HomeMy WebLinkAboutAB-D110 = Demolition Floor PlanVAN CLIENTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS17105
01-10-22MERCHANTSOFFICESUITE CARMEL, IN# REVISION DATE CONSTRUCTION MANAGERSTATE SUBMITTALDI L L O NCONSTRUCTIONG R O U P
B-D110
SCALE:
01 DEMOLITION PLAN
FIRST FLOOR
1/4" = 1'-0"
GENERAL DEMOLITION
NOTES
1. COORDINATE ALL DEMOLITION WORK WITH CORRESPONDING NEW
CONSTRUCTION.
2. SOLID LINES INDICATE STRUCTURE AND/OR EQUIPMENT TO REMAIN.
3. DASHED LINES INDICATE STRUCTURE AND/OR EQUIPMENT TO BE
REMOVED.
4. GENERAL CONTRACTOR SHALL PROTECT ALL FINISHES AND/OR
EQUIPMENT TO REMAIN DURING CONSTRUCTION.
5. DEMOLITION SHALL BE PERFORMED WITHOUT DAMAGE TO ADJACENT
RETAINED WORK. WHERE SUCH DAMAGE OCCURS, PATCH, REPAIR OR
OTHERWISE RESTORE TO ITS ORIGINAL CONDITION.
6. WHERE DEMOLITION WORK LEAVES HOLES OR DAMAGED SURFACES
THAT WILL BE EXPOSED IN FINISHED WORK, THE DAMAGED AREAS
SHALL BE PATCHED AND REPAIRED TO MATCH FINAL FINISH.
7. ALL ITEMS NOT SPECIFICALLY INDICATED TO BE REMOVED THAT MUST
BE DEMOLISHED TO ACCOMMODATE NEW CONSTRUCTION SHOULD BE
VERIFIED WITH ARCHITECT BEFORE PROCEEDING.
8. REMOVE ALL DEBRIS FROM THE SITE RESULTING FROM DEMOLITION,
TRANSPORT AND LEGALLY DISPOSE OFF-SITE.
9. BEFORE BEGINNING DEMOLITION, EXISTING MECHANICAL UNITS AND
EQUIPMENT SHALL BE COVERED AND PROTECTED TO PREVENT DUST
AND DEBRIS FROM ENTERING.
DEMOLITION PLAN NOTES
REMOVE STOREFRONT, FRAME, AND RELATED ITEMS ALONG WITH
WALL TO ALLOW FOR NEWGARAGE DOOR.
REMOVE EXTERIOR DOOR, FRAME AND RELATED ITEMS. SALVAGE
DOOR AND FRAME TO BE REUSED.
KEY PLAN
PROJECT
1 1
2
DEMOFLOOR PLAN2
01/31/22