Loading...
HomeMy WebLinkAboutG0.1_Master Parking PlanPROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 834.65 SMOKEY ROW ROAD / E 136TH STREET E MAIN STREET PARKING LOT ADDITION (NOT IN SCOPE OF THIS PROJECT) PERFORMING ARTS BUILDING ADDITION (UNDER CONSTRUCTION. NOT IN SCOPE OF THIS PROJECT) 3 10 12 6 PAVING AT MURRAY FIELD (NOT IN SCOPE OF THIS PROJECT) 12 5 5 15 3 NATATORIUM BUILDING ADDITION 15 12 14 13 10 10 9 8 7 6 5 4 3 2 1 11 22 10 26 8 200 6000200400 G0.1 MASTER PARKING PLAN 1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2.BOUNDARY AND TOPOGRAPHIC SURVEY INFORMATION SHOWN WERE PROVIDED BY CIVIL ENVIRONMENTAL CONSULTANTS, INC. 3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. GENERAL NOTES KEYNOTES PROPOSED BICYCLE RACKS MOUNTED TO EXISTING SIDEWALKS PROPOSED BICYCLE RACKS MOUNTED TO NEW SIDEWALKS 1 1 THE NUMBERS SHOWN IN THE SYMBOLS BELOW INDICATE THE QUANTITY OF BICYCLE RACKS PROPOSED IN A PARTICULAR AREA. 1 THE NUMBERS SHOWN IN THE SYMBOL BELOW INDICATE DESIGNATED PARKING LOT IDENTIFICATION. PARKING LOT IDENTIFICATION NUMBER BICYCLE RACK LOCATION SUMMARY TABLE LOCATION BICYCLE RACKS MAIN BUILDING 94 FOOTBALL STADIUM 28 12 3 137 TENNIS COURTS MURRAY STADIUM TOTAL BICYCLE RACKS 274TOTAL BICYCLE PARKING SPACES THE ABOVE BICYCLE RACKS ACCOMMODATE 5,480 STUDENTS BICYCLE SPACES REQUIRED = 1 PER 20 STUDENTS BUILDING AREA SUMMARY YEAR (2002 THROUGH 2021) PROJECT EXIST. AREA SF.NEW AREA SF.TOTAL AREA SF.%ADDED REMARKS 2002 FRESHMAN CENTER 2004 LOCKER ROOM 2012 PHYSICAL EDUCATION 2019 POOL ENTRANCE #21 2021 DOCK STORAGE 2021 PERFORMING ARTS 776,647 950,591 953,243 980,852 981,547 982,955 173,944 2,652 27,609 695 1,408 25,464 950,591 953,243 980,852 981,547 982,955 1,008,419 22.40 0.28 2.90 0.07 0.14 2.59 BZA APPROVAL WITH VARIANCES NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION NO CLASSROOM IN ADDITION 2007 TENNIS BUILDING 1,700 SEPARATE BUILDING AT STADIUM SITE 2011 SECURE ENTRANCE 0 NO NEW CONSTRUCTION 2023 NATATORIUM 1,008,419 93,229 1,101,648 9.25 NO CLASSROOM IN ADDITION OVERALL PARKING SUMMARY LOT NO.LOT NAME STANDARD SPACE OLD SENIOR LOT 651 EXIST.PROPOSED 65 ADA SPACE 0 EXIST. 0 POLICE SPACE 0 EXIST. 0 BUS SPACE 0 EXIST. 0 TOTAL SPACES 65 EXIST.PROPOSED 65 2 3 4 5 6 7 8 9 10 12 13 14 15 DOOR 7 19 19 4 4 0 0 0 0 23 23 FRONT LOT 109 103 3 7 3 3 0 0 115 113 AUDITORIUM LOT 52 0 4 0 0 0 0 0 56 0 WEST LOT 69 69 0 0 0 0 0 0 69 69 FRESHMAN CENTER LOT 142 142 6 6 1 1 0 0 149 149 FIELDHOUSE LOT 29 29 FITNESS CENTER LOT 20 2 22 POOL LOT 110 0 8 0 1 0 0 0 119 TRAIL LOT 152 221 0 7 0 1 0 4 152 229 SUBTOTAL 766 686 27 26 5 5 0 4 799 697 FOOTBALL HOME LOT 948 948 11 11 0 0 0 0 959 959 FOOTBALL SOUTH LOT 143 143 0 0 0 0 21 = 42 21 = 42 185 185 FOOTBALL VISITOR LOT 516 516 9 9 0 0 0 0 525 525 FOOTBALL NORTH LOT 79 79 0 0 0 0 0 0 79 79 29 0 0 0 0 0 0 29 0 0 0 0 0 0 0 0 PROPOSED PROPOSED PROPOSED 2,4452,547TOTAL CITY OF CARMEL REQUIRED PARKING SPACES (235 CLASSROOMS x 10) + (583 EMPLOYEES) = 2,933 (UPON COMPLETION OF THE NATATORIUM PROJECT) SUBTOTAL 1,686 1,686 20 20 0 0 1,748 1,74821 = 42 21 = 42 AVAILABLE PARKING SPACES UNTIL JUNE 2022 (LOTS 8 & 9) = 2,644 PERMIT PARKING SPACES = 1334 (STUDENTS) + 583 (EMPLOYEES) = 1,917 NOTES: 1.THE CARMEL HIGH SCHOOL PARKING POLICY IS BASED ON PERMIT ISSUED PARKING. THERE ARE 1,917 PERMITS ISSUED. 2.ENROLLMENT IS EXPECTED TO DROP BY 75 STUDENTS IN 2022 AND REMAIN LEVEL THROUGH 2029. 3.BUS PARKING AT THE FOOTBALL STADIUM IS CURRENTLY 21 SPACES. THESE SPACES CAN ALSO BE USED FOR STUDENT PARKING AT TWO (2) STANDARD VEHICLE SPACES FOR EACH BUS SPACE. THE 21 BUS PARKING SPACES ALLOWS FOR 42 STUDENT PARKING SPACES. 4.THE NATATORIUM PROJECT IS SCHEDULED FOR CONSTRUCTION IN JUNE OF 2022. LOTS 8 & 9 WITH 141 SPACES WILL BE AVAILABLE UNTIL THEN. 11 MURRAY FIELD LOT 0 18 0 2 0 0 0 0 0 20 AVAILABLE PARKING SPACES AFTER JUNE 2022 = 2,351 AVAILABLE PARKING SPACES AFTER DECEMBER 2023 = 2,445 PROJECT PARKING SUMMARY LOT NO. (NATATORIUM BUILDING ADDITION) LOT NAME STANDARD SPACE POOL LOT 1109 EXIST.PROPOSED 0 ADA SPACE 8 EXIST. 0 POLICE SPACE 1 EXIST. 0 BUS SPACE 0 EXIST. 0 TOTAL SPACES 119 EXIST. 0 TRAIL LOT 15210 221 0 7 0 1 0 4 152 229 MURRAY FIELD LOT 011 18 0 2 0 0 0 0 0 20 PROJECT TOTAL 282 239 10 9 1 1 0 4 293 249 NET LOSS = 44 SPACES PROPOSED PROPOSED PROPOSED PROPOSED FITNESS CENTER LOT 208 0 2 0 0 0 0 0 22 0 COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 11.17.2021 REGULATORY REVIEW DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO.DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No.