Loading...
HomeMy WebLinkAboutM004.0 24" OC SPACINGHatch Legend 2' STEP CLG B-LAY1B-A1(10) HUS26 (15) HUS26 B-A4B-B1 B-C1 B-C2 B-E1 B-M2 B-M7B-M6B-M5B-M4B-M3B-J1 B-J2 B-CJ1B-V1 B-V2 B-V3 B-V4 B-V5 B-V9 B-V10 B-V11 B-V12 B-V13 B-V14B-V15 B-V16 B-V17 B-P1B-P12X4 LEDGER (10) B-A2 (5) B-A3 (6) B-B2(6) B-M1(2) B-E2(3) B-J3(15) B-P2 3 PLY 2 PLY 2 PLY 1-04-0013-09-00 5-00-006-04-00 6-08-08 12-03-08 61-04-0086-08-006-02-00 8-11-00 71-07-0086-08-0012-00-00 18-04-08 8-08-08 10-08-00 6-02-00 4-10-00 61-00-00 20-07-00 9-09-08 9-09-08 20-07-00 61-00-00 37-03-082-00-00B-G1 B-G3B-D6(6) HUS26 B-D3 B-D1 B-F1 B-V6B-V7B-V8(5) B-G2 (2) B-D2 (2) B-D2 (2) B-D2(7) B-D4Truss Connector Total List ManufProduct Qty USP HUS26 31 IMPORTANT THIS DRAWINGIS FOR FIELD PLACEMENT OF INDIVIDUAL COMPONENTS ONLY,AND DOES NOT CONSTITUTE AN ENGINEERED DOCUMENT. NOTE PROPER BEARINGANDBEARINGDESIGN INCLUDING ANCHORAGE, ISTHERESPONSIBILITY OF THE BUILDING DESIGNER, ARCHITECT AND /OR BUILDINGENGINEER. REFER TO INDIVIDUAL TRUSS DESIGNS FOR REACTIONS,MINIMUM REQUIRED BEARINGSIZE, UPLIFT, AND ADDITIONAL LOADS. 84 COMPONENTS DOES NOT ASSUME RESPONSIBILITY IN THESE AREAS OF CONCERN. BRACING ERECTION,TEMPORARY,AND PERMANENT BRACINGIS THE RESPONSIBILITY OFTHE CONTRACTOR AND / OR BUILDING DESIGNER. REFER TOINDIVIDUAL TRUSS DESIGNS FOR ADDITIONAL BRACINGREQUIREMENTS. REFER TO BCSI-B1 SUMMARY SHEET. THE STRUCTURAL BUILDINGCOMPONENTS ASSOCIATION COMMENTARY,AND RECOMMENDATIONS FOR HANDLING,INSTALLING&BRACINGMETAL PLATE CONNECTED WOOD TRUSSES. www.sbcindustry.com INSTALLATION DO NOT CUT, DRILL, OR ALTER TRUSSES. ANYQUESTIONS CALL 84 COMPONENTS. PROPER INSTALLATION,AND HANDLINGOF COMPONENTS IS THE RESPONSIBILITY OF THE ERECTINGCONTRACTOR. 84 COMPONENTS MUST BE NOTIFIED OF ANY PROBLEMS,AND AFFORDED THE OPPORTUNITY TO REVIEW,AND MAKE NECESSARY CORRECTIONS, ORNO BACKCHARGES WILL BE ACCEPTED ORAPPROVED. WARNING WARNINGS, AND INSTRUCTIONS FORERECTION OF COMPONENTS ARE INCLUDED IN THE DELIVERY PACKAGE. KEEP THIS INFORMATION ON THE JOB SITE. THESE DOCUMENTS WILL ALSO BE NEEDED FOR JOB SITE INSPECTION. MISUSE AND IMPROPER INSTALLATION OF COMPONENTS MAY RESULT IN FAILURE,BODILY INJURY,LOSS OFPROPERTY, AND / ORLIFE. RoofArea: Overhang Length: Eave Length: HipLength: Valley Length: Ridge Length: SHEETNUMBER: R1.1 RoofTruss Placement Plan SCALE: NTS Job#: 23740 PO#: Date: 3/12/2021 Drawn By: DS Designed By: DS Checked By: ROOF LOADS: TCLL: 20.0 lb/ft² TCDL: 10.0 lb/ft² BCLL: 0.0 lb/ft² BCDL:10.0 lb/ft² Building Code: IRC 2012 Wind Speed: 115 mph On-Center Spacing: 24" U.N.O. 5800.8 SF 244.23 LF 376.61 LF 17.22 LF 243.08 LF 249.38 LF ROOF DATA THIS LAYOUTIS INTENDED FOR THE PURPOSE OF TRUSS LOCATION AND PLACEMENTONLY. REFER TO THE BUILDINGPLANS FOR ACTUAL BUILDINGCONSTRUCTION.TG180BLOTB6926 CHERRY CREEK BLVDCARMEL ,INROOF TRUSS PLACEMENTPLAN237401850 N Graham RoadFranklin, Indiana 46131Office:(317) 346-4274Fax: (317) 346-0916 10/13/21