Loading...
HomeMy WebLinkAboutE-101 = Power and System PlanTBW24/72 TBW24/36 TBW24/72 TBW24/36 TBW24/72 TBW24/36 TBW24/72 TBW24/36 TBW24/72 TBW24/36 TBW24/72 TBW24/36 30/72E30/72E30/72E30/72E30/60E 30/60E30/60E 30/60E30/72E30/72E24/84 24/9636/7224/84 24/9636/7224/84 24/9636/7224/84 24/9636/7220/6620/6620/6620/6624/84 24/9636/7224/84 24/9636/72UP UP VAN 2 3 2 3 2 3 2 3 2 3 2 3 23 2 23 2 1 25 W/FT ELECTRIC BASEBOARD HEAT BELOW EXTERIOR GLAZING (TYP.) 1.83-8 480 CFM 1.9 3-8475 CFM 1.10 3-8650 CFM 1.115-1 21 500CFM J J J J J J RAMP 01 1ELP-2 TX-1 1ERP-2 1ERP-2#2 1ERP-2#2 1ERP-2#2 1ERP-2#5 1ERP-2#5 1ERP-2#5 1ERP-2#3 1ERP-2#3 1ERP-2#3 1ERP-2#1 1ERP-2#1 1ERP-2#1 1ERP-2#3 1ERP-2#3 1ERP-2#3 1ERP-2#11ERP-2#1 1ERP-2#1 1ERP-2#4 1ERP-2#4 1ERP-2#41ERP-2#4 1ERP-2#21ERP-2#2 1ERP-2#7 1ERP-2#7 1ERP-2#7 1ERP-2#7 1ERP-2#6 1ERP-2#6 1ERP-2#6 1ERP-2#61ERP-2#41ERP-2#4 1ERP-2#4 1ERP-2#41ERP-2#21ERP-2#2 1ERP-2#7 1ERP-2#7 1ERP-2#71ERP-2#7 1ERP-2#5 1ERP-2#5 1ERP-2#6 1ERP-2#9 1ERP-2#9 1ERP-2#11 1ERP-2#101ERP-2#8 1ERP-2#11 1ERP-2#9 1ERP-2#9 1ERP-2#12 1ERP-2#13 1ERP-2#13 1ERP-2#12 1ERP-2#13 1ERP-2#12 1ELP-2#1,3,5 (3#10,#10G) 1ELP-2#141ELP-2#16 02 02 03 04 EXISTING VAV BOXES 1LPA-25,27,291LPA-20,22,24 1LPA-26,28,30 (1) 2"C FROM EXISTING SERVICE (1) 2"C TO NEW 200A, 480V, 3P PANEL IN STORAGE ROOM 1ELP-2#8,10,12 02 02 02 02 1ELP-2#15 1ELP-2#17 1ELP-2#18 1ELP-2#19 1ERP-2#15 1ERP-2#17 05 05 No. 1 2000739 STATE OF JA R E D RICHEY RE G I STERED INDIAN APROFESSIONAL E N GINEER DRAWING No. :PROJECT NAME :DRAWING TITLE :ORIGINAL DRAWING IS : 30"x42" DEEM MECHANICAL & ELECTRICAL, LLC. RESERVES THE RIGHT TO REVISE THE DESIGN OF THE ELECTRICAL AND/OR MECHANICAL SYSTEMS PROVIDING THE CHANGES MEET THE DESIGN/BUILD SPECIFICATIONS FOR THIS PROJECT. 1 A 2 3 4 5 6 1 2 3 4 5 6 B C D E A B C D E DRAWN BY : DATE : SCALE : PROJECT No. : 1 /1 7/2022 1 0:1 2:50 AM 1 /8" = 1 '-0"410 MONON TRAIL, CARMEL, IN 46032POWER & SYSTEM PLANMERCHANTS CORPORATECENTER OFFICE ANDSOCIAL HUB TIE-101 JLS 1 2/1 3/2021 21 083 1/8" = 1'-0" 1 POWER & SYSTEMS PLAN POWER - GENERAL NOTES A EXPOSED CABLES INSTALLED IN A PLENUM SPACE SHALL BE PLENUM RATED AND CONFORM TO THE CURRENT NEC. (NEC ART. 300.22(C)) B ALL RECEPTACLES MOUNTED AT OR ABOVE COUNTERS, SHELVES, ETC., SHALL BE VERIFIED WITH THE OWNER PRIOR TO ROUGH-IN. C ALL RECEPTACLES MOUNTED WITHIN 6' OF A SINK, OR AS NOTED IN THE NEC, SHALL BE GFCI PROTECTED. (NEC ART. 210.8) D ALL WORK SHALL BE INSTALLED PARALLEL AND PERPENDICULAR TO THE BUILDING STRUCTURE, WHERE EXPOSED. ALL EXPOSED WIRING SHALL BE IN CONDUIT, UNLESS OTHERWISE APPROVED BY OWNER. E ALL UNDERGROUND CONDUITS SHALL BE WATERTIGHT AND CLEAR OF ANY DEBRIS PRIOR TO THE INSTALLATION OF CABLES / CONDUCTORS. SEAL BOTH ENDS WITH AN APPROVED SEALENT ONCE INSTALLATION IS COMPLETE, TO PREVENT THE ENTRANCE OF WATER OR AIR. (NEC ART. 225.27) F RACEWAYS SHALL NOT BE PERMITTED TO SERVE AS AN EGC. G ALL EXTERIOR PENETRATIONS, AND / OR PENETRATIONS THROUGH A THERMAL ENVELOPE, SHALL BE SEALED WITH AN APPROVED SEALANT TO PREVENT THE ENTRANCE OF AIR OR WATER. (NEC ART. 300.7(A)) H ALL PENETRATIONS THROUGH FIRE RATED WALLS SHALL BE PROPERLY SEALED WITH AN APPROVED FIRE STOP SYSTEM GREATER THAN OR EQUAL TO THE FIRE RATING OF THE WALL ASSEMBLY. J MINIMIZE ROOF PENETRATIONS BY MOUNTING DISCONNECTS TO THE ROOFTOP EQUIPMENT IT SERVES. SHEET E-101 - KEYED NOTES 01 PROVIDE (2) 1" CONDUITS TO FLOOR RECEPT/DATA BOX UNDER CONFERENCE ROOM TABLE. STUB CONDUIT UP NEAREST WALL TO ABOVE CEILING. 02 PROVIDE JUNCTION BOX FOR BASEBOARD HEAT CONNECTION. 03 RELOCATED VAV BOX. EXTEND EXISTING CIRCUIT AND RECONNECT. 04 NEW VAV BOX. PROVIDE NEW 3P, 20A CIRCUIT. 05 PROVIDE SINGLE GANG BOX FOR TOUCHSCREEN WALL CONTROL. VERIFY LOCATION WITH DOOR INSTALLER. N REVISION SCHEDULENo. DESCRIPTION DATE1 STATESUBMISSIONS01/17/202201/31/22