Loading...
HomeMy WebLinkAboutG2.0_Overall Grading PlanPROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 834.65 TBM#2 = 834.95 TBM#4 = 810.78 HARROWGATE ADDITIONP.B. 2, PG. 203-205 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 LOT 57 LOT 58 LOT 59 LOT 60 LOT 61 PARCEL 7 PARCEL 8 FH1 FH2 FH4 G FH3 ST-101 ST-401 ST-305 ST-302 ST-102 ST-201 ST-303 ST-301 ST-105 ST-202 ST-402 ST-103 ST-405 ST-404 ST-104 ST-304 ST-406 ST-203 ST-306 ST-501 ST-204 ST-403 ST-502 ST-500 IN ST-500 OUT INSIDE TOP OF CHAMBER = 819.00 2 2 2 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 UNDERGROUND DETENTION BOTTOM OF CHAMBER = 812.00 TOP OF CHAMBER = 819.00 10 YEAR ELEVATION = 815.32 10 YEAR RELEASE RATE = 1.36 CFS 10 YEAR STORAGE VOLUME = 0.084 AC/FT 100 YEAR ELEVATION = 818.22 100 YEAR RELEASE RATE = 1.88 CFS 100 YEAR STORAGE VOLUME = 0.168 AC/FT 2 SAN-1 SAN-2 BENCHMARKS: 40 12004080 G2.0 OVERALL GRADING PLAN COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 11.17.2021 REGULATORY REVIEW DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO.DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what's below. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7.REFER TO UTILITY DETAILS ON SHEETS SU2.1, SU2.2 AND SU2.3 8.REFER TO STORM STRUCTURE TABLE ON SHEET SU2.3 GENERAL NOTES GRADING PLAN LEGEND EXISTING SPOT ELEVATION MATCH EXISTING GRADE TOP OF CURB BOTTOM OF CURB EXISTING CONTOUR W/ ELEVATION PROPOSED CONTOUR W/ ELEVATION PROPOSED SPOT ELEVATION PROPOSED CURB ELEVATION PROPOSED SURFACE DRAINAGE FLOW ARROW FLOOD ROUTING PATH MEG TC BC TC BC 750.65 100 YEAR INLET CASTING CAPACITY ELEVATION TABLE STRUCTURE NUMBER 100 YEAR ELEVATION (INLET 50% CLOGGED) 204 R-3010 NEENAH INLET CASTING TYPE 823.19 TOP OF CASTING ELEVATION 823.38 301 302 303 304 305 403 825.08 825.68 828.09 828.25 825.68 825.71 823.67 824.73 831.63 831.84 822.48 823.14 R-3010 R-3010 R-3010 R-3010 R-3472 R-3010 FLOOD ROUTING KEYNOTES 1.FLOOD ROUTING PATH FOR THE IMPROVEMENTS ON THE NORTH SIDE OF THE PROJECT WHEN 100 YEAR FLOOD IS EXCEEDED. PATH TRAVELS IN A NORTHERLY AND NORTHEASTERLY DIRECTION OVER PROPOSED AND EXISTING INLETS THEN CONTINUES IN A NORTHERLY NORTHWESTERLY DIRECTION TO STADIUM DRIVE THEN CONTINUES NORTHERLY TO EXISTING INLETS LOCATED ON THE NORTH SIDE OF THE BRIDGE OVER COOL CREEK. 2.FLOOD ROUTING PATH FOR THE IMPROVEMENTS ON THE EAST SIDE OF THE PROJECT WHEN 100 YEAR FLOOD IS EXCEEDED. PATH TRAVELS FROM THE EAST SIDE DRIVE AND THEN TRAVELS IN A NORTHERLY DIRECTION OVER MULTIPLE EXISTING CURB INLETS LOCATED ON THE EAST SIDE OF THE DRIVE. EVENTUALLY GRADE LEVELS OUT ON THE EAST DRIVE NEAR THE NORTHEAST CORNER OF THE HIGH SCHOOL BUILDING AND IF PONDING DEPTH EXCEEDS SIX INCHES FLOOD ROUTING PATH WILL OVERTOP CURB AND TRAVEL EAST TO A EXISTING SWALE AND THEN TRAVEL NORTH IN THE SWALE TO COOL CREEK.