HomeMy WebLinkAboutG1.0_Overall Site PlanTBM#2 = 834.95
TBM#4 = 810.78 HARROWGATE ADDITIONP.B. 2, PG. 203-205
LOT 52
LOT 53
LOT 54
LOT 55
LOT 56
LOT 57
LOT 58
LOT 59
LOT 60
LOT 61
PARCEL 7
PARCEL 8
PROPOSED NATATORIUM
BUILDING ADDITION
F.F.E.= 831.98
F.F.E.= 831.98
F.F.E.= 831.98
F.F.E.= 834.65
20 - PROPOSED
PARKING SPACES
74 - PROPOSED
PARKING SPACES
103.0'
53
.
9
'
25
.
0
'
B
U
I
L
D
I
N
G
S
E
T
B
A
C
K
30
.
0
'
LA
N
D
S
C
A
P
E
B
U
F
F
E
R
30.0'
LANDS
C
A
P
E
BUFFE
R
25.0'
BUILDI
N
G
SETBA
C
K
40 12004080
G1.0
OVERALL SITE PLAN
COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC.
WWW.FHAI.COM
ARCHITECT
PROJECT NUMBER: 220014.00
CARMEL HIGH
SCHOOL
NATATORIUM
ADDITION AND
RENOVATIONS
CARMEL CLAY SCHOOLS
520 E MAIN STREET
CARMEL, IN 46032
PROJECT ISSUE DATE: 11.17.2021
REGULATORY REVIEW
DRAWN BY: HHW
317.848.0966
350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204
REV.
NO.DESCRIPTION DATE
CONSULTANT
A TAC SUBMITTAL 11/17/2021
19700317
No.
INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY
ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR
WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR
EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES
SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND
WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE
OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY
ALL CONSTRUCTION.
THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES
EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,
SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND
CAUTION !!
Know what's below.
before you dig.Call
R
Call 811 or 1-800-382-5544 Before You Begin Any Digging Project.
Call 48 hours or 2 working days before you dig.
It's Fast, It's Easy and It's the Law in the state of Indiana!
1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL
LEGEND.
2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN
WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO
GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN
COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN
SERVICE OR ABANDONED.
3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE
PROJECT AREA INCLUDING UNDERGROUND UTILITY
CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE
CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE
ENGINEER.
4.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN
APPROVED STORM WATER MANAGEMENT PERMIT.
5.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE
THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE
RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT
IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE
DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY.
EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN
ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.
6.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL
RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT
THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS
ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY
PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE
EXISTING CONDITION OF THE RIGHT-OF-WAY.
7.REFER TO SITE DETAILS ON SHEETS G4.1 AND G4.2
GENERAL NOTES
PROPOSED SITE LEGEND
EXISTING BUILDING
BUILDING ADDITION
CONCRETE PAVEMENT / WALK
ASPHALT PAVEMENT
LANDSCAPE OR LAWN / TURF AREA
(SEE LANDSCAPE PLAN FOR INFORMATION)