Loading...
HomeMy WebLinkAboutSU1.2_Utility Plan SouthLOT 52 LOT 53 LOT 54 LOT 55 LOT 56 PARCEL 7 PROPOSED NATATORIUM BUILDING ADDITION F.F.E.= 831.98 F.F.E.= 831.98 F.F.E.= 834.65 LOT 52 LOT 53 LOT 54 LOT 55 LOT 56 PARCEL 7 FH1 FH4 G PROPOSED NATURAL GAS SERVICE LINE IS FROM EXISTING GAS MAIN LOCATED WITHIN MAIN STREET RIGHT-OF-WAY (SEE SHEET SU1.3 FOR MORE INFORMATION). COORDINATE WITH CENTERPOINT ENERGY. ST-401 RIM. = 832.72' INV. 826.02 (N) INV. 828.48 (E) INV. 827.65 (SW) ST-305 RIM. = 831.63' INV. 819.99 (S) INV. 819.53 (N) INV. 827.88 (W) INV. 820.88 (SW) ST-101 RIM. = 833.26' INV. 824.68 (E) ST-201 RIM. = 825.75' INV. 821.08 (N) INV. 821.58 (W) INV. 821.58 (SW) ST-102 RIM. = 828.00' INV. 823.58 (W) INV. 823.48 (NE) ST-202 RIM. = 824.34' INV. 820.34 (S) INV. 818.84 (E) INV. 820.34 (N) ST-203 RIM. = 823.45' INV. 818.74 (W) INV. 818.74 (E) ST-103 RIM. = 823.81' INV. 819.54 (SW) INV. 819.44 (N) RIM. = 823.73' INV. 815.32 (S) INV. 815.22 (N) ST-204 RIM. = 823.19' INV. 818.68 (W) INV. 816.98 (E) 4 5 1 3 3 4 13 13 15 16 6 19 2 EXISTING POOL UNDERDRAIN 11 14 19 17 8 10 9 20 2 INV.= 819.90 2 10 9 8 8 8 8 12 10" SAN. LATERAL INV.= 825.31 6" SAN. LATERAL INV.= 819.98 7 7 7 2 22 21 8 8 8 24 SU1.2 UTILITY PLAN - SOUTH COPYRIGHT 2021 BY FANNING/HOWEY ASSOCIATES, INC. WWW.FHAI.COM ARCHITECT PROJECT NUMBER: 220014.00 CARMEL HIGH SCHOOL NATATORIUM ADDITION AND RENOVATIONS CARMEL CLAY SCHOOLS 520 E MAIN STREET CARMEL, IN 46032 PROJECT ISSUE DATE: 11.17.2021 REGULATORY REVIEW DRAWN BY: HHW 317.848.0966 350 E NEW YORK ST #300, INDIANAPOLIS, IN 46204 REV. NO.DESCRIPTION DATE CONSULTANT A TAC SUBMITTAL 11/17/2021 19700317 No. INLETS, VALVES, AND MARKS MADE UPON THE GROUND BY ALSO BE OTHER EXISTING UNDERGROUND UTILITIES FOR WHICH THERE IS NO ABOVE GROUND EVIDENCE OR FOR EXACT LOCATIONS OF EXISTING UNDERGROUND UTILITIES SHALL BE VERIFIED BY CONTRACTOR PRIOR TO ANY AND WHICH NO ABOVE GROUND EVIDENCE WAS OBSERVED. THE OTHERS) AND ARE SPECULATIVE IN NATURE. THERE MAY ALL CONSTRUCTION. THE LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES EVIDENCE (INCLUDING, BUT NOT LIMITED TO, MANHOLES, SHOWN ON THE PLAN ARE BASED UPON ABOVE GROUND CAUTION !! Know what's below. before you dig.Call R Call 811 or 1-800-382-5544 Before You Begin Any Digging Project. Call 48 hours or 2 working days before you dig. It's Fast, It's Easy and It's the Law in the state of Indiana! 20 6002040 1.SEE DRAWING GD0.1 FOR GENERAL NOTES AND ADDITIONAL LEGEND. 2.TOPOGRAPHIC CONDITIONS AND EXISTING UTILITIES SHOWN WERE PROVIDED BY THE SURVEYOR. THE ENGINEER MAKES NO GUARANTEES THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE AREA, EITHER IN SERVICE OR ABANDONED. 3.CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN THE PROJECT AREA INCLUDING UNDERGROUND UTILITY CONDITIONS, LOCATION AND DEPTH PRIOR TO ANY OTHER SITE CONSTRUCTION. REPORT ANY DISCREPANCIES TO THE ENGINEER. 4.NO EARTH DISTURBING ACTIVITY MAY COMMENCE WITHOUT AN APPROVED STORM WATER MANAGEMENT PERMIT. 5.UTILITY RELOCATIONS REQUIRED BY THE PROJECT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER. UTILITY LINE RELOCATIONS REQUIRED FOR ROAD PROJECTS THAT RESULT IN A CONFLICT WITH PROPOSED DEVELOPMENT SHALL BE THE DEVELOPERS RESPONSIBILITY TO RESOLVE WITH THE UTILITY. EXISTING POLE LINES REQUIRED TO BE RELOCATED TO WITHIN ONE FOOT OF PROPOSED RIGHT-OF-WAY LINE. 6.DAMAGE TO THE EXISTING RIGHT-OF-WAY SHALL RESTORED/REPAIRED TO THE SATISFACTION OF THE CITY AT THE COMPLETION OF THE PROJECT. THE CONTRACTOR IS ENCOURAGED TO INSPECT THE RIGHT-OF-WAY WITH THE CITY PRIOR TO THE START OF CONSTRUCTION TO DOCUMENT THE EXISTING CONDITION OF THE RIGHT-OF-WAY. 7.REFER TO UTILITY DETAILS ON SHEETS SU2.1, SU2.2, SU2.3, SU2.4, SU2.5 AND SU2.6 8.REFER TO STORM STRUCTURE TABLE ON SHEET SU2.3 GENERAL NOTES UTILITY LEGEND NEW STORM SEWER LINE NEW FIRE PROTECTION LINE NEW SANITARY LATERAL LINE NEW NATURAL GAS LINE EXISTING STORM LINE EXISTING WATER LINE EXISTING SANITARY LINE EXISTING ELECTRICAL LINE NEW UNDERDRAIN OR UTILITY KEYNOTES 1.10" PVC SANITARY LATERAL @ 1.50% MIN. SLOPE 2.PROPOSED CLEANOUT 3.8" FIRE PROTECTION LINE @ 5' MIN. DEPTH 4.CONNECT 8" FIRE PROTECTION LINE TO EXISTING WATER/FIRE PROTECTION LINE 5.PRE-CAST CONC. VAULT WITH PIV, FDC, DOUBLE CHECK VALVE FOR FIRE PROTECTION AND WATER METER FOR DOMESTIC WATER SERVICE 6.PROPOSED WATER VALVE 7.CONNECT EXIST. STORM SEWER PIPE(S) TO NEW STORM STRUCTURE. 8.DOWNSPOUT BOOT. CONNECT TO STORM SEWER MAINLINE WITH WYE CONNECTION. 9.6" PVC ROOF DRAIN (COORDINATE LOCATION WITH M.E.P. PLANS) 10.8" PVC ROOF DRAIN (COORDINATE LOCATION WITH M.E.P. PLANS) 11.EXISTING LIFT STATION 12.DRY SYSTEM FIRE PROTECTION (COORDINATE WITH M.E.P. PLANS) 13.PROPOSED NATURAL GAS LINE 14.NATURAL GAS SERVICE AND METER (COORDINATE WITH M.E.P. PLANS) 15.4" DOMESTIC WATER SERVICE (COORDINATE WITH M.E.P. PLANS) 16.6" FIRE PROTECTION SERVICE (COORDINATE WITH M.E.P. PLANS) 17.PROPOSED 6" FIRE HYDRANT AND VALVE ASSEMBLY 18.PROPOSED LIGHT POLE 19.PROPOSED LIGHT BOLLARD 20.10" DUCTILE IRON PIPE @ 2.0% SLOPE FROM EXISTING LIFT STATION 21.6" HDPE STORM LINE @ 1.0% MIN. SLOPE 22.8" HDPE STORM LINE @ 3.0% MIN. SLOPE 23.10" HDPE STORM LINE @ 1.0% MIN. SLOPE 24.PAVEMENT UNDERDRAIN 25.UNDERGROUND DETENTION SYSTEM, SEE DETAILS ON SHEET SU2.4 26.CONNECT 6" BUILDING UNDERDRAIN TO NEW 6" HDPE @ INVERT 817.98, COORDINATE WITH M.E.P. PLANS. 27.CONNECT (CORE DRILL) 6" HDPE TO NEW MANHOLE STRUCTURE @ INVERT 817.60