Loading...
HomeMy WebLinkAboutE-501 = One-Line DiagramNo. 1 2000739 STATE OF JA R E D RICHEY RE G I STERED INDIAN APROFESSIONAL E N GINEER DRAWING No. :PROJECT NAME :DRAWING TITLE :ORIGINAL DRAWING IS : 30"x42" DEEM MECHANICAL & ELECTRICAL, LLC. RESERVES THE RIGHT TO REVISE THE DESIGN OF THE ELECTRICAL AND/OR MECHANICAL SYSTEMS PROVIDING THE CHANGES MEET THE DESIGN/BUILD SPECIFICATIONS FOR THIS PROJECT. 1 A 2 3 4 5 6 1 2 3 4 5 6 B C D E A B C D E DRAWN BY : DATE : SCALE : PROJECT No. : 1 /1 7/2022 1 0:1 2:54 AM410 MONON TRAIL, CARMEL, IN 46032ONE-LINE DIAGRAMMERCHANTS CORPORATECENTER OFFICE ANDSOCIAL HUB TIE-501 JLS 1 2/1 3/2021 21 083 T-1 30 kVA 480D-208Y/120V 1ELP-2 200A 480/277V 3PH-4W 1ERP-2 100A 208/120V 3PH-4W MDP SHEET E-501 - KEYED NOTES DISTRIBUTION - GENERAL NOTES A CONDUIT SIZES ARE MINIMUM GUIDELINES, AND MAY NOT COVER ALL INSTALLATIONS. IT IS ACCEPTABLE TO ADJUST CONDUIT SIZE BASED ON RACEWAY TYPE, PER NEC REQUIREMENTS. B EACH PARALLEL RUN SHALL BE ELECTRICALLY SIMILAR, AND CONTAIN THE SAME NUMBER OF CONDUCTORS / CABLES. COMPLY WITH ALL NEC REQUIREMENTS FOR PARALLEL INSTALLATIONS. (NEC ART. 310.10(H)) C SEPARATELY DERIVED SYSTEMS SHALL HAVE A SUPPLY SIDE BONDING JUMPER INSTALLED PER NEC ART. 250.102(C), WHERE APPLICABLE. (NEC ART. 250.30(A)(2)) D EC SHALL COORDINATE THE AIC RATINGS OF ALL EQUIPMENT AND VERIFY THAT IT IS CORRECT, PRIOR TO PURCHASE / INSTALLATION OF EQUIPMENT. SERIES RATINGS SHALL NOT BE ALLOWED FOR EQUIPMENT SERVING MOTOR LOADS. (NEC ART. 240.86(C)) E EMERGENCY SYSTEMS SHALL BE ISOLATED AND MARKED AS REQUIRED BY CODE. (NEC ART. 700.7(A) & NEC ART. 700.10) F WHERE GROUND FAULT PROTECTION IS REQUIRED, A FUNCTIONAL PERFORMANCE VERIFICATION TEST SHALL BE PERFORMED AFTER THE EQUIPMENT IS INSTALLED, PRIOR TO BEING ENERGIZED BY THE SOURCE. UTILIZING THE "PUSH TO TRIP" FEATURE IS NOT ALLOWED. TESTING SHALL BE PERFORMED UTILIZING A PRIMARY CURRENT INJECTION TEST SET. THE TESTING RESULTS SHALL BE SUBMITTED TO THE ENGINEER OF RECORD AND BE MADE AVAILABLE UPON REQUEST TO THE AHJ. IT IS THE RESPONSIBILITY OF THE EC TO DETERMINE IF THIRD PARTY TESTING IS REQUIRED BY THE AHJ. (NEC ART. 230.95) NOTES: 1. SIZING IS BASED ON THHN/THWN-2 OR XHHW WIRING, EMT/IMC/GRC/FMC/ SCH. 40 PVC CONDUIT, 75C TERMINATIONS PER NEC ART. 110.14(C). MOTOR EQUIPMENT GROUNDING CONDUCTORS BASED ON 250% x FLA OVERCURRENT PROTECTION. 2. DESIGNATION DEFINITIONS: (F0000NG-AL) "F" = FEEDER "M" = MOTOR FEEDER / BRANCH CIRCUIT "T" = TRANSFORMER SECONDARY CONDUCTORS "0000" = INDICATES FEEDER ID NUMBER, GROUPED BY AMPACITY "N" = PROVIDE NEUTRAL / GROUNDED CONDUCTOR "G" = PROVIDE GROUND CONDUCTOR "-AL" OR "-CU" = INDICATES ALUMINUM OR COPPER CONDUCTORS 3. SOME FEEDERS MAY NOT BE USED ON THIS PROJECT. FEEDER SCHEDULE FEEDER ID CONDUCTOR SIZE AND QUANTITY PER CONDUIT / RUN (AWG OR KCMIL) CONDUIT SIZE AND TOTAL QUANTITY PHASE NEUTRAL GROUND SIZE No. OF RUNS F0030G-CU (3) 10 -- (1) 10 3/4"1 F0050G-CU (3) 8 -- (1) 10 3/4"1 F0200NG-AL (3) 4/0 (1) 4/0 (1) 4 2"1 T0100NG-CU (3) 1 (1) 1 (1) 6 1-1/2"1 A/C UNIT F0200NG-AL F0050G-CU T0100NG-CU F0030G-CU REVISION SCHEDULENo. DESCRIPTION DATE1 STATESUBMISSIONS01/17/202201/31/22