Loading...
HomeMy WebLinkAboutD101 Demolition1 2 55 5 5 5 6 6 3 3 7 7 7 7 7 7 7 7 7 4 4 4 4 6 6 8 8 7 7 5 GENERAL DEMO NOTES A. DASHED LINES INDICATE EXISTING ITEMS TO BE REMOVED. UNLESS NOTED OTHERWISE CONTRACTOR SHALL BE RESPONSIBLE FOR THE OFF-SITE DISPOSAL OF ALL DEMOLITION ITEMS. B. RELOCATED ITEMS SHALL BE CLEANED AND PLACED IN STORAGE, PER OWNERS DIRECTIONS UNTIL ITEMS ARE READY TO BE REINSTALLED. IF ITEM IS DAMAGED DURING DEMOLITION OR RELOCATION IT SHALL BE REPAIRED OR REPLACED WITH NEW ITEM AS APPROVED BY OWNER AT NO EXPENSE TO OWNER. C. DEMOLITION SHALL BE DONE WITHOUT DAMAGE TO EXISTING CONSTRUCTION TO REMAIN. WHERE SUCH DAMAGE OCCURS PATCH, REPAIR, OR RESTORE WALLS, FLOORS, CEILINGS, ETC., TO MATCH EXISTING. PROVIDE SHORING, BRACING, OR SUPPORT AS REQUIRED TO PREVENT MOVEMENT OR SETTLEMENT OF EXISTING CONSTRUCTION. D. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF DEMOLITION ITEMS WITH THE OTHER TRADES PRIOR TO THE START OF DEMO WORK. E. REMOVE ALL EXISTING CONSTRUCTION, ITEMS AND FINISHES MADE OBSOLETE BY, OR IN CONFLICT WITH NEW CONSTRUCTION, VERIFY WITH ARCHITECT. REMOVE WIRING BACK TO SOURCE AT ALL OUTLETS ETC., MADE OBSOLETE BY WALL REMOVAL OR ANY OTHER NEW CONSTRUCTION. F. WHERE EXISTING WALLS, BULKHEADS, OR FINISHES ARE REMOVED OR PARTIALLY DEMOLISHED, EACH TRADE SHALL BE RESPONSIBLE FOR PATCHING OR REFINISHING OF EXISTING CONSTRUCTION REQUIRED BY THAT TRADES WORK ON THIS PROJECT. THIS WORK MUST BE DONE IN A MANNER WHICH WILL ACCEPT NEW FINISHES. G. ALL CONTRACTORS ARE RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILING GRID AND/OR TILES IN ANY AREA WHERE THEY NEED ACCESS AND THE EXISTING CEILING IS TO REMAIN. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL REPLACE ANY CEILING TILES OR GRID DAMAGED IN THIS PROCESS. H. AT THE OWNER'S REQUEST SALVAGED ITEMS SHALL BE TURNED OVER TO THE OWNER OR STORED IN AN AREA DESIGNATED BY THE OWNER. I. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE DEMOLISHED ARE APPROXIMATE AND ARE INTENDED TO GIVE A GENERAL IDEA OF WORK TO BE REMOVED OR WORK TO BE TEMPORARILY REMOVED IN ORDER TO COMPLETE NEW CONSTRUCTION. COORDINATE DEMOLITION WORK WITH DESIGN INTENT OF NEW CONSTRUCTION TO PROVIDE ADEQUATE AREA FOR THIS WORK. J. CONTRACTOR MUST FIELD VERIFY ALL AREAS AND/OR WORK TO BE DEMOLISHED PRIOR TO BEGINNING WORK. CONTRACTOR MUST COORDINATE WITH ARCHITECT ANY DIFFERENCES BETWEEN FIELD VERIFIED CONDITIONS AND/OR CONSTRUCTION, AND WHAT IS SHOWN ON DEMOLITION DRAWINGS. K. PRIOR TO BEGINNING DEMOLITION, DUST CONTROL BARRIERS SHALL BE CONSTRUCTED TO PREVENT THE SPREAD OF DUST INTO SURROUNDING AREAS. L. EXITING FROM STRUCTURE, IF REQUIRED TO PASS THROUGH DEMOLITION AREA(S), SHALL HAVE APPROVED BARRIERS ETC., TO INSURE SAFETY OF PUBLIC. M. WHEN APPLICABLE, REFER TO STRUCTURAL, MECHANICAL, ELECTRICAL AND PLUMBING DEMO DRAWINGS FOR ADDITIONAL DEMOLITION REQUIREMENTS AND INFORMATION. N. REMOVE AND REINSTALL ALL EQUIPMENT OR CONSTRUCTION ON WALLS REQUIRING NEW FINISHES. O. REFINISH ENTIRE SURFACES AS NECESSARY TO PROVIDE AN EVEN FINISH. REFINISH ENTIRE ASSEMBLIES. CONTINUOUS SURFACES WILL BE TAKEN TO THE NEAREST INTERSECTION. P. REMOVE ALL DIRT, DUST, DEBRIS ETC., DAILY. DO NOT ALLOW REFUSE TO BLOCK CORRIDORS, STAIRS, OR ANY OTHER TRAFFIC AREA. Q. ALL ABANDONED PLUMBING LINES TO BE CAPPED OFF AND TERMINATED BELOW FINISH FLOOR. KEYED NOTES 1. REMOVE EXISTING WALL, THIS AREA, AS SHOWN. PATCH AND REPAIR AS REQUIRED. SEE A101 FOR INFORMATION ON EXTENTS OF WALL REMOVAL. 2. REMOVE EXISTING VESTIBULE, AS SHOWN. PATCH AND REPAIR AS REQUIRED. SALVAGE EXISTING DOORS FOR RE-USE AS REQUIRED BY OWNER. 3. REMOVE RESTROOM FIXTURES AND ACCESSORIES. REMOVE FLOORING IN RESTROOM AND PREP SLAB FOR NEW FLOORING. REMOVE TILE FROM WALL AND PREP WALL FOR NEW TILE. 4. NO DEMOLITION WORK, THIS FLOOR, U.N.O. G.C. TO PROTECT THIS FLOOR DURING CONSTRUCTION. 5. REMOVE FLOORING, THIS AREA, AND PREP SLAB FOR NEW FLOORING. SEE FINISH PLAN FOR FULL EXTENTS OF REMOVAL. 6. REMOVE CARPET FROM STAIR AND PREP TREADS FOR NEW CARPET. 7. G.C. TO REMOVE EXISTING DOOR AND PREP FRAME FOR NEW DOOR. SALVAGE EXISTING DOOR FOR RE-USE BY CLIENT AS REQUESTED. 8. REMOVE FLOORING IN RESTROOM AND PREP SLAB FOR NEW FLOORING. REMOVE TILE FROM WALL AND PREP WALL FOR NEW TILE. REMOVE FIXTURES, PARTITIONS, ETC AS REQUIRED FOR FLOOR AND WALL TILE REMOVAL. REINSTALL IN SOME LOCATIONS. KEY PLAN PERMIT SET 09.16.21 PROJECT NUMBER: 210082 THIS DRAWING AND THE IDEAS, DESIGNS AND CONCEPTS CONTAINED HEREIN ARE THE EXCLUSIVE INTELLECTUAL PROPERTY OF CURRAN ARCHITECTURE, AND ARE NOT TO BE USED OR REPRODUCED, WHOLE OR IN PART, WITHOUT THE WRITTEN CONSENT OF CURRAN ARCHITECTURE. COPYRIGHT 2020, CURRAN ARCHITECTUREC PROJECT INFORMATION CERTIFICATION ISSUE DATES F :: 317 . 288 . 0753 O :: 317 . 288 . 0681 INDIANAPOLIS, IN 46216 5719 LAWTON LOOP E. DR. #212 TENANT IMPROVEMENTS 1717 E. 116TH STREET, CARMEL 1717 E. 116TH STREET, CARMEL, INDIANA 46032 N DEMOLITION PLAN D101 1FIRST FLOOR DEMOLITION PLAN 1/8"=1'-0"N 2SECOND FLOOR DEMOLITION PLAN 1/8"=1'-0"N 01/19/22