Loading...
HomeMy WebLinkAboutG1.1_Site Plan NorthTBM#4 = 810.78 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 R25.0'25.0'8.0 '8.0'20 . 0 ' T Y P . R 3 0 . 0 '23.0'EXISTING23.9' EXISTI N G 20.0 'R30.0 '14.0 '12.0'25.0'12.0'8.0'8.0'8.2'R30.0 ' R30. 0' 15 2 1 9 2 16 2 5 7 5 2 2 18 18 18 3 3 3 4 4 4 5 5 5 5 66 6 6 7 6 6 8 8 8 11 11 10 11 10 11 11 25 13 13 7 17 4 18 11 10 4 2 2 3 20 520 11 10 9 1 11 11 11 20.0'8.0 ' 4 4 6 20.0'6 5.0' 24 12 6 6 8.0' 21 TYP. 21 TYP. 21 TYP. 21 TYP. 21 TYP. 21 TYP.20.0'12.5'18 18 10 SPA . @ 9 ' - 0 " = 9 0 . 0 ' 5' 5' 5' 8.0' 8.0' 8.0' 8.0' 8.0' 8.0' 8.0' 8.0' 15 SPA . @ 9 ' - 0 " = 1 3 5 . 0 ' 15 SPA . @ 9 ' - 0 " = 1 3 5 . 0 ' 18 SPA . @ 9 ' - 0 " = 1 6 2 . 0 '9 SPA. @ 9'-0" = 81.0'20.0'20.0'25.0'20.0'12.5'20.0' 25.0' 19 19 5 3 1 12 5 5 3 15.0' 15.0' R42. 0' R30.0' R3 0 . 0 'R50.0'11.5' 15.0' 8 25.0' 7.2' 103.0' 25.0' 25.0' 30.0' LANDS C A P E B U F F E R 25.0' BUILDI N G S E T B A C K 20 6002040 G1.1 SITE PLAN - NORTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 11.17.2021 REGULATORY REVIEW DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO.DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what's below. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7.REFER TO SITE DETAILS ON SHEETS G4.1, G4.2 AND G4.3 8.THE CONTRACTOR SHALL REMOVE AN ADDITIONAL 12" OF SOIL BELOW PROPOSED STONE BASE UNDER ALL NEW PAVEMENT. GENERAL NOTES SITE KEYNOTES 6" CONCRETE PAVEMENT, SEE DETAIL ON SHEET G4.1 HEAVY DUTY ASPHALT PAVEMENT, SEE DETAIL ON SHEET G4.1 MEDIUM DUTY ASPHALT PAVEMENT, SEE DETAIL ON SHEET G4.1 MONOLITHIC CURB AND WALK, SEE DETAIL ON SHEET G4.1 CONCRETE SIDEWALK, SEE DETAIL ON SHEET G4.1 6" CONCRETE CURB, SEE DETAIL ON SHEET G4.1 CONCRETE ROLL CURB & GUTTER, SEE DETAIL ON SHEET G4.1 CONCRETE ADA CURB RAMP, SEE DETAILS ON SHEET G4.3 CONCRETE SPEED CONTROL TABLE, SEE DETAIL ON SHEET G4.2 LANDSCAPE AREA, SEE LANDSCAPE PLAN SHEET L1.0 LAWN / TURF AREA, SEE LANDSCAPE PLAN SHEET L1.0 RETAINING WALL AT RAMP/WALK, SEE DETAIL ON SHEET G4.2 CONCRETE STEPS WITH HANDRAILS, SEE DETAIL ON SHEET G4.2 CONCRETE ADA RAMP, SEE DETAILS ON SHEET G4.3 RELOCATED 8' CHAIN LINK FENCE CONCRETE MEDIAN WITH ROLL CURB & GUTTER GUARDRAIL, SEE DETAIL ON SHEET G4.1 ASPHALT RESURFACE AREA RELOCATED IRON VEHICLE GATE AND POSTS STAMPED CONCRETE CONCRETE PARKING BUMPER, SEE DETAIL ON SHEET G4.1 CONCRETE STEPS WITH 2 RISERS, SEE GRADING PLAN FOR ELEVATIONS PLANTER WALL, SEE DETAIL ON SHEET G4.2 RETAINING WALL MODULAR BLOCK RETAINING WALL, SEE DETAIL ON SHEET G4.2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 PROPOSED SITE LEGEND EXISTING BUILDING BUILDING ADDITION CONCRETE PAVEMENT / WALK ASPHALT PAVEMENT LANDSCAPE OR LAWN / TURF AREA