEL OPEN-WEB JOIST SPECIFICATIONS; GENERAL STEEL REQUIREMENTS A4.2 RESTROOM DETAIL PLAN AND OTHER INTERIOR ELEVATIONS A4.3 SPECIFICATIONS; ELECTRICAL GROUNDING SPECIFICATIONS; GROUNDING SCHEMATIC A4.4 ROOF EQUIPMENT SCREENING SPECIFICATIONS; SCREENING CUT SHEETS A4.5 ADA DETAILS A5.1 DUMPSTER AND SOUTH MASONRY WALL ELEVATIONS AND DETAILS A6.1 FUEL CANOPY PLANS AND STRUCTURAL DETAILS; FUEL CANOPY CONCRETE SPECIFICATIONS; PRE-ENGINEERED FUEL CANOPY SPECIFICATIONS A6.2 FUEL CANOPY ELEVATIONS; REFLECTED CEILING / LIGHTING PLAN; LIGHT CUT SHEETS A7.1 BUILDING SIGNAGE; GROUND SIGN; CANOPY SIGNAGE P1.1 SANITARY SEWER PLAN; PLUMBING SPECIFICATIONS P1.2 PLUMBING ISOMETRIC; DOMESTIC WATER DISTRIBUTION SPECIFICATIONS M1.1 MECHANICAL PLAN; MECHANICAL SPECIFICATIONS; MECHANICAL EQUIPMENT SCHEDULE E1.1 ELECTRICAL POWER PLAN; ELECTRICAL SPECIFICATIONS; RISER DIAGRAM E1.2 ELECTRICAL LIGHTING PLAN; EXTERIOR SCONCE LIGHT CUT SHEET CIVIL ENGINEERING DRAWING: C101 SITE DEVELOPMENT PLAN LANDSCAPE DRAWINGS: L1.0 SITE LANDSCAPE PLAN L2.0 LANDSCAPE NOTES AND DETAILS