HomeMy WebLinkAboutD101 Demolition1
2
55 5
5
5
6
6
3
3
7 7
7 7 7 7 7
7
7
4
4
4 4
6
6
8
8
7
7
5
GENERAL DEMO NOTES
A. DASHED LINES INDICATE EXISTING ITEMS TO BE REMOVED. UNLESS
NOTED OTHERWISE CONTRACTOR SHALL BE RESPONSIBLE FOR
THE OFF-SITE DISPOSAL OF ALL DEMOLITION ITEMS.
B. RELOCATED ITEMS SHALL BE CLEANED AND PLACED IN STORAGE,
PER OWNERS DIRECTIONS UNTIL ITEMS ARE READY TO BE
REINSTALLED. IF ITEM IS DAMAGED DURING DEMOLITION OR
RELOCATION IT SHALL BE REPAIRED OR REPLACED WITH NEW
ITEM AS APPROVED BY OWNER AT NO EXPENSE TO OWNER.
C. DEMOLITION SHALL BE DONE WITHOUT DAMAGE TO EXISTING
CONSTRUCTION TO REMAIN. WHERE SUCH DAMAGE OCCURS
PATCH, REPAIR, OR RESTORE WALLS, FLOORS, CEILINGS, ETC., TO
MATCH EXISTING. PROVIDE SHORING, BRACING, OR SUPPORT AS
REQUIRED TO PREVENT MOVEMENT OR SETTLEMENT OF EXISTING
CONSTRUCTION.
D. CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION
OF DEMOLITION ITEMS WITH THE OTHER TRADES PRIOR TO THE
START OF DEMO WORK.
E. REMOVE ALL EXISTING CONSTRUCTION, ITEMS AND FINISHES
MADE OBSOLETE BY, OR IN CONFLICT WITH NEW
CONSTRUCTION, VERIFY WITH ARCHITECT. REMOVE WIRING
BACK TO SOURCE AT ALL OUTLETS ETC., MADE OBSOLETE BY
WALL REMOVAL OR ANY OTHER NEW CONSTRUCTION.
F. WHERE EXISTING WALLS, BULKHEADS, OR FINISHES ARE REMOVED
OR PARTIALLY DEMOLISHED, EACH TRADE SHALL BE RESPONSIBLE
FOR PATCHING OR REFINISHING OF EXISTING CONSTRUCTION
REQUIRED BY THAT TRADES WORK ON THIS PROJECT. THIS
WORK MUST BE DONE IN A MANNER WHICH WILL ACCEPT NEW
FINISHES.
G. ALL CONTRACTORS ARE RESPONSIBLE FOR REMOVAL AND
REPLACEMENT OF CEILING GRID AND/OR TILES IN ANY AREA
WHERE THEY NEED ACCESS AND THE EXISTING CEILING IS TO
REMAIN. UNLESS OTHERWISE NOTED, CONTRACTOR SHALL
REPLACE ANY CEILING TILES OR GRID DAMAGED IN THIS PROCESS.
H. AT THE OWNER'S REQUEST SALVAGED ITEMS SHALL BE TURNED
OVER TO THE OWNER OR STORED IN AN AREA DESIGNATED BY
THE OWNER.
I. DIMENSIONS SHOWN FOR EXISTING CONSTRUCTION TO BE
DEMOLISHED ARE APPROXIMATE AND ARE INTENDED TO GIVE A
GENERAL IDEA OF WORK TO BE REMOVED OR WORK TO BE
TEMPORARILY REMOVED IN ORDER TO COMPLETE NEW
CONSTRUCTION. COORDINATE DEMOLITION WORK WITH
DESIGN INTENT OF NEW CONSTRUCTION TO PROVIDE
ADEQUATE AREA FOR THIS WORK.
J. CONTRACTOR MUST FIELD VERIFY ALL AREAS AND/OR WORK TO
BE DEMOLISHED PRIOR TO BEGINNING WORK. CONTRACTOR
MUST COORDINATE WITH ARCHITECT ANY DIFFERENCES
BETWEEN FIELD VERIFIED CONDITIONS AND/OR CONSTRUCTION,
AND WHAT IS SHOWN ON DEMOLITION DRAWINGS.
K. PRIOR TO BEGINNING DEMOLITION, DUST CONTROL BARRIERS
SHALL BE CONSTRUCTED TO PREVENT THE SPREAD OF DUST
INTO SURROUNDING AREAS.
L. EXITING FROM STRUCTURE, IF REQUIRED TO PASS THROUGH
DEMOLITION AREA(S), SHALL HAVE APPROVED BARRIERS ETC., TO
INSURE SAFETY OF PUBLIC.
M. WHEN APPLICABLE, REFER TO STRUCTURAL, MECHANICAL,
ELECTRICAL AND PLUMBING DEMO DRAWINGS FOR ADDITIONAL
DEMOLITION REQUIREMENTS AND INFORMATION.
N. REMOVE AND REINSTALL ALL EQUIPMENT OR CONSTRUCTION
ON WALLS REQUIRING NEW FINISHES.
O. REFINISH ENTIRE SURFACES AS NECESSARY TO PROVIDE AN EVEN
FINISH. REFINISH ENTIRE ASSEMBLIES. CONTINUOUS SURFACES
WILL BE TAKEN TO THE NEAREST INTERSECTION.
P. REMOVE ALL DIRT, DUST, DEBRIS ETC., DAILY. DO NOT ALLOW
REFUSE TO BLOCK CORRIDORS, STAIRS, OR ANY OTHER TRAFFIC
AREA.
Q. ALL ABANDONED PLUMBING LINES TO BE CAPPED OFF AND
TERMINATED BELOW FINISH FLOOR.
KEYED NOTES
1. REMOVE EXISTING WALL, THIS AREA, AS SHOWN. PATCH AND
REPAIR AS REQUIRED. SEE A101 FOR INFORMATION ON EXTENTS
OF WALL REMOVAL.
2. REMOVE EXISTING VESTIBULE, AS SHOWN. PATCH AND REPAIR AS
REQUIRED. SALVAGE EXISTING DOORS FOR RE-USE AS REQUIRED
BY OWNER.
3. REMOVE RESTROOM FIXTURES AND ACCESSORIES. REMOVE
FLOORING IN RESTROOM AND PREP SLAB FOR NEW FLOORING.
REMOVE TILE FROM WALL AND PREP WALL FOR NEW TILE.
4. NO DEMOLITION WORK, THIS FLOOR, U.N.O. G.C. TO PROTECT
THIS FLOOR DURING CONSTRUCTION.
5. REMOVE FLOORING, THIS AREA, AND PREP SLAB FOR NEW
FLOORING. SEE FINISH PLAN FOR FULL EXTENTS OF REMOVAL.
6. REMOVE CARPET FROM STAIR AND PREP TREADS FOR NEW
CARPET.
7. G.C. TO REMOVE EXISTING DOOR AND PREP FRAME FOR NEW
DOOR. SALVAGE EXISTING DOOR FOR RE-USE BY CLIENT AS
REQUESTED.
8. REMOVE FLOORING IN RESTROOM AND PREP SLAB FOR NEW
FLOORING. REMOVE TILE FROM WALL AND PREP WALL FOR NEW
TILE. REMOVE FIXTURES, PARTITIONS, ETC AS REQUIRED FOR
FLOOR AND WALL TILE REMOVAL. REINSTALL IN SOME
LOCATIONS.
KEY PLAN
PERMIT SET 09.16.21
PROJECT NUMBER: 210082
THIS DRAWING AND THE IDEAS, DESIGNS
AND CONCEPTS CONTAINED HEREIN ARE
THE EXCLUSIVE INTELLECTUAL PROPERTY
OF CURRAN ARCHITECTURE, AND ARE NOT
TO BE USED OR REPRODUCED, WHOLE OR
IN PART, WITHOUT THE WRITTEN
CONSENT OF CURRAN ARCHITECTURE.
COPYRIGHT 2020, CURRAN ARCHITECTUREC
PROJECT INFORMATION
CERTIFICATION
ISSUE DATES
F :: 317 . 288 . 0753
O :: 317 . 288 . 0681
INDIANAPOLIS, IN 46216
5719 LAWTON LOOP E. DR. #212
TENANT IMPROVEMENTS
1717 E. 116TH STREET,
CARMEL
1717 E. 116TH STREET, CARMEL,
INDIANA 46032
N
DEMOLITION PLAN
D101
1FIRST FLOOR DEMOLITION PLAN
1/8"=1'-0"N
2SECOND FLOOR DEMOLITION PLAN
1/8"=1'-0"N
01/19/22