HomeMy WebLinkAboutE-501 = One-Line DiagramNo. 1 2000739
STATE OF
JA R E D RICHEY
RE G I STERED
INDIAN APROFESSIONAL E N GINEER
DRAWING No. :PROJECT NAME :DRAWING TITLE :ORIGINAL DRAWING IS : 30"x42"
DEEM MECHANICAL & ELECTRICAL, LLC.
RESERVES THE RIGHT TO REVISE THE
DESIGN OF THE ELECTRICAL AND/OR
MECHANICAL SYSTEMS PROVIDING THE
CHANGES MEET THE DESIGN/BUILD
SPECIFICATIONS FOR THIS PROJECT.
1
A
2 3 4 5 6
1 2 3 4 5 6
B
C
D
E
A
B
C
D
E
DRAWN BY :
DATE :
SCALE :
PROJECT No. : 1 /1 7/2022 1 0:1 2:54 AM410 MONON TRAIL, CARMEL, IN 46032ONE-LINE DIAGRAMMERCHANTS CORPORATECENTER OFFICE ANDSOCIAL HUB TIE-501
JLS
1 2/1 3/2021
21 083
T-1
30 kVA
480D-208Y/120V
1ELP-2
200A
480/277V
3PH-4W
1ERP-2
100A
208/120V
3PH-4W
MDP
SHEET E-501 - KEYED NOTES
DISTRIBUTION - GENERAL NOTES
A CONDUIT SIZES ARE MINIMUM GUIDELINES, AND MAY NOT COVER ALL
INSTALLATIONS. IT IS ACCEPTABLE TO ADJUST CONDUIT SIZE BASED ON
RACEWAY TYPE, PER NEC REQUIREMENTS.
B EACH PARALLEL RUN SHALL BE ELECTRICALLY SIMILAR, AND CONTAIN THE
SAME NUMBER OF CONDUCTORS / CABLES. COMPLY WITH ALL NEC
REQUIREMENTS FOR PARALLEL INSTALLATIONS. (NEC ART. 310.10(H))
C SEPARATELY DERIVED SYSTEMS SHALL HAVE A SUPPLY SIDE BONDING
JUMPER INSTALLED PER NEC ART. 250.102(C), WHERE APPLICABLE. (NEC
ART. 250.30(A)(2))
D EC SHALL COORDINATE THE AIC RATINGS OF ALL EQUIPMENT AND VERIFY
THAT IT IS CORRECT, PRIOR TO PURCHASE / INSTALLATION OF EQUIPMENT.
SERIES RATINGS SHALL NOT BE ALLOWED FOR EQUIPMENT SERVING
MOTOR LOADS. (NEC ART. 240.86(C))
E EMERGENCY SYSTEMS SHALL BE ISOLATED AND MARKED AS REQUIRED BY
CODE. (NEC ART. 700.7(A) & NEC ART. 700.10)
F WHERE GROUND FAULT PROTECTION IS REQUIRED, A FUNCTIONAL
PERFORMANCE VERIFICATION TEST SHALL BE PERFORMED AFTER THE
EQUIPMENT IS INSTALLED, PRIOR TO BEING ENERGIZED BY THE SOURCE.
UTILIZING THE "PUSH TO TRIP" FEATURE IS NOT ALLOWED. TESTING SHALL
BE PERFORMED UTILIZING A PRIMARY CURRENT INJECTION TEST SET. THE
TESTING RESULTS SHALL BE SUBMITTED TO THE ENGINEER OF RECORD
AND BE MADE AVAILABLE UPON REQUEST TO THE AHJ. IT IS THE
RESPONSIBILITY OF THE EC TO DETERMINE IF THIRD PARTY TESTING IS
REQUIRED BY THE AHJ. (NEC ART. 230.95)
NOTES:
1. SIZING IS BASED ON THHN/THWN-2 OR XHHW WIRING, EMT/IMC/GRC/FMC/
SCH. 40 PVC CONDUIT, 75C TERMINATIONS PER NEC ART. 110.14(C). MOTOR
EQUIPMENT GROUNDING CONDUCTORS BASED ON 250% x FLA OVERCURRENT
PROTECTION.
2. DESIGNATION DEFINITIONS: (F0000NG-AL)
"F" = FEEDER
"M" = MOTOR FEEDER / BRANCH CIRCUIT
"T" = TRANSFORMER SECONDARY CONDUCTORS
"0000" = INDICATES FEEDER ID NUMBER, GROUPED BY AMPACITY
"N" = PROVIDE NEUTRAL / GROUNDED CONDUCTOR
"G" = PROVIDE GROUND CONDUCTOR
"-AL" OR "-CU" = INDICATES ALUMINUM OR COPPER CONDUCTORS
3. SOME FEEDERS MAY NOT BE USED ON THIS PROJECT.
FEEDER SCHEDULE
FEEDER ID
CONDUCTOR SIZE AND QUANTITY PER
CONDUIT / RUN (AWG OR KCMIL)
CONDUIT SIZE AND TOTAL
QUANTITY
PHASE NEUTRAL GROUND SIZE No. OF RUNS
F0030G-CU (3) 10 -- (1) 10 3/4"1
F0050G-CU (3) 8 -- (1) 10 3/4"1
F0200NG-AL (3) 4/0 (1) 4/0 (1) 4 2"1
T0100NG-CU (3) 1 (1) 1 (1) 6 1-1/2"1
A/C UNIT
F0200NG-AL
F0050G-CU
T0100NG-CU
F0030G-CU
REVISION SCHEDULENo. DESCRIPTION DATE1 STATESUBMISSIONS01/17/202201/31/22