HomeMy WebLinkAboutE-101 = Power and System PlanTBW24/72 TBW24/36 TBW24/72 TBW24/36 TBW24/72 TBW24/36 TBW24/72 TBW24/36
TBW24/72 TBW24/36
TBW24/72 TBW24/36
30/72E30/72E30/72E30/72E30/60E
30/60E30/60E
30/60E30/72E30/72E24/84 24/9636/7224/84
24/9636/7224/84 24/9636/7224/84 24/9636/7220/6620/6620/6620/6624/84 24/9636/7224/84
24/9636/72UP
UP
VAN
2
3
2
3
2
3
2
3
2
3
2
3
23
2
23
2
1 25 W/FT ELECTRIC BASEBOARD HEAT
BELOW EXTERIOR GLAZING (TYP.)
1.83-8
480 CFM
1.9
3-8475 CFM
1.10 3-8650 CFM
1.115-1 21 500CFM
J J J J J J RAMP
01
1ELP-2
TX-1
1ERP-2
1ERP-2#2
1ERP-2#2
1ERP-2#2 1ERP-2#5
1ERP-2#5
1ERP-2#5 1ERP-2#3
1ERP-2#3
1ERP-2#3 1ERP-2#1
1ERP-2#1
1ERP-2#1 1ERP-2#3
1ERP-2#3
1ERP-2#3 1ERP-2#11ERP-2#1
1ERP-2#1
1ERP-2#4 1ERP-2#4
1ERP-2#41ERP-2#4 1ERP-2#21ERP-2#2
1ERP-2#7
1ERP-2#7
1ERP-2#7
1ERP-2#7
1ERP-2#6
1ERP-2#6 1ERP-2#6
1ERP-2#61ERP-2#41ERP-2#4
1ERP-2#4 1ERP-2#41ERP-2#21ERP-2#2 1ERP-2#7 1ERP-2#7
1ERP-2#71ERP-2#7
1ERP-2#5
1ERP-2#5
1ERP-2#6
1ERP-2#9
1ERP-2#9
1ERP-2#11
1ERP-2#101ERP-2#8
1ERP-2#11
1ERP-2#9
1ERP-2#9
1ERP-2#12
1ERP-2#13
1ERP-2#13
1ERP-2#12
1ERP-2#13
1ERP-2#12
1ELP-2#1,3,5
(3#10,#10G)
1ELP-2#141ELP-2#16
02
02
03
04
EXISTING VAV BOXES 1LPA-25,27,291LPA-20,22,24
1LPA-26,28,30
(1) 2"C
FROM EXISTING SERVICE (1) 2"C
TO NEW 200A, 480V, 3P PANEL
IN STORAGE ROOM
1ELP-2#8,10,12
02 02 02 02
1ELP-2#15 1ELP-2#17 1ELP-2#18 1ELP-2#19
1ERP-2#15
1ERP-2#17
05
05
No. 1 2000739
STATE OF
JA R E D RICHEY
RE G I STERED
INDIAN APROFESSIONAL E N GINEER
DRAWING No. :PROJECT NAME :DRAWING TITLE :ORIGINAL DRAWING IS : 30"x42"
DEEM MECHANICAL & ELECTRICAL, LLC.
RESERVES THE RIGHT TO REVISE THE
DESIGN OF THE ELECTRICAL AND/OR
MECHANICAL SYSTEMS PROVIDING THE
CHANGES MEET THE DESIGN/BUILD
SPECIFICATIONS FOR THIS PROJECT.
1
A
2 3 4 5 6
1 2 3 4 5 6
B
C
D
E
A
B
C
D
E
DRAWN BY :
DATE :
SCALE :
PROJECT No. : 1 /1 7/2022 1 0:1 2:50 AM
1 /8" = 1 '-0"410 MONON TRAIL, CARMEL, IN 46032POWER & SYSTEM PLANMERCHANTS CORPORATECENTER OFFICE ANDSOCIAL HUB TIE-101
JLS
1 2/1 3/2021
21 083
1/8" = 1'-0" 1 POWER & SYSTEMS PLAN
POWER - GENERAL NOTES
A EXPOSED CABLES INSTALLED IN A PLENUM SPACE SHALL BE PLENUM
RATED AND CONFORM TO THE CURRENT NEC. (NEC ART. 300.22(C))
B ALL RECEPTACLES MOUNTED AT OR ABOVE COUNTERS, SHELVES, ETC.,
SHALL BE VERIFIED WITH THE OWNER PRIOR TO ROUGH-IN.
C ALL RECEPTACLES MOUNTED WITHIN 6' OF A SINK, OR AS NOTED IN THE
NEC, SHALL BE GFCI PROTECTED. (NEC ART. 210.8)
D ALL WORK SHALL BE INSTALLED PARALLEL AND PERPENDICULAR TO THE
BUILDING STRUCTURE, WHERE EXPOSED. ALL EXPOSED WIRING SHALL BE
IN CONDUIT, UNLESS OTHERWISE APPROVED BY OWNER.
E ALL UNDERGROUND CONDUITS SHALL BE WATERTIGHT AND CLEAR OF ANY
DEBRIS PRIOR TO THE INSTALLATION OF CABLES / CONDUCTORS. SEAL
BOTH ENDS WITH AN APPROVED SEALENT ONCE INSTALLATION IS
COMPLETE, TO PREVENT THE ENTRANCE OF WATER OR AIR. (NEC ART.
225.27)
F RACEWAYS SHALL NOT BE PERMITTED TO SERVE AS AN EGC.
G ALL EXTERIOR PENETRATIONS, AND / OR PENETRATIONS THROUGH A
THERMAL ENVELOPE, SHALL BE SEALED WITH AN APPROVED SEALANT TO
PREVENT THE ENTRANCE OF AIR OR WATER. (NEC ART. 300.7(A))
H ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE PROPERLY
SEALED WITH AN APPROVED FIRE STOP SYSTEM GREATER THAN OR EQUAL
TO THE FIRE RATING OF THE WALL ASSEMBLY.
J MINIMIZE ROOF PENETRATIONS BY MOUNTING DISCONNECTS TO THE
ROOFTOP EQUIPMENT IT SERVES.
SHEET E-101 - KEYED NOTES
01 PROVIDE (2) 1" CONDUITS TO FLOOR RECEPT/DATA BOX UNDER
CONFERENCE ROOM TABLE. STUB CONDUIT UP NEAREST WALL TO ABOVE
CEILING.
02 PROVIDE JUNCTION BOX FOR BASEBOARD HEAT CONNECTION.
03 RELOCATED VAV BOX. EXTEND EXISTING CIRCUIT AND RECONNECT.
04 NEW VAV BOX. PROVIDE NEW 3P, 20A CIRCUIT.
05 PROVIDE SINGLE GANG BOX FOR TOUCHSCREEN WALL CONTROL. VERIFY
LOCATION WITH DOOR INSTALLER.
N REVISION SCHEDULENo. DESCRIPTION DATE1 STATESUBMISSIONS01/17/202201/31/22