HomeMy WebLinkAboutG0.1_Master Parking PlanPROPOSED NATATORIUM
BUILDING ADDITION
F.F.E.= 831.98
F.F.E.= 831.98
F.F.E.= 831.98
F.F.E.= 834.65
SMOKEY ROW ROAD / E 136TH STREET
E MAIN STREET
PARKING LOT ADDITION
(NOT IN SCOPE OF THIS PROJECT)
PERFORMING ARTS BUILDING ADDITION
(UNDER CONSTRUCTION. NOT IN SCOPE OF THIS PROJECT)
3
10
12
6
PAVING AT MURRAY FIELD
(NOT IN SCOPE OF THIS PROJECT)
12
5
5
15
3
NATATORIUM BUILDING ADDITION
15
12
14
13
10
10
9
8
7
6
5
4
3
2
1
11
22
10
26
8
200 6000200400
G0.1
MASTER PARKING PLAN
1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND.
2.BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN WERE
PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC.
3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT
AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH
PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO
THE ENGINEER.
GENERAL NOTES
KEYNOTES
PROPOSED BICYCLE RACKS MOUNTED TO EXISTING SIDEWALKS
PROPOSED BICYCLE RACKS MOUNTED TO NEW SIDEWALKS
1
1
THE NUMBERS SHOWN IN THE SYMBOLS BELOW INDICATE THE QUANTITY OF
BICYCLE RACKS PROPOSED IN A PARTICULAR AREA.
1
THE NUMBERS SHOWN IN THE SYMBOL BELOW INDICATE DESIGNATED
PARKING LOT IDENTIFICATION.
PARKING LOT IDENTIFICATION NUMBER
BICYCLE RACK LOCATION SUMMARY TABLE
LOCATION BICYCLE RACKS
MAIN BUILDING 94
FOOTBALL STADIUM 28
12
3
137
TENNIS COURTS
MURRAY STADIUM
TOTAL BICYCLE RACKS
274TOTAL BICYCLE PARKING SPACES
THE ABOVE BICYCLE RACKS ACCOMMODATE 5,480 STUDENTS
BICYCLE SPACES REQUIRED = 1 PER 20 STUDENTS
BUILDING AREA SUMMARY
YEAR
(2002 THROUGH 2021)
PROJECT EXIST. AREA SF.NEW AREA SF.TOTAL AREA SF.%ADDED REMARKS
2002 FRESHMAN CENTER
2004 LOCKER ROOM
2012 PHYSICAL EDUCATION
2019 POOL ENTRANCE #21
2021 DOCK STORAGE
2021 PERFORMING ARTS
776,647
950,591
953,243
980,852
981,547
982,955
173,944
2,652
27,609
695
1,408
25,464
950,591
953,243
980,852
981,547
982,955
1,008,419
22.40
0.28
2.90
0.07
0.14
2.59
BZA APPROVAL WITH VARIANCES
NO CLASSROOM IN ADDITION
NO CLASSROOM IN ADDITION
NO CLASSROOM IN ADDITION
NO CLASSROOM IN ADDITION
NO CLASSROOM IN ADDITION
2007 TENNIS BUILDING 1,700 SEPARATE BUILDING AT STADIUM SITE
2011 SECURE ENTRANCE 0 NO NEW CONSTRUCTION
2023 NATATORIUM 1,008,419 93,229 1,101,648 9.25 NO CLASSROOM IN ADDITION
OVERALL PARKING SUMMARY
LOT NO.LOT NAME STANDARD SPACE
OLD SENIOR LOT 651
EXIST.PROPOSED
65
ADA SPACE
0
EXIST.
0
POLICE SPACE
0
EXIST.
0
BUS SPACE
0
EXIST.
0
TOTAL SPACES
65
EXIST.PROPOSED
65
2
3
4
5
6
7
8
9
10
12
13
14
15
DOOR 7 19 19 4 4 0 0 0 0 23 23
FRONT LOT 109 103 3 7 3 3 0 0 115 113
AUDITORIUM LOT 52 0 4 0 0 0 0 0 56 0
WEST LOT 69 69 0 0 0 0 0 0 69 69
FRESHMAN CENTER LOT 142 142 6 6 1 1 0 0 149 149
FIELDHOUSE LOT 29 29
FITNESS CENTER LOT 20 2 22
POOL LOT 110 0 8 0 1 0 0 0 119
TRAIL LOT 152 221 0 7 0 1 0 4 152 229
SUBTOTAL 766 686 27 26 5 5 0 4 799 697
FOOTBALL HOME LOT 948 948 11 11 0 0 0 0 959 959
FOOTBALL SOUTH LOT 143 143 0 0 0 0 21 = 42 21 = 42 185 185
FOOTBALL VISITOR LOT 516 516 9 9 0 0 0 0 525 525
FOOTBALL NORTH LOT 79 79 0 0 0 0 0 0 79 79
29 0 0 0 0 0 0 29
0 0 0 0 0 0 0
0
PROPOSED PROPOSED PROPOSED
2,4452,547TOTAL
CITY OF CARMEL REQUIRED PARKING SPACES (235 CLASSROOMS x 10) + (583 EMPLOYEES) = 2,933
(UPON COMPLETION OF THE NATATORIUM PROJECT)
SUBTOTAL 1,686 1,686 20 20 0 0 1,748 1,74821 = 42 21 = 42
AVAILABLE PARKING SPACES UNTIL JUNE 2022 (LOTS 8 & 9) = 2,644
PERMIT PARKING SPACES = 1334 (STUDENTS) + 583 (EMPLOYEES) = 1,917
NOTES:
1.THE CARMEL HIGH SCHOOL PARKING POLICY IS BASED ON PERMIT ISSUED PARKING. THERE ARE 1,917 PERMITS ISSUED.
2.ENROLLMENT IS EXPECTED TO DROP BY 75 STUDENTS IN 2022 AND REMAIN LEVEL THROUGH 2029.
3.BUS PARKING AT THE FOOTBALL STADIUM IS CURRENTLY 21 SPACES. THESE SPACES CAN ALSO BE USED FOR STUDENT PARKING AT TWO (2)
STANDARD VEHICLE SPACES FOR EACH BUS SPACE. THE 21 BUS PARKING SPACES ALLOWS FOR 42 STUDENT PARKING SPACES.
4.THE NATATORIUM PROJECT IS SCHEDULED FOR CONSTRUCTION IN JUNE OF 2022. LOTS 8 & 9 WITH 141 SPACES WILL BE AVAILABLE UNTIL THEN.
11 MURRAY FIELD LOT 0 18 0 2 0 0 0 0 0 20
AVAILABLE PARKING SPACES AFTER JUNE 2022 = 2,351
AVAILABLE PARKING SPACES AFTER DECEMBER 2023 = 2,445
PROJECT PARKING SUMMARY
LOT NO.
(NATATORIUM BUILDING ADDITION)
LOT NAME STANDARD SPACE
POOL LOT 1109
EXIST.PROPOSED
0
ADA SPACE
8
EXIST.
0
POLICE SPACE
1
EXIST.
0
BUS SPACE
0
EXIST.
0
TOTAL SPACES
119
EXIST.
0
TRAIL LOT 15210 221 0 7 0 1 0 4 152 229
MURRAY FIELD LOT 011 18 0 2 0 0 0 0 0 20
PROJECT TOTAL 282 239 10 9 1 1 0 4 293 249
NET LOSS = 44 SPACES
PROPOSED PROPOSED PROPOSED PROPOSED
FITNESS CENTER LOT 208 0 2 0 0 0 0 0 22 0
COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC.
WWW.FHAI.COM
ARCHITECT
PROJECT NUMBER: 220014.00
CARMEL HIGH
SCHOOL
NATATORIUM
ADDITION AND
RENOVATIONS
CARMEL CLAY SCHOOLS
520 E MAIN STREET
CARMEL, IN 46032
PROJECT ISSUE DATE: 11.17.2021
REGULATORY REVIEW
DRAWN BY: HHW
317.848.0966
350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204
REV.
NO.DESCRIPTION DATE
CONSULTANT
A TAC SUBMITTAL 11/17/2021
19700317
No.