HomeMy WebLinkAboutGALLAGHER PERMIT SET A203D E F G H I J
ELEVATOR 6A
ELEVATOR 6B
STAIR 6A
ELEVATOR 6C
ELEVATOR LOBBY
ELEC.
STORAGE
JAN.
CORRIDOR
MEN RESTROOM
WOMEN RESTROOM
STAIR 6B
SHARED BALCONY
18"
CLEAR12"CLEAR18"CLEARTENANT
FUTURE
209
CORRIDOR
214
OFFICE 6
206
OFFICE 5
205
ENTRY
200
ROOM
CONFERENCE
209
HUDDLE ROOM
213
OFFICE 3
203
OFFICE 4
204
COLLABORATION SPACE
PANTRY/
210
BRANCH MANAGER
216
OFFICE 1
217
OFFICE 2
219
CLOSET
220ROOM
MEETING
218
ROOM
INTERVIEW
201
CLOSET
202
OFFICE 2
OPEN
211
OFFICE 1
OPEN
215
CLOSET
207
ROOM
COPY
221
ROOM
DATA
208
BRANCH MANAGER
212
CORRIDOR
222
A203FIRST LEVEL FINISH PLANFIRST LEVEL FINISH PLANCONSTRUCTIONNOT FORT. JOLLY2110202021-12-29CONTACT(YYYY-MM-DD)CONSULTANTTITLE:
DRAWING NO. (YYYY-MM-DD)DATEREV.DESCRIPTIONPROJECT:DATETITLE:CERTIFIED BY:CONSULTANTJOB NUMBERSHEET OFTELEPHONE:LAUTH GROUP, INC.PROJECT:CONTACT:PROJECT NUMBER:STATE NUMBER:E-MAIL:FAX:GALLAGHERAGORA OFFICE BUILDING10 WEST CARMEL DRIVE, SUITE 240CARMEL, IN 46032THE RENAISSANCE GROUPKEN STROKE317.848.6500317.848.6511KSTROKE@LAUTH.NET8555 North River Road .Suite 220 . Indianapolis . Indiana . 46240[p] 317. 842.8500 [f] 317.842.88772021-12-221PROPOSED CHANGE #1FINISH REMARKS
COLUMN
ROOM NAME
ROOM NUMBER
ACT - ACOUSTICAL CEILING TILE
CPT - CARPET
EB - EDGEBAND
G - GROUT
P - PAINT
PL - PLASTIC LAMINATE
RB - RESILIENT BASE
SS - SOLID SURFACE
T - TILE
TEX - TEXTILE
VCT - VINYL COMPOSITE TILE
VESTIBULE
101
-
-
-
GENERAL FINISH PLAN NOTES
FINISH PLAN NOTES
FINISH REMARKS
FINISH LEGEND
FINISH MATERIALS SCHEDULE
A. REFERENCE REFLECTED CEILING PLAN FOR NOTES
REGARDING ACOUSTICAL CEILING GRID TILES.
B. ALL PAINT TO BE BENJAMIN MOORE.
C. ALL FLOORING TRANSITIONS SHALL OCCUR BENEATH THE
CLOSED DOOR. PROVIDE TRANSITION STRIPS PER
MANUFACTURER'S STANDARDS.
D. PREPARE FLOORS TO RECEIVE SPECIFIED FLOOR FINISHES.
GRIND ALL HIGH AREAS AND FILL LOW AREAS WITH LATEX
CEMENT. REMOVE OLD ADHESIVE THAT WILL PROHIBIT THE
ADHESIONS OF NEW FINISHES.
E. ALL P2 LOCATIONS TO RECEIVE RB1, ALL P3 LOCATIONS TO
RECEIVE RB2 UNLESS NOTED OTHERWISE.
F. PROVIDE WHITE COVER PLATES, SWITCHES AND
RECEPTACLES.
G. ALL WALLS TO BE PAINTED P2. ALL ACCENT WALLS TO BE
PAINTED P3.
H. CEILING PAINT TO BE P1.
I. PAINT ALL EXPOSED CEILING ELEMENTS (STEEL JOISTS,
STRUCTURAL DECK, DUCTWORK, PIPING, ETC) TO BE P1.
ALIGN FLOOR PATTERN WITH CEILING BULKHEAD ABOVE.
ALL CABINETS TO BE PL1. REFERENCE INTERIOR
ELEVATIONS FOR ADDITIONAL INFORMATION.
ALL COUNTERTOPS TO BE PL2 REFERENCE INTERIOR
ELEVATION FOR ADDITIONAL INFORMATION.
1
2
1. FLOOR FINISH VARIES.
2. CEILING FINISH VARIES. REFERENCE REFLECTED CEILING
PLAN FOR ADDITIONAL INFORMATION.
3. WALL FINISH VARIES. REFERENCE INTERIOR ELEVATIONS
FOR ADDITIONAL INFORMATION.
4. EPOXY PAINT TO BE USED IN KITCHEN AREAS, TOILET
ROOMS, AND ALL "WET" AREAS.
FLOOR FINISH
CEILING FINISH
WALL FINISH
MATERIAL CONTACTMANUFACTURER COLOR #PATTERN NAME;
COLOR NAME
SHAW 802T3-AJG-69557CPT1
CPT2
LVT1 SHAW
RB1 JOHNSONITE 01 (4")
RB2 JOHNSONITE 21
P1 2143-70
P2 BENJAMIN
MOORE OC-17
P3 BENJAMIN
MOORE 2134-50
ACT1 PHILIP CAITO
317.519.2829 ARMSTRONG 1714 DUNE, 2X2 WHITE
PL1 PIONITE SG228
SHAW
BENJAMIN
MOORE
EB1 DOELLKEN-
WOODTAPE 2020
ARTHUR GALLAGHERMODULAR TILE;
MONOLITHIC INSTALL
SIMPLY WHITE
WHITE DOVE;
EGGSHELL FINISH
GULL WING GRAY;
EGGSHELL FINISH
SLATE; SUEDE FINISH
NEUTRAL WHITE; 3MM
802T4-AJG-06597 MODULAR TILE;
MONOLITHIC INSTALL
AJG-LVT1;
02500
PL2 FORMICA 918-58 NEUTRAL WHITE;
MATTE FINISH
VCT1 ARMSTRONG 51950 STATIC DISSIPATIVE TILE;
MARBLE BEIGE
PLATINUM
SNOW WHITE
ARTHURGALLAGHER@
SHAWINC.COM
ARTHUR GALLAGHER
ARTHURGALLAGHER@
SHAWINC.COM
ARTHUR GALLAGHERARTHURGALLAGHER@SHAWINC.COMLUXURY VINYL TILE
3
A203 Scale: 1/8" = 1'-0"
KEY PLAN - SECOND LEVEL NORTH
PROJECT LOCATION
NORTHFLOOR TILE -
REFERENCE FINISH
PLAN
REDUCER/TRANSITION
STRIP
DIRECT GLUE-DOWN
CARPET
FLOOR TILE - REFERENCE
FINISH PLAN
SLOP CEMENTITIOUS
MORTAR 1/4" PER FT.
MINIMUM.
DIRECT GLUE-DOWN
CARPET
WANNINGTON RUBBER
TRANSITION STRIP
- BLACK
2 1
02
A203
TYPICAL FLOOR TRANSITION DETAIL
NOT TO SCALE
01 SECOND LEVEL FINISH PLAN
-CPT1
-P2
-ACT1 -LVT1
-P2
-ACT1
23 CPT1LVT1CPT1LVT1LVT1CPT1
-CPT2
3P2,P3
-ACT1-CPT2
3P2,P3
-ACT1
-CPT2
3P2,P3
-ACT1
-CPT2
3P2,P3
-ACT1
CPT1CPT2CPT1CPT2CPT1CPT2
-CPT1
-P2
-ACT1
CPT1CPT2-CPT1
-P2
-ACT1
-CPT1
-P2
-ACT1
-CPT2
3P2,P3
-ACT1
-CPT2
3P2,P3
-ACT1
- CPT2
3P2,P3
-ACT1
-CPT2
3P2,P3
-ACT1
-VCT1
-P2
-ACT1-CPT1
-P2
-ACT1
-CPT2
-P2
-ACT1
-LVT1
-P2
-ACT1
-CPT1
-P2
-ACT1
-CPT2
-P2
-ACT1-CPT2
-P2
-ACT1
-CPT1
-P2
-ACT1CPT1CPT2 CPT2CPT1CPT2CPT1CPT1CPT2CPT1LVT1CPT2CPT1 CPT1VCT1CPT1CPT2
CPT1CPT2
-CPT1
-P2
-ACT1
P3
P3
P3P3P3 -CPT1
-P2
-ACT1P3P3P3
01/24/22