Loading...
HomeMy WebLinkAboutA400.4 - SECTIONS 4TH PARAPETT.O. PARAPET +150' -0" TRUSS BEARING +144' -5 1/4" T.O. BREEZEWAY PARAPET +153' -4" 2X4 STUDS -SEE STRUCTURAL AIR AND WATER BARRIER SHEATHING ROOF SHEATHING TPO ROOF MEMBRANE OVER 1/2" RECOVERY BOARD TPO ROOF MEMBRANE **STOP AT THIS POINT** WRAP AIR AND WATER VAPOR BARRIER OVER TOP OF PARAPET AND LAP OVER TOP OF TPO ROOF MEMBRANE 14" DIA. VENTS AT 24" O.C.1' - 4" O.C.2X6 KNEE WALL BRICK VENEER WITH TIES AT 16" O.C. VERTICAL, AND 32" O.C. HORIZONTAL (STAGGERED) AIR GAP RUN TPO ROOF UP WALL 2X6 PARAPET FRAMING AND BRACING AT 24" O.C. R-38 MIN. SPRAY FOAM INSULATION R-19 MIN. SPRAY FOAM INSULATION AT WALL ROOF SHEATHING FIRE RATED ROOF / CEILING ASSEMBLY CF-2 ROOF TRUSSES WITH SLOPED TOP CHORD AT 1/4:12 -SEE STRUCTURAL CAULK BOTTOM OF TRIM, TYPICAL 4/4 X 7.25" OVER 4/4 X 11.25" SMOOTH FIBER CEMENT TRIM PREFINISHED METAL COPING W/ SLOPED TOP AND DRIP EDGE, BOTH SIDES CONT. TREATED 2X8 NAILING CAP -RIP TO WIDTH SMOOTH FIBER CEMENT BATTEN STRIP (PANEL LOCATIONS -SEE ELEVATIONS), CAULK TOP AND BOTTOM PREFINISHED METAL FLASHING WITH DRIP EDGE OVER 4/4 X 5.5" SMOOTH FIBER CEMENT TRIM, LAP AIR AND WATER BARRIER OVER TOP SMOOTH FIBER CEMENT PANEL CONT. SEALANT 7 1/4" AZEK CROWN MOULDING 4/4 X 3.5" SMOOTH FIBER CEMENT TRIM -CAULK BOTTOM EDGE 4/4 X 5.5" SMOOTH FIBER CEMENT TRIM 4/4 X 7.25" SMOOTH FIBER CEMENT TRIM WITH SLOPED TOP 4/4 X 11.25" SMOOTH FIBER CEMENT TRIM SMOOTH FIBER CEMENT BATTEN STRIP (BAND LINE WRAPS ENTIRE BUILDING -SEE ELEVATIONS), CAULK TOP AND BOTTOM 2X8, 2X4, 2X2 & 1X6 BLOCKING CONT. TREATED 2X12 NAILING CAP -RIP TO WIDTH SMOOTH FIBER CEMENT BATTEN STRIP (PANEL LOCATIONS -SEE ELEVATIONS), CAULK TOP AND BOTTOM PREFINISHED METAL FLASHING WITH DRIP EDGE, EXTEND UNDER METAL COPING BRICK SOLDIER COURSE T.O. PARAPET +150' -0" TRUSS BEARING +144' -5 1/4" T.O. BREEZEWAY PARAPET +153' -4" CAULK BOTTOM OF TRIM, TYPICAL WALL SHEATHING 4/4 X 7.25" OVER 4/4 X 11.25" SMOOTH FIBER CEMENT TRIM PREFINISHED METAL COPING W/ SLOPED TOP AND DRIP EDGE, BOTH SIDES CONT. TREATED 2X8 NAILING CAP -RIP TO WIDTH TPO ROOF MEMBRANE **STOP AT THIS POINT** 4" (R-20) POLYISO ROOF DECK INSULATION SMOOTH FIBER CEMENT BATTEN STRIP (PANEL LOCATIONS -SEE ELEVATIONS), CAULK TOP AND BOTTOM ROOF SHEATHING WRAP AIR AND WATER VAPOR BARRIER OVER TOP OF PARAPET AND LAP OVER TOP OF TPO ROOF MEMBRANE 2X4 BRACING AT 24" O.C. RUN TPO ROOF UP WALL PREFINISHED METAL FLASHING WITH DRIP EDGE OVER 4/4 X 5.5" SMOOTH FIBER CEMENT TRIM, LAP AIR AND WATER BARRIER OVER TOP SMOOTH FIBER CEMENT PANEL 1' - 4" O.C.2X6 PARAPET FRAMING AND BRACING AT 24" O.C. 4" DIA. VENTS AT 24" O.C. TPO ROOF MEMBRANE ** STOP AT THIS POINT ** FIRE RATED ROOF / CEILING ASSEMBLY CF-2 R-38 MIN. SPRAY FOAM INSULATION ROOF TRUSSES TPO ROOF MEMBRANE OVER 1/2" RECOVERY BOARD RUN TPO ROOF UP WALL ROOF SHEATHING ROOF SHEATHING T.O. PARAPET +150' -0" TRUSS BEARING +144' -5 1/4" AIR AND WATER BARRIER 1/2" OSB SHEATHING DRAINAGE MAT SMOOTH FIBER CEMENT BEAM WRAP OVER TWO LAYERS OF SOFFIT BOARD PER RATED CEILING ASSEMBLY CF-3 4/4 X 5.5" SMOOTH FIBER CEMENT TRIM HEADER -SEE STRUCTURAL CONTINUOUS SEALANT STEEL LINTEL -SEE STRUCTURAL FLASHING W/ WEEPS AT 24" O.C. SOLDIER COURSE -SEE ELEV.5" O.C.AIR GAP BRICK SOLDIER COURSE, CONT. SEALANT BRICK VENEER WITH TIES AT 16" O.C. VERT. AND 32" O.C. HORIZONTAL (STAGGERED) TPO ROOF MEMBRANE **STOP AT THIS POINT** TPO ROOF MEMBRANE OVER 1/2" RECOVERY BOARD ROOF SHEATHING 2X4 PARAPET WALL FRAMING AND BRACING AT 24" O.C. OR INTEGRAL WITH TRUSS 7 1/4" AZEK CROWN MOULDING 4/4 X 3.5" SMOOTH FIBER CEMENT TRIM -CAULK BOTTOM EDGE 4/4 X 5.5" SMOOTH FIBER CEMENT TRIM 4/4 X 7.25" SMOOTH FIBER CEMENT TRIM WITH SLOPED TOP 4/4 X 11.25" SMOOTH FIBER CEMENT TRIM SMOOTH FIBER CEMENT BATTEN STRIP (BAND LINE WRAPS ENTIRE BUILDING -SEE ELEVATIONS), CAULK TOP AND BOTTOM 2X8, 2X4, 2X2 & 1X4 BLOCKING PREFINISHED METAL FLASHING WITH DRIP EDGE, EXTEND UNDER METAL COPING PREFINISHED METAL COPING W/ SLOPED TOP AND DRIP EDGE, BOTH SIDES CONT. TREATED 2X12 NAILING CAP -RIP TO WIDTH SMOOTH FIBER CEMENT BATTEN STRIP (PANEL LOCATIONS -SEE ELEVATIONS), CAULK TOP AND BOTTOM WRAP AIR AND WATER VAPOR BARRIER OVER TOP OF PARAPET AND LAP OVER TOP OF TPO ROOF MEMBRANE ROOF TRUSSES WITH SLOPED TOP CHORD AT 1/4:12 -SEE STRUCTURAL 48" WIDE SMOOTH FIBER CEMENT PANELS, RUN PERPENDICULAR TO JOISTS, USE EQUAL WIDTH PIECES FOR SYMMETRICAL APPEARANCE, COVER JOINTS WITH 2.5" SMOOTH BATTENS T.O. PARAPET +150' -0" TRUSS BEARING +144' -5 1/4"5" O.C.BRICK SOLDIER COURSE, CONT. SEALANT 2X4 STUDS -SEE STRUCTURAL AIR AND WATER BARRIER SHEATHING BRICK VENEER WITH TIES AT 16" O.C. VERT. AND 32" O.C. HORIZONTAL (STAGGERED) R-38 MIN. SPRAY FOAM INSULATION R-19 MIN. SPRAY FOAM INSULATION AT WALL TPO ROOF MEMBRANE **STOP AT THIS POINT** TPO ROOF MEMBRANE OVER 1/2" RECOVERY BOARD ROOF SHEATHING 2X4 PARAPET WALL FRAMING AND BRACING AT 24" O.C. OR INTEGRAL WITH TRUSS 7 1/4" AZEK CROWN MOULDING 4/4 X 3.5" SMOOTH FIBER CEMENT TRIM -CAULK BOTTOM EDGE 4/4 X 5.5" SMOOTH FIBER CEMENT TRIM 4/4 X 7.25" SMOOTH FIBER CEMENT TRIM WITH SLOPED TOP 4/4 X 11.25" SMOOTH FIBER CEMENT TRIM SMOOTH FIBER CEMENT BATTEN STRIP (BAND LINE WRAPS ENTIRE BUILDING -SEE ELEVATIONS), CAULK TOP AND BOTTOM 2X8, 2X4, 2X2 & 1X4 BLOCKING PREFINISHED METAL FLASHING WITH DRIP EDGE, EXTEND UNDER METAL COPING PREFINISHED METAL COPING W/ SLOPED TOP AND DRIP EDGE, BOTH SIDES CONT. TREATED 2X12 NAILING CAP -RIP TO WIDTH SMOOTH FIBER CEMENT BATTEN STRIP (PANEL LOCATIONS -SEE ELEVATIONS), CAULK TOP AND BOTTOM WRAP AIR AND WATER VAPOR BARRIER OVER TOP OF PARAPET AND LAP OVER TOP OF TPO ROOF MEMBRANE FIRE RATED ROOF / CEILING ASSEMBLY CF-2 AIR GAP ROOF TRUSSES WITH SLOPED TOP CHORD AT 1/4:12 -SEE STRUCTURAL T.O. PARAPET +150' -0" TRUSS BEARING +144' -5 1/4" 2X4 STUDS -SEE STRUCTURAL AIR AND WATER BARRIER SHEATHING FIRE-RATED ROOF / CEILING ASSEMBLY CF-2 SMOOTH FIBER CEMENT LAP SIDING PREFINISHED METAL COPING W/ SLOPED TOP AND DRIP EDGE, BOTH SIDES CONT. TREATED 2X6 NAILING CAP -RIP TO WIDTH 2X4 PARAPET WALL FRAMING AND BRACING AT 24" O.C. OR INTEGRAL WITH TRUSS R-38 MIN. SPRAY FOAM INSULATION R-19 MIN. SPRAY FOAM INSULATION AT WALL TPO ROOF MEMBRANE **STOP AT THIS POINT** TOP ROOF MEMBRANE OVER 1/2" RECOVERY BOARD ROOF SHEATHING WRAP AIR AND WATER VAPOR BARRIER OVER TOP OF PARAPET AND LAP OVER TOP OF TPO ROOF MEMBRANE 5" O.CCONT. SEALANT 7 1/4" AZEK CROWN MOULDING 4/4 X 3.5" SMOOTH FIBER CEMENT TRIM -CAULK BOTTOM EDGE 4/4 X 5.5" SMOOTH FIBER CEMENT TRIM 4/4 X 7.25" SMOOTH FIBER CEMENT TRIM WITH SLOPED TOP 4/4 X 11.25" SMOOTH FIBER CEMENT TRIM SMOOTH FIBER CEMENT BATTEN STRIP (BAND LINE WRAPS ENTIRE BUILDING -SEE ELEVATIONS), CAULK TOP AND BOTTOM 2X8, 2X4, 2X2 & 1X4 BLOCKING SMOOTH FIBER CEMENT BATTEN STRIP (PANEL LOCATIONS -SEE ELEVATIONS), CAULK TOP AND BOTTOM PREFINISHED METAL FLASHING WITH DRIP EDGE, EXTEND UNDER METAL COPING ROOF TRUSSES WITH SLOPED TOP CHORD AT 1/4:12 -SEE STRUCTURAL T.O. PARAPET +150' -0" TRUSS BEARING +144' -5 1/4" TRUSS BASE HEIGHT +147' -5 1/4" BRICK SOLDIER COURSE, CONT. SEALANT 2X4 STUDS -SEE STRUCTURAL AIR AND WATER BARRIER SHEATHING BRICK VENEER WITH TIES AT 16" O.C. VERT. AND 32" O.C. HORIZONTAL (STAGGERED) R-38 MIN. SPRAY FOAM INSULATION R-19 MIN. SPRAY FOAM INSULATION AT WALL TPO ROOF MEMBRANE **STOP AT THIS POINT** TPO ROOF MEMBRANE OVER 1/2" RECOVERY BOARD ROOF SHEATHING 2X4 PARAPET WALL FRAMING AND BRACING AT 24" O.C. OR INTEGRAL WITH TRUSS 7 1/4" AZEK CROWN MOULDING 4/4 X 3.5" SMOOTH FIBER CEMENT TRIM -CAULK BOTTOM EDGE 4/4 X 5.5" SMOOTH FIBER CEMENT TRIM 4/4 X 7.25" SMOOTH FIBER CEMENT TRIM WITH SLOPED TOP 4/4 X 11.25" SMOOTH FIBER CEMENT TRIM SMOOTH FIBER CEMENT BATTEN STRIP (BAND LINE WRAPS ENTIRE BUILDING -SEE ELEVATIONS), CAULK TOP AND BOTTOM 2X8, 2X4, 2X2 & 1X4 BLOCKING PREFINISHED METAL FLASHING WITH DRIP EDGE, EXTEND UNDER METAL COPING PREFINISHED METAL COPING W/ SLOPED TOP AND DRIP EDGE, BOTH SIDES CONT. TREATED 2X12 NAILING CAP -RIP TO WIDTH SMOOTH FIBER CEMENT BATTEN STRIP (PANEL LOCATIONS -SEE ELEVATIONS), CAULK TOP AND BOTTOM WRAP AIR AND WATER VAPOR BARRIER OVER TOP OF PARAPET AND LAP OVER TOP OF TPO ROOF MEMBRANE FIRE RATED ROOF / CEILING ASSEMBLY CF-2 5" O.C.AIR GAPROOF TRUSSES WITH SLOPED TOP CHORD AT 1/4:12 -SEE STRUCTURAL DATE 155 EAST MARKET STREETSECOND FLOOR, SUITE 200 INDIANAPOLIS, INDIANA 46204 T 317.721.2724 ROTTMANNCOLLIER.COM SCOPE DOCUMENT THESE DOCUMENTS INDICATE THE GENERAL SCOPE OF THE PROJECT IN TERMS OFARCHITECTURAL DESIGN CONCEPT, DIMENSIONS OF THE BUILDING, MAJOR ARCHITECTURALELEMENTS AND TYPE OF STRUCTURAL, MECHANICAL AND ELECTRICAL SYSTEMS. THE DRAWINGS DO NOT CECESSARILY INDICATE OR DESCRIBE ALL WORK REQUIRED FOR FULLPERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT. ON THE BASIS OF THE GENERAL SCOPE INDIACATED OR DESCRIBED, TRADE CONTRACTOR SHALL FURNISH ALL ITEMS REQUIRED FOR PROPER EXECUTION AND COMPLETION OF THE WORK SHEET PROJECT NO. REVISIONSMÉLANGE FLATSA NEW MULTIFAMILY RESIDENTIALBLOCK DEVELOPMENTFIREHOUSE DEVELOPMENTCARMEL, INDIANA 4603203-05-2021 OWNER REVIEW SET 08-16-2021 CONSTRUCTION SET 11-01-2021 ADDENDUM 1 A4-4 SECTIONS -4TH / PARAPET 03-05-2021 19112 3/4" = 1'-0" 1 PARAPET SECTION 1 3/4" = 1'-0" 2 PARAPET SECTION 2 3/4" = 1'-0" 3 PARAPET SECTION 3 3/4" = 1'-0" 6 PARAPET SECTION 4 3/4" = 1'-0" 5 PARAPET SECTION 5 -REVIEW 3/4" = 1'-0"4 PARAPET SECTION 6 -REVIEW 01/31/22