Loading...
HomeMy WebLinkAboutGALLAGHER PERMIT SET A203D E F G H I J ELEVATOR 6A ELEVATOR 6B STAIR 6A ELEVATOR 6C ELEVATOR LOBBY ELEC. STORAGE JAN. CORRIDOR MEN RESTROOM WOMEN RESTROOM STAIR 6B SHARED BALCONY 18" CLEAR12"CLEAR18"CLEARTENANT FUTURE 209 CORRIDOR 214 OFFICE 6 206 OFFICE 5 205 ENTRY 200 ROOM CONFERENCE 209 HUDDLE ROOM 213 OFFICE 3 203 OFFICE 4 204 COLLABORATION SPACE PANTRY/ 210 BRANCH MANAGER 216 OFFICE 1 217 OFFICE 2 219 CLOSET 220ROOM MEETING 218 ROOM INTERVIEW 201 CLOSET 202 OFFICE 2 OPEN 211 OFFICE 1 OPEN 215 CLOSET 207 ROOM COPY 221 ROOM DATA 208 BRANCH MANAGER 212 CORRIDOR 222 A203FIRST LEVEL FINISH PLANFIRST LEVEL FINISH PLANCONSTRUCTIONNOT FORT. JOLLY2110202021-12-29CONTACT(YYYY-MM-DD)CONSULTANTTITLE: DRAWING NO. (YYYY-MM-DD)DATEREV.DESCRIPTIONPROJECT:DATETITLE:CERTIFIED BY:CONSULTANTJOB NUMBERSHEET OFTELEPHONE:LAUTH GROUP, INC.PROJECT:CONTACT:PROJECT NUMBER:STATE NUMBER:E-MAIL:FAX:GALLAGHERAGORA OFFICE BUILDING10 WEST CARMEL DRIVE, SUITE 240CARMEL, IN 46032THE RENAISSANCE GROUPKEN STROKE317.848.6500317.848.6511KSTROKE@LAUTH.NET8555 North River Road .Suite 220 . Indianapolis . Indiana . 46240[p] 317. 842.8500 [f] 317.842.88772021-12-221PROPOSED CHANGE #1FINISH REMARKS COLUMN ROOM NAME ROOM NUMBER ACT - ACOUSTICAL CEILING TILE CPT - CARPET EB - EDGEBAND G - GROUT P - PAINT PL - PLASTIC LAMINATE RB - RESILIENT BASE SS - SOLID SURFACE T - TILE TEX - TEXTILE VCT - VINYL COMPOSITE TILE VESTIBULE 101 - - - GENERAL FINISH PLAN NOTES FINISH PLAN NOTES FINISH REMARKS FINISH LEGEND FINISH MATERIALS SCHEDULE A. REFERENCE REFLECTED CEILING PLAN FOR NOTES REGARDING ACOUSTICAL CEILING GRID TILES. B. ALL PAINT TO BE BENJAMIN MOORE. C. ALL FLOORING TRANSITIONS SHALL OCCUR BENEATH THE CLOSED DOOR. PROVIDE TRANSITION STRIPS PER MANUFACTURER'S STANDARDS. D. PREPARE FLOORS TO RECEIVE SPECIFIED FLOOR FINISHES. GRIND ALL HIGH AREAS AND FILL LOW AREAS WITH LATEX CEMENT. REMOVE OLD ADHESIVE THAT WILL PROHIBIT THE ADHESIONS OF NEW FINISHES. E. ALL P2 LOCATIONS TO RECEIVE RB1, ALL P3 LOCATIONS TO RECEIVE RB2 UNLESS NOTED OTHERWISE. F. PROVIDE WHITE COVER PLATES, SWITCHES AND RECEPTACLES. G. ALL WALLS TO BE PAINTED P2. ALL ACCENT WALLS TO BE PAINTED P3. H. CEILING PAINT TO BE P1. I. PAINT ALL EXPOSED CEILING ELEMENTS (STEEL JOISTS, STRUCTURAL DECK, DUCTWORK, PIPING, ETC) TO BE P1. ALIGN FLOOR PATTERN WITH CEILING BULKHEAD ABOVE. ALL CABINETS TO BE PL1. REFERENCE INTERIOR ELEVATIONS FOR ADDITIONAL INFORMATION. ALL COUNTERTOPS TO BE PL2 REFERENCE INTERIOR ELEVATION FOR ADDITIONAL INFORMATION. 1 2 1. FLOOR FINISH VARIES. 2. CEILING FINISH VARIES. REFERENCE REFLECTED CEILING PLAN FOR ADDITIONAL INFORMATION. 3. WALL FINISH VARIES. REFERENCE INTERIOR ELEVATIONS FOR ADDITIONAL INFORMATION. 4. EPOXY PAINT TO BE USED IN KITCHEN AREAS, TOILET ROOMS, AND ALL "WET" AREAS. FLOOR FINISH CEILING FINISH WALL FINISH MATERIAL CONTACTMANUFACTURER COLOR #PATTERN NAME; COLOR NAME SHAW 802T3-AJG-69557CPT1 CPT2 LVT1 SHAW RB1 JOHNSONITE 01 (4") RB2 JOHNSONITE 21 P1 2143-70 P2 BENJAMIN MOORE OC-17 P3 BENJAMIN MOORE 2134-50 ACT1 PHILIP CAITO 317.519.2829 ARMSTRONG 1714 DUNE, 2X2 WHITE PL1 PIONITE SG228 SHAW BENJAMIN MOORE EB1 DOELLKEN- WOODTAPE 2020 ARTHUR GALLAGHERMODULAR TILE; MONOLITHIC INSTALL SIMPLY WHITE WHITE DOVE; EGGSHELL FINISH GULL WING GRAY; EGGSHELL FINISH SLATE; SUEDE FINISH NEUTRAL WHITE; 3MM 802T4-AJG-06597 MODULAR TILE; MONOLITHIC INSTALL AJG-LVT1; 02500 PL2 FORMICA 918-58 NEUTRAL WHITE; MATTE FINISH VCT1 ARMSTRONG 51950 STATIC DISSIPATIVE TILE; MARBLE BEIGE PLATINUM SNOW WHITE ARTHURGALLAGHER@ SHAWINC.COM ARTHUR GALLAGHER ARTHURGALLAGHER@ SHAWINC.COM ARTHUR GALLAGHERARTHURGALLAGHER@SHAWINC.COMLUXURY VINYL TILE 3 A203 Scale: 1/8" = 1'-0" KEY PLAN - SECOND LEVEL NORTH PROJECT LOCATION NORTHFLOOR TILE - REFERENCE FINISH PLAN REDUCER/TRANSITION STRIP DIRECT GLUE-DOWN CARPET FLOOR TILE - REFERENCE FINISH PLAN SLOP CEMENTITIOUS MORTAR 1/4" PER FT. MINIMUM. DIRECT GLUE-DOWN CARPET WANNINGTON RUBBER TRANSITION STRIP - BLACK 2 1 02 A203 TYPICAL FLOOR TRANSITION DETAIL NOT TO SCALE 01 SECOND LEVEL FINISH PLAN -CPT1 -P2 -ACT1 -LVT1 -P2 -ACT1 23 CPT1LVT1CPT1LVT1LVT1CPT1 -CPT2 3P2,P3 -ACT1-CPT2 3P2,P3 -ACT1 -CPT2 3P2,P3 -ACT1 -CPT2 3P2,P3 -ACT1 CPT1CPT2CPT1CPT2CPT1CPT2 -CPT1 -P2 -ACT1 CPT1CPT2-CPT1 -P2 -ACT1 -CPT1 -P2 -ACT1 -CPT2 3P2,P3 -ACT1 -CPT2 3P2,P3 -ACT1 - CPT2 3P2,P3 -ACT1 -CPT2 3P2,P3 -ACT1 -VCT1 -P2 -ACT1-CPT1 -P2 -ACT1 -CPT2 -P2 -ACT1 -LVT1 -P2 -ACT1 -CPT1 -P2 -ACT1 -CPT2 -P2 -ACT1-CPT2 -P2 -ACT1 -CPT1 -P2 -ACT1CPT1CPT2 CPT2CPT1CPT2CPT1CPT1CPT2CPT1LVT1CPT2CPT1 CPT1VCT1CPT1CPT2 CPT1CPT2 -CPT1 -P2 -ACT1 P3 P3 P3P3P3 -CPT1 -P2 -ACT1P3P3P3 01/24/22