HomeMy WebLinkAboutG1.1_Site Plan NorthTBM#4 = 810.78
PROPOSED NATATORIUM
BUILDING ADDITION
F.F.E.= 831.98
F.F.E.= 831.98
R25.0'25.0'8.0
'8.0'20
.
0
'
T
Y
P
.
R
3
0
.
0
'23.0'EXISTING23.9'
EXISTI
N
G
20.0
'R30.0
'14.0
'12.0'25.0'12.0'8.0'8.0'8.2'R30.0
'
R30.
0'
15
2
1
9
2
16
2
5
7
5
2
2
18
18
18
3
3
3
4
4
4
5
5
5
5
66
6
6
7
6
6
8
8
8
11
11
10
11 10
11
11
25
13
13
7
17
4
18
11
10
4
2
2
3
20
520
11
10
9
1
11
11
11
20.0'8.0
'
4
4
6 20.0'6
5.0'
24
12
6
6
8.0' 21 TYP.
21 TYP.
21 TYP.
21 TYP.
21 TYP.
21 TYP.20.0'12.5'18
18
10 SPA
.
@
9
'
-
0
"
=
9
0
.
0
'
5'
5'
5'
8.0'
8.0'
8.0'
8.0'
8.0'
8.0'
8.0'
8.0'
15 SPA
.
@
9
'
-
0
"
=
1
3
5
.
0
'
15 SPA
.
@
9
'
-
0
"
=
1
3
5
.
0
'
18 SPA
.
@
9
'
-
0
"
=
1
6
2
.
0
'9 SPA. @ 9'-0" = 81.0'20.0'20.0'25.0'20.0'12.5'20.0'
25.0'
19
19
5
3
1
12
5
5
3
15.0'
15.0'
R42.
0'
R30.0'
R3
0
.
0
'R50.0'11.5'
15.0'
8
25.0'
7.2'
103.0'
25.0'
25.0'
30.0'
LANDS
C
A
P
E
B
U
F
F
E
R
25.0'
BUILDI
N
G
S
E
T
B
A
C
K
20 6002040
G1.1
SITE PLAN - NORTH
COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC.
WWW.FHAI.COM
ARCHITECT
PROJECT NUMBER: 220014.00
CARMEL HIGH
SCHOOL
NATATORIUM
ADDITION AND
RENOVATIONS
CARMEL CLAY SCHOOLS
520 E MAIN STREET
CARMEL, IN 46032
PROJECT ISSUE DATE: 11.17.2021
REGULATORY REVIEW
DRAWN BY: HHW
317.848.0966
350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204
REV.
NO.DESCRIPTION DATE
CONSULTANT
A TAC SUBMITTAL 11/17/2021
19700317
No.
INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY
ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR
WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR
EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES
SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND
WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE
OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY
ALL CONSTRUCTION.
THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES
EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES,
SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND
CAUTION !!
Know what's below.
before you dig.Call
R
Call 811 or 1-800-382-5544 Before You Begin Any Digging Project.
Call 48 hours or 2 working days before you dig.
It's Fast, It's Easy and It's the Law in the state of Indiana!
1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL
LEGEND.
2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN
WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO
GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN
COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN
SERVICE OR ABANDONED.
3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE
PROJECT AREA INCLUDING UNDERGROUND UTILITY
CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE
CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE
ENGINEER.
4.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN
APPROVED STORM WATER MANAGEMENT PERMIT.
5.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE
THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE
RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT
IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE
DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY.
EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN
ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE.
6.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL
RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT
THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS
ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY
PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE
EXISTING CONDITION OF THE RIGHT-OF-WAY.
7.REFER TO SITE DETAILS ON SHEETS G4.1, G4.2 AND G4.3
8.THE CONTRACTOR SHALL REMOVE AN ADDITIONAL 12" OF SOIL
BELOW PROPOSED STONE BASE UNDER ALL NEW PAVEMENT.
GENERAL NOTES
SITE KEYNOTES
6" CONCRETE PAVEMENT, SEE DETAIL ON SHEET G4.1
HEAVY DUTY ASPHALT PAVEMENT, SEE DETAIL ON SHEET G4.1
MEDIUM DUTY ASPHALT PAVEMENT, SEE DETAIL ON SHEET G4.1
MONOLITHIC CURB AND WALK, SEE DETAIL ON SHEET G4.1
CONCRETE SIDEWALK, SEE DETAIL ON SHEET G4.1
6" CONCRETE CURB, SEE DETAIL ON SHEET G4.1
CONCRETE ROLL CURB & GUTTER, SEE DETAIL ON SHEET G4.1
CONCRETE ADA CURB RAMP, SEE DETAILS ON SHEET G4.3
CONCRETE SPEED CONTROL TABLE, SEE DETAIL ON SHEET G4.2
LANDSCAPE AREA, SEE LANDSCAPE PLAN SHEET L1.0
LAWN / TURF AREA, SEE LANDSCAPE PLAN SHEET L1.0
RETAINING WALL AT RAMP/WALK, SEE DETAIL ON SHEET G4.2
CONCRETE STEPS WITH HANDRAILS, SEE DETAIL ON SHEET G4.2
CONCRETE ADA RAMP, SEE DETAILS ON SHEET G4.3
RELOCATED 8' CHAIN LINK FENCE
CONCRETE MEDIAN WITH ROLL CURB & GUTTER
GUARDRAIL, SEE DETAIL ON SHEET G4.1
ASPHALT RESURFACE AREA
RELOCATED IRON VEHICLE GATE AND POSTS
STAMPED CONCRETE
CONCRETE PARKING BUMPER, SEE DETAIL ON SHEET G4.1
CONCRETE STEPS WITH 2 RISERS, SEE GRADING PLAN FOR ELEVATIONS
PLANTER WALL, SEE DETAIL ON SHEET G4.2
RETAINING WALL
MODULAR BLOCK RETAINING WALL, SEE DETAIL ON SHEET G4.2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
PROPOSED SITE LEGEND
EXISTING BUILDING
BUILDING ADDITION
CONCRETE PAVEMENT / WALK
ASPHALT PAVEMENT
LANDSCAPE OR LAWN / TURF AREA