Loading...
HomeMy WebLinkAboutA-D110 = Demolition Floor PlanUP UP UP VAN A-D110DEMOFLOOR PLANSCALE: 01 DEMOLITION PLAN FIRST FLOOR 3/16" = 1'-0"CLIENTPROJECTDRAWING TITLESEALSHEETPROJECT INFOREVISIONS17105 12-10-21MERCHANTSSOCIALLOUNGE CARMEL, IN# REVISION DATE CONSTRUCTION MANAGERSTATE SUBMITTAL GENERAL DEMOLITION NOTES 1. COORDINATE ALL DEMOLITION WORK WITH CORRESPONDING NEW CONSTRUCTION. 2. SOLID LINES INDICATE STRUCTURE AND/OR EQUIPMENT TO REMAIN. 3. DASHED LINES INDICATE STRUCTURE AND/OR EQUIPMENT TO BE REMOVED. 4. GENERAL CONTRACTOR SHALL PROTECT ALL FINISHES AND/OR EQUIPMENT TO REMAIN DURING CONSTRUCTION. 5. DEMOLITION SHALL BE PERFORMED WITHOUT DAMAGE TO ADJACENT RETAINED WORK. WHERE SUCH DAMAGE OCCURS, PATCH, REPAIR OR OTHERWISE RESTORE TO ITS ORIGINAL CONDITION. 6. WHERE DEMOLITION WORK LEAVES HOLES OR DAMAGED SURFACES THAT WILL BE EXPOSED IN FINISHED WORK, THE DAMAGED AREAS SHALL BE PATCHED AND REPAIRED TO MATCH FINAL FINISH. 7. ALL ITEMS NOT SPECIFICALLY INDICATED TO BE REMOVED THAT MUST BE DEMOLISHED TO ACCOMMODATE NEW CONSTRUCTION SHOULD BE VERIFIED WITH ARCHITECT BEFORE PROCEEDING. 8. REMOVE ALL DEBRIS FROM THE SITE RESULTING FROM DEMOLITION, TRANSPORT AND LEGALLY DISPOSE OFF-SITE. 9. BEFORE BEGINNING DEMOLITION, EXISTING MECHANICAL UNITS AND EQUIPMENT SHALL BE COVERED AND PROTECTED TO PREVENT DUST AND DEBRIS FROM ENTERING. DEMOLITION PLAN NOTES REMOVE INTERIOR DOOR, FRAME, AND RELATED ITEMS, SALVAGE ONE DOOR AND FRAME TO BE REUSED IN NEW SUPPLY ROOM. WALL TO BE REMOVED COMPLETELY WITH FASTENERS, ANCHORS, SEALANTS, CAULKING, ADHESIVES, ETC. 1 1 1 2 2 2 KEY PLAN 1 PROJECT 01/31/22